This is BATSE trigger #6679
Light Curves...
View each of the 4 discriminator channels.
More about trigger 6679...
Location (J2000 degrees)
- Right Ascension: 0.000
- Declination: 11.803
- RMS error for location: 2.64254
Times
The start date: 04/04/98
The Start time: 18:54:50
The Burst trigger time (seconds of day) : 68090.209437
The Burst load time (seconds of day) : 68090.233172
IBDB background
Start time (day,seconds) 10907 62400.269016
End time (day,seconds) 10907 73635.597016
Trigger Specifics
This burst triggered on the 64 ms time scale.
Triggered Detectors:
- Detector 0 exceeded threshold.
- Detector 1 exceeded threshold.
- Detector 2 exceeded threshold.
- Detector 3 exceeded threshold.
Burst Processing Comment:
GRB. Triple spike, dur.~1.8 s, max. at ~T+0.23 s. Visible above 300 keV. Crab ri se at ~T-90 s.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.