This is BATSE trigger #3924

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 3924...

Location (J2000 degrees)

Times

 The start date: 11/27/95
 The Start time: 12:49:45

 The Burst trigger time (seconds of day) : 46185.137531
 The Burst load time (seconds of day)    : 46185.167859

IBDB background

Start time (day,seconds) 10048 38535.903922 End time (day,seconds) 10048 50014.944063

Trigger Specifics

This burst triggered on the 256 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse, triggered on second pulse. Total dur ~ 10s. First max at ~T-5s, dur. ~3s. Se cond has peak at trigger time, dur. ~3s. Not visible above 300 keV. contains detailed information about this burst.

Go to the data for this burst.