This is BATSE trigger #6400

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6400...

Location (J2000 degrees)

Times

 The start date: 09/26/97
 The Start time: 22:56:19

 The Burst trigger time (seconds of day) : 82579.425453
 The Burst load time (seconds of day)    : 82579.452984

IBDB background

Start time (day,seconds) 10717 76259.085047 End time (day,seconds) 10718 1903.373016

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Multi-peaked, dur.~15 s. Visible above 300 keV. CygX-1 occultation set at ~ T+215 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.