This is BATSE trigger #6111

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6111...

Location (J2000 degrees)

Times

 The start date: 03/02/97
 The Start time: 18:42:25

 The Burst trigger time (seconds of day) : 67345.097469
 The Burst load time (seconds of day)    : 67345.127813

IBDB background

Start time (day,seconds) 10509 61891.318422 End time (day,seconds) 10509 72940.278422

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse, rise is faster than decay, dur.~40 s. Visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.