This is BATSE trigger #6147
Light Curves...
View each of the 4 discriminator channels.
More about trigger 6147...
Location (J2000 degrees)
- Right Ascension: 347.743
- Declination: -19.115
- RMS error for location: 1.60445
Times
The start date: 03/30/97
The Start time: 8:58:52
The Burst trigger time (seconds of day) : 32332.489469
The Burst load time (seconds of day) : 32332.520453
IBDB background
Start time (day,seconds) 10537 26721.014656
End time (day,seconds) 10537 38044.405047
Trigger Specifics
Triggered Detectors:
- Detector 0 exceeded threshold.
- Detector 1 exceeded threshold.
Burst Processing Comment:
GRB. Single pulse with substructure, dur.~70 s. Not visible above 300 keV. Possi ble successor bump at ~T+90 s.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.