This is BATSE trigger #6225
Light Curves...
View each of the 4 discriminator channels.
More about trigger 6225...
Location (J2000 degrees)
- Right Ascension: 132.408
- Declination: 80.623
- RMS error for location: 2.29957
Times
The start date: 05/08/97
The Start time: 21:41:47
The Burst trigger time (seconds of day) : 78106.825469
The Burst load time (seconds of day) : 78106.852312
IBDB background
Start time (day,seconds) 10576 72752.886562
End time (day,seconds) 10576 83879.670516
Trigger Specifics
This burst triggered on the 256 ms time scale.
Triggered Detectors:
- Detector 3 exceeded threshold.
- Detector 7 exceeded threshold.
Burst Processing Comment:
GRB. Single pulse, slowly increasing emission starts at ~T-10 s. Main pulse has rise faster than decay, max at ~T+2 s, dur.~10 s. Visible above 300 keV. Total dur.~35 s.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.