2023-10-10 |
2023-283 |
16:07:00 |
ISS MLM-Nauka Russian Module coolant leak from the radiator almost completely stopped. Only residual coolant flaking off from external bubble occasionally.\nRestarted the science plan at 23-283-16:07. |
2023-10-09 |
2023-282 |
18:10:00 |
Updating the safe position for the ongoing MLM coolant leak. Commanded NICER to AZ=45, EL=100 at 23-282-18:10:00. |
2023-10-09 |
2023-282 |
17:34:16 |
Due to MLM coolant leak, Stopped the science plan at 23-282-17:34:16 and commanded NICER to AZ=180, EL=90. |
2023-10-09 |
2023-282 |
16:58:00 |
ISS MLM-Nauka Russian Module started leaking coolant from a radiator at ~ 282-16:58z. NICER team received email at 17:26z informing us of the leak. OC on voice loop said she thought the leak was coming from the AFT side and was moving forward. |
2023-10-09 |
2023-282 |
14:42:00 |
Thruster Disable for MT Translate WS7 WS6 (H23_282_B_04.UAF) |
2023-10-09 |
2023-282 |
09:20:00 |
Thruster Disable for 85P Clamp Install (H23_282_A_07.UAF) |
2023-10-08 |
2023-281 |
22:07:28 |
Star tracker imaging stuck at 23-281-11:10:39.318. Reset at 23-281-22:07:28. |
2023-10-08 |
2023-281 |
21:22:49 |
GEONS Diverged 23-281-11:49:59. Reset performed at 23-281-21:22:49. |
2023-10-06 |
2023-279 |
14:30:00 |
Thruster Disable for SPDM Ops (M23_279_A_08.UAF) |
2023-10-06 |
2023-279 |
13:48:10 |
NICER GEONS Diverged since at least 23-279-10:45:19. Reloaded EOPS and reset GEONS |
2023-10-03 |
2023-276 |
13:45:00 |
Thruster Disable for SPDM Ops (M23_276_A_06.UAF) |
2023-10-03 |
2023-276 |
12:51:03 |
NICER GEONS Diverged since at least 23-276-06:24:10. Reloaded EOPS and reset GEONS |
2023-10-02 |
2023-275 |
17:50:00 |
Thruster Disable for SPDM Ops (M23_275_A_05.UAF) |
2023-10-02 |
2023-275 |
15:24:02 |
Uploaded RTS 11 (version 05) to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-09-29 |
2023-272 |
10:56:00 |
85P Reboost (H23_272_A_07.UAF) |
2023-09-28 |
2023-271 |
12:45:00 |
Thruster Disable for MT Translate SPDM Ops (M23_271_A_03.UAF) |
2023-09-28 |
2023-271 |
02:40:31 |
Deployed NICER post ROBO/MISSE operations - Day #3. NICER science plan resumed at 23-271-02:40:31. |
2023-09-27 |
2023-270 |
13:47:00 |
Thruster Disable for SPDM Ops (M23_270_B_06.UAF) |
2023-09-27 |
2023-270 |
12:51:12 |
Stowed NICER for ROBO/MISSE operations - Day #3. NICER science plan stopped at 23-270-12:51:12. |
2023-09-27 |
2023-270 |
07:15:00 |
69S Undocking from RSNode US Control (M23_270_A_10.UAF) |
2023-09-27 |
2023-270 |
03:48:22 |
Deployed NICER post ROBO/MISSE operations - Day #2. NICER science plan resumed at 23-270-03:48:22. |
2023-09-26 |
2023-269 |
13:45:00 |
Thruster Disable for SPDM Ops (M23_269_A_05.UAF) |
2023-09-26 |
2023-269 |
12:34:18 |
Stowed NICER for ROBO/MISSE operations - Day #2. NICER science plan stopped at 23-269-12:34:18. |
2023-09-26 |
2023-269 |
09:17:45 |
Deployed NICER post ROBO/MISSE operations - Day #1. NICER science plan resumed at 23-269-09:17:45. |
2023-09-25 |
2023-268 |
14:27:00 |
Thruster Disable for SPDM Ops (M23_268_A_03.UAF) |
2023-09-25 |
2023-268 |
12:13:11 |
Stowed NICER for ROBO/MISSE operations - Day #1. NICER science plan stopped at 23-268-12:13:11. |
2023-09-23 |
2023-266 |
16:12:03 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 6-2, 7-7 |
2023-09-22 |
2023-265 |
13:55:00 |
Thruster Disable for MT Translate and SPDM Ops (M23_265_B_05.UAF) |
2023-09-22 |
2023-265 |
11:17:00 |
69S Thruster Test on MM (M23_265_A_03.UAF) |
2023-09-21 |
2023-264 |
18:45:00 |
Thruster Disable for MT Translate (M23_264_A_03.UAF) |
2023-09-19 |
2023-262 |
13:03:12 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7 |
2023-09-18 |
2023-261 |
13:37:00 |
Thruster Disable for MT Translate (M23_261_A_03.UAF) |
2023-09-18 |
2023-261 |
09:13:08 |
NICER GEONS Diverged since at least 23-261-08:35:05. Reloaded EOPS and reset GEONS |
2023-09-17 |
2023-260 |
11:17:00 |
Thruster Disable for SPDM Operations (M23_260_A_03.UAF) |
2023-09-16 |
2023-259 |
06:29:00 |
RS OPM to pXVV Profile 11 (H23_259_A_03.UAF) |
2023-09-15 |
2023-258 |
17:49:00 |
70S Docking MRM1 2 orbit (H23_258_A_07.UAF) |
2023-09-15 |
2023-258 |
05:39:00 |
RS OPM to nXVV Profile 3 (H23_258_B_03.UAF) |
2023-09-13 |
2023-256 |
13:20:05 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7 |
2023-09-12 |
2023-255 |
16:30:00 |
Thruster Disable for MT Translate WS6 to WS5 (M23_255_A_03.UAF) |
2023-09-08 |
2023-251 |
18:02:00 |
85P Reboost (H23_251_A_08.UAF) |
2023-09-08 |
2023-251 |
10:25:00 |
Thruster Disable for 85P hatch close (H23_251_B_09.UAF) |
2023-09-05 |
2023-248 |
13:30:00 |
Thruster Disable for MT Translate WS4 to WS6 (M23_248_A_03.UAF) |
2023-09-03 |
2023-246 |
10:40:00 |
Crew Dragon Undocking (Crew-6 from N2F) (M23_246_A_03.UAF) |
2023-09-03 |
2023-246 |
10:35:57 |
Crew-6 Undock from N2F at 11:05z. NICER looked starboard from 2023-246-10:35:57 to 23-246-11:31:35. |
2023-09-01 |
2023-244 |
17:15:00 |
Modified running ATS to include look starboard away from Crew-6 Dragon Thruster Test. Science plan was interrupted from 2023-244-17:15:00 to 2023-244-17:56:40. |
