This is BATSE trigger #7872

Light Curves...

E > 25 keV
View each of the 4 discriminator channels.

More about trigger 7872...

Location (J2000 degrees)

Times

 The start date: 11/22/99
 The Start time: 7:21:31

 The Burst trigger time (seconds of day) : 26490.617422
 The Burst load time (seconds of day)    : 26490.648438

IBDB background

Start time (day,seconds) 11504 20872.998484 End time (day,seconds) 11504 32309.029000

Trigger Specifics

Triggered Detectors:

Burst Processing Comment:

GRB. Single pulse with substructure, dur.~45 s, starts at ~T-12 s. Not visible a bove 300 keV.

Other data

The full report contains detailed information, about this burst.

Go to the data for this burst.