This is BATSE trigger #7599

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 7599...

Location (J2000 degrees)

Times

 The start date: 06/05/99
 The Start time: 0:30:30

 The Burst trigger time (seconds of day) :  1830.393422
 The Burst load time (seconds of day)    :  1830.423453

IBDB background

Start time (day,seconds) 11333 82547.494438 End time (day,seconds) 11334 7434.021000

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Double spike with substructure, dur.~1.75 s, starts at ~T-1.1 s, max. at ~T +0.1 s. Visible above 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.