This is BATSE trigger #6029

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6029...

Location (J2000 degrees)

Times

 The start date: 02/06/97
 The Start time: 0:13:18

 The Burst trigger time (seconds of day) :   798.409469
 The Burst load time (seconds of day)    :   798.440547

IBDB background

Start time (day,seconds) 10484 81614.582656 End time (day,seconds) 10485 6329.077031

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse dur.~15 s. Visible above 300 keV. Possible successor at ~T+433 0 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.