This is BATSE trigger #5631

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 5631...

Location (J2000 degrees)

Times

 The start date: 10/14/96
 The Start time: 0:8:28

 The Burst trigger time (seconds of day) :   507.593516
 The Burst load time (seconds of day)    :   507.624578

IBDB background

Start time (day,seconds) 10369 82926.326562 End time (day,seconds) 10370 6153.973406

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse with substructure, dur.~100 s, max. at ~T+2 s. Visible above 3 00 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.