This is BATSE trigger #3917

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 3917...

Location (J2000 degrees)

Times

 The start date: 11/23/95
 The Start time: 18:10:6

 The Burst trigger time (seconds of day) : 65405.617609
 The Burst load time (seconds of day)    : 65405.647875

IBDB background

Start time (day,seconds) 10044 59749.087906 End time (day,seconds) 10044 70925.023922

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse, total dur. ~160sec. First is stronger, dur. ~40sec., max at ~ T+5sec. Second has max at ~T+130sec., dur. ~50sec. First p eak visible above 300KeV.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.