skip to content
 
XMM-Newton Guest Observer Facility

THE XMM-NEWTON AO-5 BUDGET SUMMARY FORM


New for AO-5, the budget summary is now a required entry in the RPS system. For the form, many entries will not be included in the hardcopy output but will be replaced with NR. This is due to the change of evaluating the requested support in terms of required labor rather than dollar amounts. NOTE: As part of the budget justification, explain the following proposed costs applicable to your proposal. However, in the budget justification, for labor include only FTEs and not dollar amounts. Also, do not include any discussion of overheads or administrative costs in the justification.

  1. Total Direct Labor: This is the requested labor which can be divided into three general experience/salary levels. Senior Researcher/Professor, Junior Research/Post-Doc, and Graduate Student.
    • FTE: The full-time equivalent (i.e., fraction of one year) of support being requested.
    • Salary & Fringe Benefits: Yearly base salary plus fringe benefits but not including overhead. The salary overhead will be included in Item 5.
  2. Total Other Direct Costs: Do not include overhead charges for any item in this section. The required overheads should be included in Item 5.
    • Equipment: List items over $500 separately in the budget justification and explain the need for items costing more than $5,000. Describe basis for estimated cost. General purpose equipment is not allowable as a direct cost unless specifically approved by the NASA Grant Officer. Any equipment purchase requested to be made as a direct charge under this award must include the equipment description, how it will be used in the conduct of the basic research proposed and why it cannot be purchased with indirect funds.
    • Travel: Describe the purpose of the proposed travel in relation to the grant and provide the basis of estimate, including information on destination and number of travelers where known.
    • Publication Charges: Provide expected number of papers.
    • Supplies: Provide general categories of needed supplies, the method of acquisition, and the estimated cost.
    • Other: Enter any direct costs not covered by 2a through 2d. Attach an itemized list explaining the need for each item and the basis for the estimate.
    • Other: Additional space for any direct costs not covered by 2a through 2d.
    • Other: Additional space for any direct costs not covered by 2a through 2d.
  3. Other Applicable Costs: Enter total and explain the need for each item.
  4. Graduate Student Tuition Remission:
  5. Facilities and Administrative (F&A) Costs: This is the entry for all institutional overheads. Identify F&A cost rate(s) and base(s) as approved by the cognizant Federal agency, including the effective period of the rate. Provide the name, address, and telephone number of the Federal agency official having cognizance. If unapproved rates are used, explain why, and include the computational basis for the indirect expense pool and corresponding allocation base for each rate.
  6. Subgrants (other institutions): Total of subgrants to be paid directly to other institutions, and is computed by RPS.
  7. Total Estimated Costs:



If you have any questions concerning XMM-Newton send e-mail to xmmhelp@lists.nasa.gov

This file was last modified on Wednesday, 15-Feb-2006 18:03:04 EST
Curator:Michael Arida (SP Sys); michael.arida@nasa.gov

NASA Astrophysics

  • FAQ/Comments/Feedback
  • Education Resources
  • Download Adobe Acrobat
  • A service of the Astrophysics Science Division (ASD) at NASA/ GSFC

    XMM-Newton Project Scientist: Dr. Richard Mushotzky

    Responsible NASA Official: Phil Newman

    Privacy Policy and Important Notices.