2023-08-31 |
2023-243 |
01:15:00 |
Thruster Disable for JEMRMS Ops (M23_243_A_05.UAF) |
2023-08-30 |
2023-242 |
19:02:57 |
Fixed the NICER load building process to remove detector enable alls that were happening in day/night transitions accidentally during the RTS11 bright targets. |
2023-08-30 |
2023-242 |
16:13:36 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-08-29 |
2023-241 |
13:05:00 |
Thruster Disable for MT Translate WS6 WS4 (M23_241_B_05.UAF) |
2023-08-29 |
2023-241 |
22:05:00 |
Thruster Disable for JEMRMS Ops (M23_241_A_07.UAF) |
2023-08-28 |
2023-240 |
13:51:53 |
Updated EOPs and Reset GEONS Clock Bias |
2023-08-28 |
2023-240 |
13:00:00 |
Thruster Disable for NanoRacks GAMBIT Sortie (M23_240_A_03.UAF) |
2023-08-28 |
2023-240 |
00:47:00 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4 |
2023-08-28 |
2023-240 |
19:49:55 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-08-27 |
2023-239 |
15:58:00 |
Thruster Disable for MT Translate WS2 WS6 (M23_239_A_07.UAF) |
2023-08-27 |
2023-239 |
12:05:40 |
Commanded NICER to look starboard from 2023-239-12:05:40 to 2023-239-12:59:01 for Dragon Docking (Crew-7 to N2Z) |
2023-08-27 |
2023-239 |
11:34:00 |
Dragon Docking (Crew-7 to N2Z) (M23_239_B_02.UAF) |
2023-08-25 |
2023-237 |
23:25:46 |
Uploaded to NICER RTS 10,11 disable and enable detectors for ID 5394 in the following config\n1-2, 1-3, 2-1, 2-5, 2-6, 3-8, 4-3, 4-4, 5-4, 5-7, 5-8, 6-5, 6-7, 6-8 |
2023-08-25 |
2023-237 |
05:15:00 |
85P Hatch Open And Clamp Install (H23_237_B_05.UAF) |
2023-08-25 |
2023-237 |
01:49:00 |
85P Docking to SM Aft (H23_237_A_11.UAF) |
2023-08-24 |
2023-236 |
16:27:00 |
RS OPM to pXVV (M23_236_B_04.UAF) |
2023-08-24 |
2023-236 |
13:56:00 |
PDAM - SM ME - MLM Roll (M23_236_A_02.UAF) |
2023-08-24 |
2023-236 |
08:41:22 |
NICER Safe at 23-236-08:41:22z due to AP=49 trip (GPS Data Invalid - GPS jamming). NICER back collecting science at 23-236-09:10:37z. |
2023-08-23 |
2023-235 |
22:35:00 |
Thruster Disable for JEMRMS Ops (M23_235_B_05.UAF) |
2023-08-22 |
2023-234 |
23:25:00 |
Thruster Disable for MT Translate WS5 WS2 and JEMRMS Ops (M23_234_B_05.UAF) |
2023-08-20 |
2023-232 |
23:18:00 |
83P Undocking from SM Aft (M23_232_A_09.UAF) |
2023-08-18 |
2023-230 |
06:05:00 |
Aft Progress 83P Fuel Purge (M23_230_C_03.UAF) |
2023-08-18 |
2023-230 |
00:50:00 |
Thruster Disable JEMRMS Ops (M23_230_B_08.UAF) |
2023-08-17 |
2023-229 |
15:30:00 |
Thruster Disable for SPDM Checkouts (M23_229_C_03.UAF) |
2023-08-17 |
2023-229 |
05:10:00 |
Aft Progress 83P Prop Purge (M23_229_B_05.UAF) |
2023-08-15 |
2023-227 |
07:50:00 |
Thruster Disable for 84P Hatch Open (H23_227_A_03.UAF) |
2023-08-12 |
2023-224 |
05:24:00 |
US OPM to pXVV with Timeliner Profile 13 (M23_224_A_05.UAF) |
2023-08-11 |
2023-223 |
13:20:00 |
Cygnus19 Reboost (M23_223_A_07.UAF) |
2023-08-10 |
2023-222 |
23:57:00 |
US OPM to nXVV with Timeliner Profile 5 (M23_222_A_07.UAF) |
2023-08-10 |
2023-222 |
12:30:00 |
Thruster Disable ERA Ops (M23_222_B_05.UAF) |
2023-08-10 |
2023-222 |
05:23:12 |
Performed GEONS reset after GPS reporting non-convergence |
2023-08-09 |
2023-221 |
09:15:00 |
ERA Ops Before Depress (M23_221_B_08.UAF) |
2023-08-09 |
2023-221 |
16:23:00 |
RS EVA 60 ERA Ops Thruster Disable (H23_221_C_07.UAF) |
2023-08-09 |
2023-221 |
13:08:00 |
RS EVA 60 US Control (M23_221_A_08.UAF) |
2023-08-08 |
2023-220 |
10:45:00 |
Thruster Disable ERA Ops (H23_220_A_09.UAF) |
2023-08-06 |
2023-218 |
00:55:00 |
PDAM - Aft Progress - MLM Roll (M23_217_B_06.UAF) |
2023-08-05 |
2023-217 |
14:31:00 |
Thruster Disable for MT Translate WS2 to WS5 (M23_217_A_02.UAF) |
2023-08-04 |
2023-216 |
11:54:00 |
Cygnus19 Install (M23_216_A_03.UAF) |
2023-08-04 |
2023-216 |
07:50:00 |
Cygnus19 Capture (M23_215_A_03.UAF) |
2023-08-03 |
2023-215 |
15:56:42 |
NICER entered SAFE mode at 23-215-15:56:42 due to GPS signal jamming. AP 49 tripped after ten minutes of invalid GPS data. Safe occurred during long TDRSS outage. NICER was recovered as soon as TDRSS was available. Science plan was resumed at 23-215-16:47:27. |
2023-08-02 |
2023-214 |
11:05:00 |
Thruster Disable for 84P Hatch Close (H23_214_A_03.UAF) |
2023-08-01 |
2023-213 |
08:19:13 |
Power issues on ISS made POIC turn off our survival heaters at 23-213-08:19:13z. They were turned back on at 23-213-11:21ishz |
2023-07-31 |
2023-212 |
15:46:31 |
Pointed NICER at the MRM-2 FWD/STBD Window for Photo Survey. Science plan interrupted from 23-212-15:46:31 - 2023-212-16:32:19. |
2023-07-28 |
2023-209 |
11:55:00 |
Thruster Disable for 83P Hatch Closing and MT Translate (M23_209_A_05.UAF) |
2023-07-27 |
2023-208 |
11:27:00 |
83P Reboost (H23_208_A_08.UAF) |
2023-07-25 |
2023-206 |
20:16:00 |
Tried looking at the MRM-2 window twice and taking photos to see if we are pointed at the window.\nScience plan interrupted from 23-206-20:16:07 to 23-206-20:38:41. – Nothing seen on ST images\nScience plan interrupted from 23-207-00:44:05 to 23-207-01:13:47. – ST images a success. |
