ROSAT Guest Observer Facility

What is the status of the calibration of the PSPC?

(2/15/94)


The PSPC is undergoing a major energy recalibration to account for the non-linear time-dependant channel shifts that are evident (but not calibrated) in the data. The engineering model PSPC has just (2/15/94) entered the PANTER ground calibration facility, so that calibration data can be taken at the gain state at which the in-flight detector is currently operating. This posting will be updated as soon as possible.


button Select another question related to this topic

Select another FAQ topic Select another FAQ topic Return to the ROSAT GOF Return to the ROSAT GOF



Please use the Feedback link if you have questions on ROSAT.

This file was last modified on Friday, 27-Jul-2001 14:57:43 EDT

NASA Astrophysics

  • FAQ/Comments/Feedback
  • Education Resources
  • Download Adobe Acrobat
  • A service of the Astrophysics Science Division (ASD) at NASA/ GSFC

    ROSAT Project Scientist: Dr. Robert Petre

    Responsible NASA Official: Dr. Andy Ptak

    Privacy Policy and Important Notices.