This is BATSE trigger #6330

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6330...

Location (J2000 degrees)

Times

 The start date: 08/09/97
 The Start time: 2:45:53

 The Burst trigger time (seconds of day) :  9952.993469
 The Burst load time (seconds of day)    :  9953.023797

IBDB background

Start time (day,seconds) 10669 4497.166609 End time (day,seconds) 10669 15556.366469

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse, dur. ~20 s. Not visible above 300 keV. Possible successor a t ~T+35 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.