This is BATSE trigger #6111
Light Curves...
View each of the 4 discriminator channels.
More about trigger 6111...
Location (J2000 degrees)
- Right Ascension: 275.922
- Declination: 21.024
- RMS error for location: 2.90097
Times
The start date: 03/02/97
The Start time: 18:42:25
The Burst trigger time (seconds of day) : 67345.097469
The Burst load time (seconds of day) : 67345.127813
IBDB background
Start time (day,seconds) 10509 61891.318422
End time (day,seconds) 10509 72940.278422
Trigger Specifics
This burst triggered on the 1024 ms time scale.
Triggered Detectors:
- Detector 3 exceeded threshold.
- Detector 7 exceeded threshold.
Burst Processing Comment:
GRB. Single pulse, rise is faster than decay, dur.~40 s. Visible above 300 keV.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.