This is BATSE trigger #6829

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6829...

Location (J2000 degrees)

Times

 The start date: 06/17/98
 The Start time: 2:51:52

 The Burst trigger time (seconds of day) : 10311.649422
 The Burst load time (seconds of day)    : 10311.676359

IBDB background

Start time (day,seconds) 10981 4822.798531 End time (day,seconds) 10981 15843.085000

Trigger Specifics

This burst triggered on the 256 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Multi-peaked, dur.>220 s, max. at ~T+2 s, starts at ~T-100 s. Marginally vi sible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.