This is BATSE trigger #6351

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6351...

Location (J2000 degrees)

Times

 The start date: 08/29/97
 The Start time: 9:29:39

 The Burst trigger time (seconds of day) : 34178.785453
 The Burst load time (seconds of day)    : 34178.815781

IBDB background

Start time (day,seconds) 10689 28563.214453 End time (day,seconds) 10689 39794.446469

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse with substructure, dur.~50 s, max. at ~T+18 s. Weakly visible above 300 keV. Data gap beginning at ~T+80 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.