This is BATSE trigger #8111
Light Curves...
View each of the 4 discriminator channels.
More about trigger 8111...
Location (J2000 degrees)
- Right Ascension: 346.030
- Declination: 3.333
- RMS error for location: 1.03329
Times
The start date: 05/19/A0
The Start time: 8:18:8
The Burst trigger time (seconds of day) : 29887.737422
The Burst load time (seconds of day) : 29887.764375
IBDB background
Start time (day,seconds) 11683 24402.726609
End time (day,seconds) 11683 35689.253000
Trigger Specifics
This burst triggered on the 256 ms time scale.
Triggered Detectors:
- Detector 0 exceeded threshold.
- Detector 1 exceeded threshold.
Burst Processing Comment:
GRB. Double pulse, second is stronger with max at ~T+5 s, total dur. ~25 s. Vis ible above 300 keV.
Other data
The full report
contains detailed information, about this burst.
Go to the
data for this burst.