This is BATSE trigger #5545

Light Curves...

E > 25 keVView each of the 4 discriminator channels.

More about trigger 5545...

Location (J2000 degrees)

Times

 The start date: 07/20/96
 The Start time: 11:36:53

 The Burst trigger time (seconds of day) : 41812.937563
 The Burst load time (seconds of day)    : 41812.965031

IBDB background

Start time (day,seconds) 10284 36232.950734 End time (day,seconds) 10284 47558.389125

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse, rise faster than decay, total dur.~8 s. Visible above 300 keV .

Other data

The full report contains detailed information about this burst.

Go to the data for this burst.