2023-07-25 |
2023-206 |
15:55:00 |
Star tracker Imaging was stuck. Reset the star tracker. Images not taken from 23-206-12:27:35.056 – 23-206-15:55:09. |
2023-07-24 |
2023-205 |
15:40:00 |
There was an APS-1 Outage on the ISS from about 205/15:40 – 17:40. This caused NICER data not to be routed and also not to be recorded on the ISS. |
2023-07-20 |
2023-201 |
13:20:00 |
Thruster Disable MT Translate WS4 to WS5 (M23_201_B_03.UAF) |
2023-07-20 |
2023-201 |
01:51:00 |
Thruster Disable JEMRMS Ops (M23_201_A_05.UAF) |
2023-07-20 |
2023-201 |
17:09:53 |
Updated EOPs and Reset GEONS Clock Bias |
2023-07-19 |
2023-200 |
01:48:00 |
Thruster Disable JEMRMS Ops (M23_200_A_03.UAF) |
2023-07-17 |
2023-198 |
13:28:00 |
83P Hatch Opening (H23_198_A_07.UAF) |
2023-07-15 |
2023-196 |
12:10:00 |
CMG Maneuver to Stage TEA Mom Ramp First Use (M23_196_A_03.UAF) |
2023-07-09 |
2023-190 |
19:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude Mom Ramp First Use (M23_190_A_03.UAF) |
2023-07-07 |
2023-188 |
01:09:00 |
Thruster Disable for JEMRMS Ops (M23_188_A_07.UAF) |
2023-07-06 |
2023-187 |
13:16:15 |
Reset the star tracker. Imaging was stuck from 23-186-22:03:51 - 23-187-13:16:15. |
2023-07-06 |
2023-187 |
03:26:00 |
Thruster Disable for JEMRMS Ops (M23_187_A_07.UAF) |
2023-07-04 |
2023-185 |
20:15:00 |
83P Reboost (H23_185_A_14.UAF) |
2023-07-03 |
2023-184 |
11:40:00 |
Thruster Disable for SpX-28 IPA FSE Unstow (M23_184_A_07.UAF) |
2023-07-03 |
2023-184 |
18:30:00 |
Thruster Disable for SpX-28 IPA FSE Jettison (M23_184_B_03.UAF) |
2023-06-30 |
2023-181 |
13:40:00 |
Thruster Disable for MT Translate WS2 WS4 (M23_181_A_05.UAF) |
2023-06-29 |
2023-180 |
16:20:00 |
Updated the ATS to look AZ = -45deg, El=88 deg during the SpX-28 Undock to avoid debris/contam.\nScience plan interrupted from 2023-180-16:20:00 to 23-180-16:44:00 |
2023-06-29 |
2023-180 |
15:30:00 |
Cargo Dragon Undocking (SpX-28 from N2Z) (M23_180_A_03.UAF) |
2023-06-27 |
2023-178 |
16:43:41 |
SpX-28 is performing a hot-fire thruster test from 16:55 – 17:55z today. Updated the ATS to look AZ = -45deg, El=88 deg during the 2023-178-16:43:41z to 2023-178-18:04:20z, to avoid the plume. Test ended early so manually commanded back to nominal science. Science plan interrupted from 23-178-16:43:40 to 23-178-17:42:58. |
2023-06-26 |
2023-177 |
23:30:00 |
Thruster Disable for MT Translate WS4 to WS2 (M23_177_B_05.UAF) |
2023-06-26 |
2023-177 |
08:10:00 |
Thruster Disable for 84P Clamp Install (M23_177_A_10.UAF) |
2023-06-23 |
2023-174 |
16:50:00 |
Thruster Disable for MT Translate WS1 to WS4 (M23_174_A_03.UAF) |
2023-06-22 |
2023-173 |
12:45:00 |
RS EVA 59 on US Control (M23_173_B_05.UAF) |
2023-06-16 |
2023-167 |
15:10:00 |
84P Clamp Uninstall (M23_167_B_07.UAF) |
2023-06-16 |
2023-167 |
05:22:00 |
83P Reboost (H23_167_A_10.UAF) |
2023-06-15 |
2023-166 |
09:57:00 |
IROSA 1B Install EVA (M23_166_A_05.UAF) |
2023-06-13 |
2023-164 |
19:49:08 |
Pointed NICER in the direction of ISS EHDC1 and EHDC7 cameras and CRONUS took video and stills.\nScience plan interrupted from 23-164-19:49:08z to 23-164-21:00:12z. |
2023-06-12 |
2023-163 |
20:59:44 |
Updated EOPs and Reset GEONS Clock Bias |
2023-06-09 |
2023-160 |
09:07:00 |
IROSA 1A Install EVA (M23_160_A_07.UAF) |
2023-06-09 |
2023-160 |
20:40:19 |
Maneuvered NICER to look at ISS camera for High Def video survey. Science Plan interrupted from 23-160-20:40:19 to 23-160-22:29:45. |
2023-06-08 |
2023-159 |
13:30:00 |
Thruster Disable for MT Translate from WS4 to WS1 (M23_159_A_03.UAF) |
2023-06-07 |
2023-158 |
13:20:00 |
Thruster Disable for MT Translate WS2 to WS4 and IROSA Removal and Install (M23_158_B_03.UAF) |
2023-06-06 |
2023-157 |
19:36:31 |
Loaded NICER FSW RTSs 224 - 227 (version 4) which adjust the nominal MPU threshold settings by +35 from nominal. Ran them at 19:36:31 |
2023-06-06 |
2023-157 |
09:50:00 |
Cargo Dragon Docking (SpX-28 to N2Z) (M23_157_B_03.UAF) |
2023-06-06 |
2023-157 |
09:14:53 |
Added commands to load to look port side during SpX-28 157-09:50:00 dock. Science plan interrupted from 23-157-09:14:53 to 23-157-10:10:00. |
2023-06-02 |
2023-153 |
14:55:54 |
Loaded NICER FSW RTSs 224 - 227 (version 3) which adjust the nominal MPU threshold settings by +30 from nominal. Ran them at 14:55:54 |
2023-06-02 |
2023-153 |
00:10:00 |
Thruster Disable for JEMRMS Ops (M23_153_A_05.UAF) |
2023-06-01 |
2023-152 |
20:34:48 |
Modified the NICER ATS load builder to use the day crossing to call RTS 224-227 to set MPU threshold settings to nominal + 50 and to call RTS 220-223 at night crossing to set thresholds back to nominal values. |
2023-06-01 |
2023-152 |
15:40:37 |
Started NICER FSW RTSs 224-227 which adjust the nominal MPU threshold settings by 50. |
2023-06-01 |
2023-152 |
14:51:03 |
Tested NICER FSW RTSs 220-223 which command the MPU thresholds back to nominal settings. |
2023-06-01 |
2023-152 |
14:00:55 |
