This is BATSE trigger #7142
Light Curves...
View each of the 4 discriminator channels.
More about trigger 7142...
Location (J2000 degrees)
- Right Ascension: 275.243
- Declination: 44.048
- RMS error for location: 1.22137
Times
The start date: 10/05/98
The Start time: 18:0:27
The Burst trigger time (seconds of day) : 64826.529422
The Burst load time (seconds of day) : 64826.553313
IBDB background
Start time (day,seconds) 11091 59621.134484
End time (day,seconds) 11091 70563.597000
Trigger Specifics
This burst triggered on the 64 ms time scale.
Triggered Detectors:
- Detector 2 exceeded threshold.
- Detector 3 exceeded threshold.
- Detector 6 exceeded threshold.
- Detector 7 exceeded threshold.
Burst Processing Comment:
GRB. Single pulse with spikey substructure, dur.~1.1 s. Visible above 300 keV. C ygX-1 rise at ~T-130 s. Crab set at ~T-160 s.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.