This is BATSE trigger #6240

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6240...

Location (J2000 degrees)

Times

 The start date: 05/23/97
 The Start time: 23:1:30

 The Burst trigger time (seconds of day) : 82890.441469
 The Burst load time (seconds of day)    : 82890.472344

IBDB background

Start time (day,seconds) 10591 79246.070453 End time (day,seconds) 10592 2045.685047

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse, with substructure, dur.~55 s, max. at ~T+2 s, possible precur sor at ~T-235 s and ~T-140 s. Visible above 300 keV. HV off du e to SAA starts between T+200 s and T+316 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.