Loaded NICER FSW RTSs 224 - 227 (version 2) which adjust the nominal MPU threshold settings by 50. Ran them at 14:06:56. |
2023-06-01 |
2023-152 |
09:05:00 |
Thruster Disable for ERA Ops (M23_152_A_07.UAF) |
2023-06-01 |
2023-152 |
00:29:47 |
Adjusted MPU detector threshold settings by 50 counts from nominal. |
2023-05-31 |
2023-151 |
22:10:45 |
Adjusted MPU detector threshold settings by 140 counts from nominal. |
2023-05-31 |
2023-151 |
21:19:23 |
Adjusted MPU detector threshold settings by 230 counts from nominal. |
2023-05-31 |
2023-151 |
22:13:00 |
Thruster Disable for MT Translate WS4 to WS2 (M23_151_A_02.UAF) |
2023-05-31 |
2023-151 |
23:19:10 |
Adjusted MPU detector threshold settings by 100 counts from nominal. |
2023-05-30 |
2023-150 |
22:32:00 |
Modified the ATS load builder to re-enable the detectors after transitioning from day to night if target spanned across the boundary. |
2023-05-30 |
2023-150 |
20:47:00 |
Thruster Disable for JEMRMS Ops (M23_150_B_03.UAF) |
2023-05-30 |
2023-150 |
18:57:32 |
Pointed NICER head at an external ISS camera that had been looking at MISSE. Science plan interrupted until 19:12:47 |
2023-05-30 |
2023-150 |
15:03:19 |
Pointed NICER head away from AX-2 undocking. Science plan interrupted until 15:15:56 |
2023-05-30 |
2023-150 |
14:27:00 |
Crew Dragon Undocking (Ax-2 from N2Z) (M23_150_A_03.UAF) |
2023-05-29 |
2023-149 |
09:55:00 |
Thruster Disable for 83P Hatch Close (M23_149_A_05.UAF) |
2023-05-27 |
2023-147 |
22:32:00 |
Thruster Disable for MT Translate WS7 to WS4 and SPDM (M23_147_C_03.UAF) |
2023-05-27 |
2023-147 |
13:35:00 |
Thruster Disable for SPDM Ops (M23_147_A_05.UAF) |
2023-05-27 |
2023-147 |
01:35:00 |
Thruster Disable for MT Translate WS4 to WS7 and SPDM (M23_147_B_03.UAF) |
2023-05-25 |
2023-145 |
03:39:00 |
RS OPM to pXVV (M23_145_A_12.UAF) |
2023-05-25 |
2023-145 |
15:45:00 |
ROBO Ops: I69 SPDM Stow and reconfigure for TPS Survey\nOps: Xlate from WS 2 to WS4\nIN NICER FOV possibly until 22:15 |
2023-05-25 |
2023-145 |
16:00:00 |
Thruster Disable for MT Translate and SPDM Ops (M23_145_B_05.UAF) |
2023-05-24 |
2023-144 |
17:55:00 |
Thruster Disable for 84P Hatch Opening (H23_144_C_03.UAF) |
2023-05-24 |
2023-144 |
15:50:00 |
84P Docking Reduced RS Master Timeline (H23_144_A_11.UAF) |
2023-05-24 |
2023-144 |
03:08:00 |
RS OPM to nXVV (H23_144_B_07.UAF) |
2023-05-22 |
2023-142 |
13:45:00 |
Start of NICER light leak |
2023-05-22 |
2023-142 |
12:00:00 |
Dragon Docking (Ax-2 to N2Z) (M23_142_A_08.UAF) |
2023-05-18 |
2023-138 |
15:53:00 |
83P Reboost (H23_138_A_10.UAF) |
2023-05-17 |
2023-137 |
01:50:00 |
Thruster Disable for JEMRMS Ops (M23_137_A_08.UAF) |
2023-05-16 |
2023-136 |
00:25:00 |
Thruster Disable for JEMRMS Ops (M23_136_A_05.UAF) |
2023-05-15 |
2023-135 |
17:05:00 |
83P Hatch Open and Clamp Install (M23_135_A_05.UAF) |
2023-05-15 |
2023-135 |
13:20:00 |
CMG Maneuver to Stage TEA (M23_135_B_03.UAF) |
2023-05-12 |
2023-132 |
14:20:00 |
RS EVA 58 (M23_132_B_05.UAF) |
2023-05-12 |
2023-132 |
12:51:11 |
Updated EOP and reset GEONS clock bias |
2023-05-11 |
2023-131 |
22:10:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M23_131_A_03.UAF) |
2023-05-06 |
2023-126 |
10:35:00 |
Dragon Port Relocate (Crew-6 from N2Z to N2F) (M23_126_A_05.UAF) |
2023-05-04 |
2023-124 |
17:10:00 |
Thruster Disable for ERA Mission after EVA 57 (H23_124_A_03.UAF) |
2023-05-03 |
2023-123 |
20:38:00 |
Thruster Disable for RS EVA 57 ERA Ops (H23_123_C_05.UAF) |
2023-05-03 |
2023-123 |
18:30:00 |
RS EVA 57 (H23_123_B_03.UAF) |
2023-05-02 |
2023-122 |
08:15:00 |
Thruster Disable for ERA Ops (H23_122_A_03.UAF) |
2023-05-01 |
2023-121 |
14:15:00 |
Thruster Disable for MT Translate WS4 to WS2 (M23_121_A_03.UAF) |
2023-04-30 |
2023-120 |
13:20:00 |
MT Translate WS5 to WS4 and SPDM Ops (M23_120_B_05.UAF) |
2023-04-29 |
2023-119 |
23:26:00 |
83P Reboost (H23_120_A_06.UAF) |
2023-04-28 |
2023-118 |
22:00:00 |
Thruster Disable for MT Translate WS4 to WS5 (M23_118_B_05.UAF) |
2023-04-28 |
2023-118 |
10:30:00 |
US EVA 86 (RFG Retrieve) (M23_118_A_07.UAF) |
2023-04-27 |
2023-117 |
09:50:00 |
Thruster Disable for ERA Ops (M23_117_A_07.UAF) |
2023-04-25 |
2023-115 |
12:20:00 |
Thruster Disable for MT Translate WS5 to WS4 (M23_115_B_07.UAF) |
2023-04-25 |
2023-115 |
01:10:00 |
Thruster Disable for JEMRMS Ops (M23_115_A_03.UAF) |
2023-04-24 |
2023-114 |
14:52:00 |
Thruster Disable for 83P Hatch Close SPDM and MT Translate WS4 to WS5 (M23_114_B_07.UAF) |
2023-04-23 |
2023-113 |
11:10:00 |
Ops: ELC-3 SASA Unstow until 114 03:25 |
2023-04-23 |
2023-113 |
11:00:00 |
Thruster Disable JEMRMS SPDM and MT Translate WS7 to WS4 (M23_113_A_12.UAF) |
2023-04-21 |
2023-111 |
18:10:00 |
Thruster Disable MT Translate WS5 to WS7 (M23_111_B_05.UAF) |
2023-04-21 |
2023-111 |
08:50:00 |
Cygnus18 Release (M23_111_A_05.UAF) |
2023-04-21 |
2023-111 |
07:15:00 |
Cygnus18 Unberth (M23_110_A_05.UAF) |
2023-04-20 |
2023-110 |
14:00:00 |
Thruster Disable ERA and 83P Hatch Opening (H23_110_B_05.UAF) |
2023-04-19 |
2023-109 |
02:20:00 |
Thruster Disable for ERA Ops (H23_109_A_03.UAF) |
