This is BATSE trigger #7250
Light Curves...
View each of the 4 discriminator channels.
More about trigger 7250...
Location (J2000 degrees)
- Right Ascension: 90.985
- Declination: 43.735
- RMS error for location: 0.85894
Times
The start date: 12/05/98
The Start time: 5:41:24
The Burst trigger time (seconds of day) : 20484.321422
The Burst load time (seconds of day) : 20484.348344
IBDB background
Start time (day,seconds) 11152 16552.718531
End time (day,seconds) 11152 26718.990625
Trigger Specifics
This burst triggered on the 256 ms time scale.
Triggered Detectors:
- Detector 5 exceeded threshold.
- Detector 7 exceeded threshold.
Burst Processing Comment:
GRB. Double pulse with substructure, dur.~130 s, max. at ~T+7 s, starts at ~T-80 s. Weakly visible above 300 keV. CygX-1 set at ~T+25 s.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.