 The start date: 11/28/95
 The Start time: 10:26:41

 The Burst trigger time (seconds of day) : 37600.945609
 The Burst load time (seconds of day)    : 37600.975969

IBDB background

Start time (day,seconds) 10049 31946.461500 End time (day,seconds) 10049 43298.527875

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse, dur ~ 10s. Nearly equal max at ~ T-1s. and T+6s. First dur ~ 2 s., second dur. ~3.5 s. Visible above 300 keV. Possible precursor at ~ T -100 s. Occultation source just before trigger in module 6 + 7