This is BATSE trigger #6560

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6560...

Location (J2000 degrees)

Times

 The start date: 01/05/98
 The Start time: 0:44:42

 The Burst trigger time (seconds of day) :  2681.825469
 The Burst load time (seconds of day)    :  2681.853047

IBDB background

Start time (day,seconds) 10817 83482.382422 End time (day,seconds) 10818 8225.549063

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Intense, complex, dur.~55 s, max. at ~T+26 s. Visible above 300 keV. Crab o ccultation rise at ~T+17 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.