This is BATSE trigger #5609

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 5609...

Location (J2000 degrees)

Times

 The start date: 09/21/96
 The Start time: 15:3:49

 The Burst trigger time (seconds of day) : 54228.809516
 The Burst load time (seconds of day)    : 54228.833125

IBDB background

Start time (day,seconds) 10347 48771.828703 End time (day,seconds) 10347 59966.197078

Trigger Specifics

This burst triggered on the 64 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Intense double pulse, each with substructure, total dur. ~40 s. First is st ronger, max at ~T+1.5 s, dur. ~15 s. Second has max at ~T+36 s, dur. ~12 s. First pulse is visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.