This is BATSE trigger #6255

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6255...

Location (J2000 degrees)

Times

 The start date: 06/05/97
 The Start time: 8:8:25

 The Burst trigger time (seconds of day) : 29304.777469
 The Burst load time (seconds of day)    : 29304.804953

IBDB background

Start time (day,seconds) 10604 23811.830531 End time (day,seconds) 10604 34916.086422

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse with substructure, dur.~0.4 s. Not visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.