This is BATSE trigger #5456

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 5456...

Location (J2000 degrees)

Times

 The start date: 05/08/96
 The Start time: 19:0:5

 The Burst trigger time (seconds of day) : 68405.449562
 The Burst load time (seconds of day)    : 68405.477063

IBDB background

Start time (day,seconds) 10211 62704.374563 End time (day,seconds) 10211 74132.215625

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse with substructure, dur.~5 s, max. at ~T+0.3 s. Marginally visi ble above 300 keV. contains detailed information about this burst.

Go to the data for this burst.