XMM-Newton proposals must be prepared using RPS provided by ESA. This tool checks for the formal correctness of the proposal's entries. It produces formatted text output in electronic form. Proposals in any other format will not be accepted.
For technical details and advice, please see on-line instructions:
http://xmmrps.esac.esa.int/
For each observation contained in the proposal, the total observation
duration which includes the overheads of the instruments
is considered by OTAC.
In order to calculate this time, proposers have to enter the
requested science exposure time of the scientific prime instrument
and the prime instrument mode in the RPS.
Submission of a proposal is only complete if:
In view of possible network congestion close to the deadline,
proposers are urged to submit their proposals well in advance of the due date.
Proposers will receive an e-mail acknowledgment confirming the receipt
of their proposal(s) and providing the proposal number
assigned after successful submission.