This is BATSE trigger #7518

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 7518...

Location (J2000 degrees)

Times

 The start date: 04/13/99
 The Start time: 7:54:8

 The Burst trigger time (seconds of day) : 28448.121422
 The Burst load time (seconds of day)    : 28448.144984

IBDB background

Start time (day,seconds) 11281 25453.350609 End time (day,seconds) 11281 34140.965000

Trigger Specifics

This burst triggered on the 64 ms time scale.

Triggered Detectors:

Burst Processing Comment:

GRB. Double pulse with substructure, dur. ~15 s, max at ~T+3 s. HV off due to S AA at ~T+43 s. Visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.