2023-04-18 |
2023-108 |
23:55:00 |
RS EVA 56 Depress US Control (M23_108_A_03.UAF) |
2023-04-18 |
2023-108 |
20:25:00 |
Thruster Disable for ERA Ops (H23_108_B_03.UAF) |
2023-04-15 |
2023-105 |
14:27:00 |
Cargo Dragon Undocking (SpX-27 from N2F) (M23_105_A_03.UAF) |
2023-04-13 |
2023-103 |
15:52:00 |
SpX-27 Dedicated Thruster Firing Test (M23_103_A_08.UAF) |
2023-04-10 |
2023-100 |
00:15:28 |
Updated EOP and reset GEONS clock bias |
2023-04-07 |
2023-097 |
13:30:00 |
Thruster Disable for MT Translate WS7 WS5 (M23_097_A_05.UAF) |
2023-04-06 |
2023-096 |
08:20:00 |
Soyuz Relocate (69S from MRM-2 to NM) (H23_096_B_03.UAF) |
2023-04-05 |
2023-095 |
14:10:00 |
Thruster Disable for MISSE Ops Day 7 MT Xlate WS2 WS7 (M23_095_A_03.UAF) |
2023-04-04 |
2023-094 |
13:45:00 |
Thruster Disable for MISSE Ops Day 6 (M23_094_A_03.UAF) |
2023-04-04 |
2023-094 |
05:14:00 |
Deployed NICER post MISSE ROBO Operations Day 5 |
2023-04-04 |
2023-094 |
05:03:53 |
Updated EOP and reset GEONS clock bias |
2023-04-03 |
2023-093 |
13:15:00 |
Thruster Disable for MISSE Ops Day 5 (M23_093_A_03.UAF) |
2023-04-03 |
2023-093 |
11:59:33 |
Stowed NICER for MISSE ROBO Operations Day 5 |
2023-04-03 |
2023-093 |
03:54:40 |
Deployed NICER post MISSE ROBO Operations Day 4 |
2023-04-03 |
2023-093 |
03:41:48 |
Updated EOP and reset GEONS clock bias |
2023-04-02 |
2023-092 |
11:55:12 |
Stowed NICER for MISSE ROBO Operations Day 4 |
2023-04-02 |
2023-092 |
05:56:42 |
Deployed NICER post MISSE ROBO Operations Day 3 |
2023-04-02 |
2023-092 |
05:40:23 |
Updated EOP and reset GEONS clock bias |
2023-04-02 |
2023-092 |
13:15:00 |
Thruster Disable for MISSE Ops Day 4 (M23_092_A_03.UAF) |
2023-04-01 |
2023-091 |
14:40:00 |
Thruster Disable for MISSE Ops Day 3 (M23_091_A_03.UAF) |
2023-04-01 |
2023-091 |
11:59:13 |
Stowed NICER for MISSE ROBO Operations Day 3 |
2023-03-31 |
2023-090 |
19:44:00 |
US OPM to pXVV with Timeliner Profile 14 (M23_090_A_05.UAF) |
2023-03-31 |
2023-090 |
09:35:00 |
Thruster Disable for ERA Ops (H23_090_B_05.UAF) |
2023-03-30 |
2023-089 |
14:48:00 |
Cygnus18 Reboost (M23_089_A_08.UAF) |
2023-03-29 |
2023-088 |
14:07:36 |
Deployed NICER post MISSE ROBO Operations Day 2 |
2023-03-29 |
2023-088 |
16:37:00 |
US OPM to nXVV with Timeliner Profile 6 (M23_088_A_03.UAF) |
2023-03-29 |
2023-088 |
14:13:28 |
Updated EOP and reset GEONS clock bias |
2023-03-28 |
2023-087 |
23:41:00 |
Thruster Disable for MISSE Ops Day 2 (M23_087_B_05.UAF) |
2023-03-28 |
2023-087 |
08:54:00 |
Soyuz Undocking on RS Control 68S from MRM1 (H23_087_R_07.UAF) |
2023-03-28 |
2023-087 |
00:15:00 |
Deployed NICER post MISSE ROBO Operations Day 1 |
2023-03-28 |
2023-087 |
20:48:53 |
Stowed NICER for MISSE ROBO Operations Day 2 |
2023-03-27 |
2023-086 |
12:09:00 |
Thruster Disable for MISSE Ops MT Xlate WS7 WS2 (M23_086_A_05.UAF) |
2023-03-27 |
2023-086 |
10:54:18 |
Stowed NICER for MISSE ROBO Operations Day 1 |
2023-03-27 |
2023-086 |
23:54:49 |
Updated EOP and reset GEONS clock bias |
2023-03-23 |
2023-082 |
16:57:00 |
Thruster Disable for SPDM Ops MT Xlate WS5 WS7 (M23_082_B_03.UAF) |
2023-03-23 |
2023-082 |
01:05:00 |
Thruster Disable for JEM RMS Ops (M23_082_A_05.UAF) |
2023-03-22 |
2023-081 |
01:10:00 |
Thruster Disable for JEM RMS Ops (M23_080_B_04.UAF) |
2023-03-21 |
2023-080 |
01:25:00 |
Thruster Disable for JEM RMS Ops (M23_080_A_03.UAF) |
2023-03-20 |
2023-079 |
18:30:00 |
MT Translate WS4 WS5 (M23_079_A_03.UAF) |
2023-03-19 |
2023-078 |
20:00:00 |
Thruster Disable for SPDM and JEMRMS Ops (M23_078_A_03.UAF) |
2023-03-17 |
2023-076 |
00:35:00 |
Thruster Disable for JEM RMS Ops (M23_076_A_03.UAF) |
2023-03-16 |
2023-075 |
10:15:00 |
Dragon Docking (SpX-27 to N2F) (M23_075_A_07.UAF) |
2023-03-15 |
2023-074 |
15:07:00 |
68S Thruster Test on MM (M23_074_A_03.UAF) |
2023-03-14 |
2023-073 |
10:44:00 |
PDAM Aft Progress MLM Roll (M23_073_A_02.UAF) |
2023-03-13 |
2023-072 |
19:50:00 |
Thruster Disable for MT Translate (M23_072_B_03.UAF) |
2023-03-11 |
2023-070 |
06:41:00 |
Crew Dragon Undocking (Crew-5 from N2F) (M23_070_B_03.UAF) |
2023-03-10 |
2023-069 |
01:35:00 |
Thruster Disable for JEMRMS Ops (M23_069_B_06.UAF) |
2023-03-08 |
2023-067 |
18:33:00 |
Uploaded updated versions of RTS 250 and 251 to disable subset of detectors at <70 degrees |
2023-03-08 |
2023-067 |
19:12:00 |
83P Reboost (H23_067_A_10.UAF) |
2023-03-07 |
2023-066 |
13:37:00 |
The target catalog had bad coordinates for the COMET and thus PC rejected the pointing command and NICER stopped until the next target was commanded from the load.\n\nNICER stopped from 23-066-13:37:17.721 to 23-066-14:12:43.621 |
2023-03-07 |
2023-066 |
00:05:00 |
Thruster Disable for JEMRMS Ops (M23_065_D_05.UAF) |
2023-03-06 |
2023-065 |
17:22:00 |
69S Thruster Test on MM (M23_065_C_03.UAF) |
2023-03-06 |
2023-065 |
11:32:00 |
GMT 065 PDAM Aft Progress MLM Roll (M23_065_E_03.UAF) |
2023-03-06 |
2023-065 |
05:15:00 |
