This is BATSE trigger #6091

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6091...

Location (J2000 degrees)

Times

 The start date: 02/14/97
 The Start time: 16:1:30

 The Burst trigger time (seconds of day) : 57690.057469
 The Burst load time (seconds of day)    : 57690.085109

IBDB background

Start time (day,seconds) 10493 51987.190641 End time (day,seconds) 10493 63335.157063

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse dur.~1.4 s. Not visible above 300 keV. Possible weak successor at ~T+4.3 s, dur.~0.3 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.