This is BATSE trigger #6891

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 6891...

Location (J2000 degrees)

Times

 The start date: 07/03/98
 The Start time: 4:22:45

 The Burst trigger time (seconds of day) : 15765.217422
 The Burst load time (seconds of day)    : 15765.247781

IBDB background

Start time (day,seconds) 10997 10217.230516 End time (day,seconds) 10997 21323.532969

Trigger Specifics

This burst triggered on the 1024 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse with substructure, dur. ~500 s, starts at ~T-30 s, max. at ~T+ 12 s. Visible above 300 keV. Possible precursor at ~T-290 s.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.