During a comet observation we had the wrong coordinates for the target in the catalog.\n\nPC wouldn’t accept the target, so NICER stopped.\nNICER stopped from 05:15:59 to 05:32:03 |
2023-03-06 |
2023-065 |
00:16:00 |
Thruster Disable for JEMRMS Ops (M23_065_B_03.UAF) |
2023-03-03 |
2023-062 |
04:25:00 |
Crew Dragon Docking (Crew-6 to N2Z) (M23_062_B_05.UAF) |
2023-03-01 |
2023-060 |
20:17:00 |
Changed MAX recorder file size for science files (index 1) to 20MB. (Trying to alleviate problem with data storage not disabling) |
2023-02-28 |
2023-059 |
15:54:00 |
Uploaded a modified RTS 243 to include disabling of 7-7, 2-3 and 2-6 at < 53 deg sun angle. |
2023-02-27 |
2023-058 |
17:37:00 |
Updated EOP and reset GEONS clock bias |
2023-02-26 |
2023-057 |
15:02:00 |
RS OPM to pXVV (H23_057_A_05.UAF) |
2023-02-25 |
2023-056 |
01:51:00 |
RS OPM to nXVV (H23_056_A_03.UAF) |
2023-02-25 |
2023-056 |
00:55:03 |
NICER Safe due to ISS maneuver (ISS maneuver action points were not disabled.)\n\nNICER Science downtime from 23-057-00:55:03 to 23-057-01:54:53. |
2023-02-25 |
2023-056 |
22:50:00 |
69S Docking MRM2 (M23_056_C_10.UAF) |
2023-02-21 |
2023-052 |
18:30:00 |
Thruster Disable for MT Translate WS4 to WS2 (M23_052_D_05.UAF) |
2023-02-21 |
2023-052 |
15:59:00 |
Added disable of detector 2-4 for sun angled less than 60 degrees. Uploaded RTS241_v09. |
2023-02-21 |
2023-052 |
14:24:00 |
Reset the star tracker due to stuck imaging. Unfortunately, commanded the reset during a BBO. :( Resulted in Safe Mode. Science interrupted from 23-052-14:24 – 23-052-14:26:42 |
2023-02-21 |
2023-052 |
01:02:00 |
Thruster Disable for JEMRMS Ops (M23_052_C_03.UAF) |
2023-02-20 |
2023-051 |
15:38:00 |
Added detector 4-3 to the set of detectors that get disabled at low sun angles (RTS 241). Uplinked and enabled RTS 241 for this change. |
2023-02-20 |
2023-051 |
13:45:00 |
Thruster Disable for 83P hatch closing (H23_051_A_07.UAF) |
2023-02-20 |
2023-051 |
03:30:00 |
83P Reboost (H23_051_C_05.UAF) |
2023-02-18 |
2023-049 |
22:42:00 |
RS OPM to pXVV (H23_050_B_03.UAF) |
2023-02-18 |
2023-049 |
01:15:00 |
82P Undocking on RS Control (M23_049_C_06.UAF) |
2023-02-18 |
2023-049 |
02:19:00 |
Disabled OHMAN TOO response (MAXI was giving overnight multiple triggers in a row which we think were false)\n\nUploaded an ATS in the A buffer that we will switch to from the load running in the B buffer 5 minutes prior to the 82P undock. ATS A will point the head away from the undock in case of contamination AZ=90deg, EL=88 deg. It will then switch back to the science ATS 3 hours later.\n\nWhen the load commanded the head to EL 88 deg it hit the softstop and tripped the EL fault. This had to be cleared before we could go back to science pointing.\n\nSCIENCE INTERRUPTED FROM 2023-049-02:19:00 UNTIL 23-049-03:47:54 |
2023-02-17 |
2023-048 |
21:45:00 |
CMG Maneuver to Stage TEA (M23_048_B_08.UAF) |
2023-02-16 |
2023-047 |
14:36:00 |
Uplinked RTS rts242_02.dat so that detectors were disabled at low sun angles. -TURNS OUT THAT 242 was not the correct version on-board and was not turning off all the detectors.\n\nLoaded NICER V2_7_1_6 CCR #040 WP/AP updated for Data Storage Management and modified RTS 70 and RTS 244 to enable AP 111 and 110. |
2023-02-16 |
2023-047 |
08:10:00 |
82P Clamp Uninstall and Hatch Closure (H23_047_A_08.UAF) |
2023-02-15 |
2023-046 |
20:36:00 |
Modified and uplinked RTS rts243_06.dat so that Detector 4-3 was disabled at low sun angles. Was playing around with detector configuration from 20:30 through 20:40. |
2023-02-15 |
2023-046 |
15:30:00 |
CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_046_A_03.UAF) |
2023-02-15 |
2023-046 |
15:00:00 |
NICER GSFC SPOCC SEN firewall reverted to previous since GSE packets weren't being received. |
2023-02-14 |
2023-045 |
15:00:00 |
NICER GSFC SPOCC firewall upgrade - GSE packets 603 and 611 not being received. |
2023-02-11 |
2023-042 |
10:29:00 |
Thruster Disable for 83P Hatch Opening (H23_042_B_03.UAF) |
2023-02-11 |
2023-042 |
06:45:00 |
83P Docking SM Aft (H23_042_A_12.UAF) |
2023-02-09 |
2023-040 |
04:09:44 |
NICER star tracker imaging stuck. ST reset at 13:56 |
2023-02-07 |
2023-038 |
04:23:00 |
81P Undocking from SM Aft CMG Control (M23_038_A_09.UAF) |
2023-02-06 |
2023-037 |
07:10:00 |
CMG Maneuver to Stage TEA (M23_037_A_03.UAF) |
2023-02-03 |
2023-034 |
19:50:00 |
CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_034_B_03.UAF) |
2023-02-03 |
2023-034 |
12:35:00 |
81P Prop Purge (M23_034_A_03.UAF) |
2023-02-03 |
2023-034 |
09:25:00 |
81P Reboost (H23_034_R_07.UAF) |
2023-02-02 |
2023-033 |
09:55:00 |
US EVA 85 1A IROSA Prep Part2 (M23_033_A_03.UAF) |
2023-01-31 |
2023-031 |
17:12:00 |
Turned MPU 6-5 back on and then back off again. |
2023-01-31 |
2023-031 |
16:55:00 |
Ran the happy pill for MPU 7-4 |
2023-01-31 |
2023-031 |
17:20:00 |
IPA FSE Jettison MCS Configuration (M23_031_A_05.UAF) |
2023-01-30 |
2023-030 |
13:30:00 |
Thruster Disable for IPA Jettison Setup (M23_030_A_07.UAF) |
2023-01-27 |
2023-027 |
11:30:00 |
Thruster Disable for 81P Hatch Close (H23_027_A_05.UAF) |
