This is BATSE trigger #6325

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6325...

Location (J2000 degrees)

Times

 The start date: 08/03/97
 The Start time: 18:28:57

 The Burst trigger time (seconds of day) : 66536.865469
 The Burst load time (seconds of day)    : 66536.890094

IBDB background

Start time (day,seconds) 10663 60927.758641 End time (day,seconds) 10663 73043.725047

Trigger Specifics

This burst triggered on the 64 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Single spike, dur.~0.3 s. Visible above 300 keV. Overwrote preceeding trigg er # 6324 during SHERB; STTE belongs to #6324.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.