This is BATSE trigger #6520
Light Curves...
View each of the 4 discriminator channels.
More about trigger 6520...
Location (J2000 degrees)
- Right Ascension: 117.836
- Declination: 4.128
- RMS error for location: 6.12794
Times
The start date: 12/06/97
The Start time: 12:51:17
The Burst trigger time (seconds of day) : 46277.345469
The Burst load time (seconds of day) : 46277.375687
IBDB background
Start time (day,seconds) 10788 40766.222563
End time (day,seconds) 10788 51813.134563
Trigger Specifics
This burst triggered on the 1024 ms time scale.
Triggered Detectors:
- Detector 3 exceeded threshold.
- Detector 7 exceeded threshold.
Burst Processing Comment:
GRB. Double pulse, dur.~80 s. First max. at ~T-48 s did not trigger. Not visible above 300 keV.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.