This is BATSE trigger #6492

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6492...

Location (J2000 degrees)

Times

 The start date: 11/22/97
 The Start time: 21:29:12

 The Burst trigger time (seconds of day) : 77351.649469
 The Burst load time (seconds of day)    : 77351.680437

IBDB background

Start time (day,seconds) 10774 71873.292641 End time (day,seconds) 10774 84122.381062

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse, dur. ~60 s, max. at ~T+30 s. Both pulses have rise faster tha n fall. Visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.