This is BATSE trigger #7228

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 7228...

Location (J2000 degrees)

Times

 The start date: 11/25/98
 The Start time: 8:26:26

 The Burst trigger time (seconds of day) : 30385.889422
 The Burst load time (seconds of day)    : 30385.920391

IBDB background

Start time (day,seconds) 11142 24683.278641 End time (day,seconds) 11142 35971.856187

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse, dur.~95 s, max. at ~T+3.5 s. Possible successor at ~T+100 s. Weakly visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.