The rotational speed of the spacecraft was gradually reduced over several days after liftoff and the rotational axis was changed to achive the most stable configuration of the spacecraft 5 days after liftoff. Deployment of solar cell panels and sun-aquisition control. The x-ray telescope was extended 10 days after liftoff on March 2 and performance verification of observational instruments started.