This is BATSE trigger #6226

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6226...

Location (J2000 degrees)

Times

 The start date: 05/09/97
 The Start time: 13:23:27

 The Burst trigger time (seconds of day) : 48206.537469
 The Burst load time (seconds of day)    : 48206.567766

IBDB background

Start time (day,seconds) 10577 42719.990562 End time (day,seconds) 10577 53945.077031

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse, dur.~100 s. First is weaker, dur.~20 s, starts at ~T-5 s, max . at ~T; second has dur.~40 s, starts at ~T+28 s, max. at ~T+39 s, substructure. Visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.