This is BATSE trigger #5206

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 5206...

Location (J2000 degrees)

Times

 The start date: 03/11/96
 The Start time: 18:44:59

 The Burst trigger time (seconds of day) : 67498.569594
 The Burst load time (seconds of day)    : 67498.595641

IBDB background

Start time (day,seconds) 10153 61965.048266 End time (day,seconds) 10153 73706.229609

Trigger Specifics

This burst triggered on the 64 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Single spike with substructure, dur.~0.4 s. Visible above 300 keV.

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.