This is BATSE trigger # 2134
Light Curves...
View each of the 4 discriminator channels.
More about trigger 2134...
Location (J2000 degrees)
- Right Ascension: 81.00
- Declination: -23.20
- RMS error for location: 3.60
Times
The start date: 14/01/93
The Start time: 05:15:39
The end date : 14/01/93
The end time : 05:19:59
The Burst trigger time (seconds of day) : 16014.7220000000
The Burst load time (seconds of day) : 16014.7517810000
IBDB background
Start time (day,seconds) 9001 5.44785522D+35
End time (day,seconds) 9001 3.51761630D+34
Trigger Specifics
Error in Trigger timescale flag
Triggered Detectors:
- Detector 6 exceeded threshold.
- Detector 7 exceeded threshold.
Burst Processing Comment:
GRB. Weak double peak. Dur.~12s. Max. at ~T+9s. Second peak visible above 300keV.
The OSSE view of this burst.
-
- Raw ascii
data from the OSSE team.
Other data
The full report contains detailed information, about
this burst. The fields in this report are explained
in this example. Specifics are explained in the BATSE Flight Software Users Manual,
currently available via US Mail from the Science Support Center.
Go to the archive to get other related data.
[an error occurred while processing this directive] [an error occurred while processing this directive]