This is BATSE trigger # 593
Light Curves...
View each of the 4 discriminator channels.
More about trigger 593...
Location (J2000 degrees)
- Right Ascension: 131.40
- Declination: 60.90
- RMS error for location: 2.21
Times
The start date: 30/07/91
The Start time: 14:11:52
The end date : 30/07/91
The end time : 14:15:52
The Burst trigger time (seconds of day) : 51108.9710000000
The Burst load time (seconds of day) : 51111.0403440000
IBDB background
Start time (day,seconds) 8467 4.02290710D+39
End time (day,seconds) 8467 1.56279612D+39
Trigger Specifics
This burst triggered on the 256 ms time scale
Triggered Detectors:
- Detector 1 exceeded threshold.
- Detector 3 exceeded threshold.
Burst Processing Comment:
GRB. Complex, very weak event. Preceded by a much weaker pulse at approx. T-60, which is seen up to approx. 300keV. Main event lasts approx. 155s. and is seen up to 300keV.
The OSSE view of this burst.
-
- Raw ascii
data from the OSSE team.
Other data
The full report contains detailed information, about
this burst. The fields in this report are explained
in this example. Specifics are explained in the BATSE Flight Software Users Manual,
currently available via US Mail from the Science Support Center.
Go to the archive to get other related data.
[an error occurred while processing this directive] [an error occurred while processing this directive]