This is BATSE trigger #7170

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 7170...

Location (J2000 degrees)

Times

 The start date: 10/21/98
 The Start time: 23:8:12

 The Burst trigger time (seconds of day) : 83292.321422
 The Burst load time (seconds of day)    : 83292.344984

IBDB background

Start time (day,seconds) 11107 77745.934531 End time (day,seconds) 11108 2667.277000

Trigger Specifics

This burst triggered on the 64 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse with substructure, dur.~100 s, max. at ~T+4 s. Visible above 3 00 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.