This is BATSE trigger #3916

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 3916...

Location (J2000 degrees)

Times

 The start date: 11/21/95
 The Start time: 6:11:21

 The Burst trigger time (seconds of day) : 22281.393609
 The Burst load time (seconds of day)    : 22281.420406

IBDB background

Start time (day,seconds) 10042 16782.047859 End time (day,seconds) 10042 27917.021187

Trigger Specifics

This burst triggered on the 256 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Complex, dur. ~75 s, max at ~T+8 s. Weakly visible above 300 keV.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.