This is BATSE trigger #3481

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 3481...

Location (J2000 degrees)

Times

 The start date: 03/25/95
 The Start time: 17:36:32

 The Burst trigger time (seconds of day) : 63391.921531
 The Burst load time (seconds of day)    : 63391.948953

IBDB background

Start time (day,seconds) 9801 59098.846609 End time (day,seconds) 9801 69097.181109

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Intense double pulse, each with substructure, total dur.~55 s. Max. at ~T+4 0 s. Strongly visible above 300 keV.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.