This is BATSE trigger #3569

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 3569...

Location (J2000 degrees)

Times

 The start date: 05/10/95
 The Start time: 7:47:60

 The Burst trigger time (seconds of day) : 28079.793531
 The Burst load time (seconds of day)    : 28079.824562

IBDB background

Start time (day,seconds) 9847 22445.790609 End time (day,seconds) 9847 33707.741109

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse with substructure. Total dur.~ 14 s. First pulse is much stron ger, dur.~4 s, max. at ~T+1 s. Second pulse dur.~3 s, max. at ~ T+12 s. Weak emission starts at ~T-7 s. First pulse is visible above 300 keV.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.