This is BATSE trigger #3439

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 3439...

Location (J2000 degrees)

Times

 The start date: 02/23/95
 The Start time: 2:23:9

 The Burst trigger time (seconds of day) :  8588.721500
 The Burst load time (seconds of day)    :  8588.751700

IBDB background

Start time (day,seconds) 9771 2965.214563 End time (day,seconds) 9771 14184.158562

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Multi-peaked, dur.~130 s, max. at ~T+2 s, strong spectral evolution. Visibl e above 300 keV.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.