This is BATSE trigger #2522

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 2522...

Location (J2000 degrees)

Times

 The start date: 09/10/93
 The Start time: 12:12:8

 The Burst trigger time (seconds of day) : 43928.217625
 The Burst load time (seconds of day)    : 43928.250000

IBDB background

Start time (day,seconds) 9240 38358.729109 End time (day,seconds) 9240 49592.005203

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Complex Dur ~110s. Lots of spikey substructure, Max. at ~T+76s. Visible ab ove 300kev.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.