2023-01-27 |
2023-027 |
00:20:00 |
Thruster Disable for JEMRMS Ops (M23_027_B_03.UAF) |
2023-01-26 |
2023-026 |
15:10:00 |
Thruster Disable for MT Translate WS7 to WS4 (M23_026_A_03.UAF) |
2023-01-25 |
2023-025 |
15:07:00 |
Thruster Disable for MT Translate WS2 to WS7 (M23_025_A_03.UAF) |
2023-01-24 |
2023-024 |
18:07:46 |
MPU 6-6 detector annealing started |
2023-01-24 |
2023-024 |
17:20:00 |
Ops: MSS Uplink and Checkouts, SSRMS Motion Requred for Checkouts - ROBO in NIVER FOV until 1/25/2023 16:00 |
2023-01-23 |
2023-023 |
19:15:01 |
Updated EOP and reset GEONS clock bias |
2023-01-20 |
2023-020 |
10:45:00 |
US EVA 84 1A IROSA Prep (M23_020_A_05.UAF) |
2023-01-19 |
2023-019 |
14:30:00 |
Thruster Disable for MT Translate WS5 to WS2 (M23_019_A_03.UAF) |
2023-01-18 |
2023-018 |
14:22:00 |
81P Reboost (H23_018_A_10.UAF) |
2023-01-17 |
2023-017 |
14:25:00 |
Thruster Disable for MT Translate WS3 to WS5 (M23_017_A_03.UAF) |
2023-01-12 |
2023-012 |
15:10:00 |
Thruster Disable for MT Translate WS4 to WS3 (M23_012_A_03.UAF) |
2023-01-10 |
2023-010 |
02:10:00 |
Thruster Disable for JEMRMS Ops (M23_010_A_03.UAF) |
2023-01-09 |
2023-009 |
21:33:00 |
Cargo Dragon Undocking (SpX-26 from N2Z) (M23_009_A_03.UAF) |
2023-01-09 |
2023-009 |
15:35:00 |
Thruster Disable for 81P hatch opening (H23_009_B_03.UAF) |
2023-01-07 |
2023-007 |
21:18:00 |
MT Translate WS3 to WS4 (M23_007_B_03.UAF) |
2023-01-07 |
2023-007 |
14:30:00 |
Thruster Disable for SPDM Ops (M23_007_A_03.UAF) |
2023-01-06 |
2023-006 |
15:00:00 |
Thruster Disable for SPDM Ops RPCM R&R (M23_006_B_05.UAF) |
2023-01-06 |
2023-006 |
02:00:00 |
Thruster Disable for JEMRMS Ops (M23_006_A_05.UAF) |
2023-01-05 |
2023-005 |
15:00:00 |
Thruster Disable for SPDM Ops (M23_005_B_03.UAF) |
2023-01-05 |
2023-005 |
15:00:00 |
ROBO OPs: Ops: S11A-A RPCM RnR until 007-05:00 in NICER FOV |
2023-01-04 |
2023-004 |
17:44:00 |
After ATS commanded NICER to a target change at 2023-004-17:44:00, the AZ motor failed to move the head again and NICER did not track the target. Operator noticed NICER was not tracking and enabled the sun angle violation APs that were still disabled from the morning safe, so that NICER would safe again, since cause of not being able to track was unknown at the time. Operator tried to move head in AZ direction again without success.\n\nEngineers (Alice and Gary) were called in and team was able to “unstick” the AZ by commanding multiple slower movements of the head in the AZ direction.\n\nScience was resumed at 23-004-22:25:48. |
2023-01-04 |
2023-004 |
10:53:27 |
NICER entered safe mode at FSW AP #66 (AZ Sun angle violation) tripped at 23-004-10:53:27.062. This due to sticky AZ motor not being able to move the head to the commanded target.\nOperator recovered to science collection at 23-004-12:18:40. |
2023-01-04 |
2023-004 |
18:02:00 |
SpX-26 Dedicated Thruster Firing Test (M23_004_A_05.UAF) |
2023-01-04 |
2023-004 |
23:10:00 |
Thruster Disable for MT Translate WS7 to WS3 (M23_005_A_03.UAF) ROBO Ops: Ops: Mnvr to Xlate,Xlate WS 7>3, S11A-A RPCM RR Setup until 005-04:50 |
2023-01-03 |
2023-003 |
03:32:00 |
NICER entered safe mode due to Action Point 48 FDC. Too few GPS signals. Alerting system was down, so operators didn’t see until around 13:00 at which time recovery commenced. Total Science downtime was from 23-003-03:32 until 23-003-13:37:38 |
2022-12-30 |
2022-364 |
12:40:00 |
Thruster Disable for SPDM RPCM R&R Ops Day2 (M22_364_B_05.UAF) |
2022-12-30 |
2022-364 |
01:24:00 |
Thruster Disable for JEMRMS Ops (M22_364_A_03.UAF) |
2022-12-29 |
2022-363 |
14:50:00 |
Thruster Disable for SPDM RPCM R&R Ops Day1 (M22_363_C_03.UAF) |
2022-12-29 |
2022-363 |
01:47:00 |
Thruster Disable for JEMRMS Ops (M22_363_B_03.UAF) |
2022-12-28 |
2022-362 |
18:00:00 |
Thruster Disable for SPDM RPCM R&R Setup Ops (M22_362_B_03.UAF) |
2022-12-28 |
2022-362 |
00:15:00 |
Thruster Disable for JEMRMS Ops (M22_362_A_03.UAF) |
2022-12-27 |
2022-361 |
07:58:00 |
Thruster Disable for 82P hatch opening (H22_361_B_03.UAF) |
2022-12-26 |
2022-360 |
00:10:00 |
Thruster Disable for JEMRMS Ops (M22_360_A_08.UAF) |
2022-12-22 |
2022-356 |
11:08:00 |
US EVA IROSA 4A Install (M22_356_D_03.UAF) |
2022-12-21 |
2022-355 |
12:32:00 |
PDAM AftProgress MLM Roll (M22_355_E_02.UAF) |
2022-12-20 |
2022-354 |
20:45:00 |
MT Translate WS5 to WS7 (M22_354_B_03.UAF) |
2022-12-20 |
2022-354 |
00:10:00 |
Thruster Disable for JEMRMS Ops (M22_354_A_06.UAF) |
2022-12-18 |
2022-352 |
15:14:00 |
Thruster Disable for 68S Robotic Survey (M22_352_B_03.UAF) |
2022-12-16 |
2022-350 |
20:15:10 |
Updated EOP and reset GEONS clock bias |
2022-12-16 |
2022-350 |
07:44:00 |
68S Thruster Test on MM (M22_350_B_03.UAF) |
2022-12-15 |
2022-349 |
23:55:00 |
Thruster Disable for JEMRMS Ops (M22_349_D_05.UAF) |
2022-12-15 |
2022-349 |
03:00:55 |
NICER safed due to ST attitude divergence either from debris moving through FOV or the star tracker imaging\nNICER's head was pointed away from the direction of the debris to aviod contamination.\nRussian EVA on 349 was scrubbed due to leak.\nScience target tracking was resumed at 18:03:15 |
