This is BATSE trigger #6251
Light Curves...
View each of the 4 discriminator channels.
More about trigger 6251...
Location (J2000 degrees)
- Right Ascension: 177.047
- Declination: 62.308
- RMS error for location: 1.11666
Times
The start date: 06/03/97
The Start time: 23:35:0
The Burst trigger time (seconds of day) : 84900.297469
The Burst load time (seconds of day) : 84900.325031
IBDB background
Start time (day,seconds) 10602 79380.214188
End time (day,seconds) 10603 4025.077031
Trigger Specifics
Triggered Detectors:
- Detector 2 exceeded threshold.
- Detector 3 exceeded threshold.
Burst Processing Comment:
GRB. Multi-peaked, dur.~5 s, starts at ~T-2 s, max. at ~T+0.6 s. Possible weak s uccessor emission, extends to ~T+50 s. Visible above 300 keV.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.