This is BATSE trigger #6831

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6831...

Location (J2000 degrees)

Times

 The start date: 06/17/98
 The Start time: 12:43:39

 The Burst trigger time (seconds of day) : 45818.593422
 The Burst load time (seconds of day)    : 45818.623781

IBDB background

Start time (day,seconds) 10981 41008.913031 End time (day,seconds) 10981 51457.806609

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse, dur.~15 s, starts at ~T-5 s. Not visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.