2022-12-15 |
2022-349 |
01:00:00 |
At ~01:00UTC HOSC received a warning of low pressure in MRM-1 thermal control loop. Shortly after, a large amount of particulate was seen being released from the FGB Nadir Soyuz. Leaking substance is Isooctance or 2,2,4-Trimethylpentane. Leak was pluming in the forward direction, towards the US segment, and more starboard. |
2022-12-14 |
2022-348 |
17:10:00 |
CMG Maneuver to Stage TEA (M22_348_D_03.UAF) |
2022-12-14 |
2022-348 |
01:30:00 |
Thruster Disable for JEMRMS Ops (M22_348_B_05.UAF) |
2022-12-14 |
2022-348 |
21:15:00 |
Russian EVA 56 ABORTED (M22_349_C_05.UAF) |
2022-12-12 |
2022-346 |
11:05:00 |
Thruster Disable for 82P Hatch Closing (M22_346_A_03.UAF) |
2022-12-12 |
2022-346 |
01:20:00 |
Thruster Disable for JEMRMS Ops (M22_346_B_03.UAF) |
2022-12-10 |
2022-344 |
14:08:00 |
R Quat at Stage TEA (M22_344_B_08.UAF) |
2022-12-10 |
2022-344 |
14:08:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_344_A_05.UAF) |
2022-12-08 |
2022-342 |
08:20:00 |
Thruster Disable for 82P Hatch Opening (H22_342_A_07.UAF) |
2022-12-06 |
2022-340 |
15:00:00 |
HOSC turned on NICER survival heater after IROSA install |
2022-12-05 |
2022-339 |
19:55:00 |
Thruster Disable for RMCT Checkout (M22_339_A_03.UAF) |
2022-12-03 |
2022-337 |
10:37:00 |
US EVA IROSA 3A Install (M22_337_B_05.UAF) - Panel is on the starboard side of the ISS and near NICER |
2022-12-03 |
2022-337 |
07:00:00 |
HOSC Turned off NICER survival heater for IROSA install. |
2022-12-03 |
2022-337 |
00:55:00 |
Thruster Disable for JEMRMS Ops (M22_337_C_03.UAF) |
2022-12-02 |
2022-336 |
02:30:00 |
Thruster Disable for JEMRMS Ops (M22_336_A_05.UAF) |
2022-11-30 |
2022-334 |
20:30:00 |
ROBO Ops: SSRMS Mnvr, MT Translate WS 4>1, WO MBS 4, IROSA 3A EVA Setup until 335-03:00 |
2022-11-30 |
2022-334 |
14:15:00 |
Thruster Disable SPDM Ops and MT Translate WS4 to WS1 (M22_334_B_08.UAF) |
2022-11-30 |
2022-334 |
11:20:00 |
81P Reboost (H22_334_A_08.UAF) |
2022-11-29 |
2022-333 |
21:55:00 |
Thruster Disable MT Translate WS2 WS4 (M22_333_B_05.UAF) |
2022-11-27 |
2022-331 |
10:45:00 |
Cargo Dragon Docking (SpX-26 to N2Z) (M22_331_A_03.UAF) |
2022-11-25 |
2022-329 |
06:15:00 |
Thruster Disable for ERA (H22_329_C_05.UAF) |
2022-11-25 |
2022-329 |
09:40:00 |
Russian EVA 56 (H22_329_A_13.UAF) |
2022-11-17 |
2022-321 |
12:00:00 |
Russian EVA 55 (M22_321_A_06.UAF) |
2022-11-16 |
2022-320 |
03:17:15 |
OPM to pXVV with Timeliner Profile 14 (M22_320_A_05.UAF) |
2022-11-15 |
2022-319 |
19:30:00 |
ROBO Ops: Mnvr to Spx-26 Setup until 20:00 |
2022-11-15 |
2022-319 |
10:40:00 |
US EVA 81 (M22_319_A_09.UAF) |
2022-11-14 |
2022-318 |
21:51:16 |
OPM to nXVV with Timeliner Profile 6 (M22_318_A_05.UAF) |
2022-11-14 |
2022-318 |
12:58:00 |
Thruster Disable SPDM Ops (M22_318_B_03.UAF) |
2022-11-13 |
2022-317 |
21:30:00 |
ROBO Ops: Mnvr to EVA Viewing Position until 22:00 |
2022-11-13 |
2022-317 |
18:30:00 |
MT Translate WS5 to WS2 (M22_317_A_05.UAF) / 17:40 ROBO Ops: Mnvr to Spx-26 Setup until 19:40 |
2022-11-12 |
2022-316 |
15:20:00 |
MT Translate WS7 to WS5 and SPDM SASA Swap (M22_316_A_03.UAF) |
2022-11-11 |
2022-315 |
14:55:00 |
Thruster Disable for SSRMS SASA Setup (M22_315_A_03.UAF) |
2022-11-10 |
2022-314 |
14:45:00 |
Thruster Disable for SPDM Ops (M22_314_A_08.UAF) |
2022-11-10 |
2022-314 |
05:32:00 |
MT Translate WS4 WS7 (M22_314_B_03.UAF) |
2022-11-09 |
2022-313 |
08:00:00 |
Cygnus18 Capture (M22_313_D_05.UAF) |
2022-11-09 |
2022-313 |
12:20:00 |
Cygnus18 Install (M22_313_E_05.UAF) |
2022-11-09 |
2022-313 |
16:30:00 |
Thruster Disable for 82P hatch closing (M22_313_B_07.UAF) |
2022-11-08 |
2022-312 |
23:35:17 |
Updated EOP and reset GEONS clock bias - GEONS not converged |
2022-11-08 |
2022-312 |
12:53:58 |
Updated EOP and reset GEONS clock bias - GEONS not converged |
2022-11-07 |
2022-311 |
15:56:02 |
Reset NICER star tracker after noticing that imaging was stuck |
2022-11-02 |
2022-306 |
15:16:47 |
NICER in safe mode due to low sun angle constraint violation while slewing to TargetID=1970. NICER back collecting science at 15:23:51 |
2022-11-01 |
2022-305 |
09:00:00 |
Thruster Disable for ERA Mission (H22_305_A_03.UAF) |
2022-10-30 |
2022-303 |
11:08:38 |
MPU1 powered off due to SEU. Fully recovered at 22-303-14:04:10 |
2022-10-28 |
2022-301 |
14:27:00 |
RS OPM to pXVV (H22_301_B_03.UAF) |
2022-10-28 |
2022-301 |
04:37:00 |
Thruster Disable for 82P Clamp Install (H22_301_C_03.UAF) |
2022-10-28 |
2022-301 |
02:20:00 |
82P Docking MRM2 (M22_301_A_06.UAF) |
2022-10-27 |
2022-300 |
15:12:00 |
RS OPM to nXVV (H22_300_A_05.UAF) |
2022-10-26 |
2022-299 |
02:50:00 |
MT Translate WS7 to WS4 (M22_299_A_03.UAF) |
2022-10-24 |
2022-297 |
14:16:00 |
Thruster Disable for SPDM Ops (M22_297_A_03.UAF) |
2022-10-24 |
2022-297 |
23:15:00 |
PDAM Aft Progress 81P MLM Roll (M22_297_B_03.UAF) |
2022-10-23 |
2022-296 |
21:41:00 |
80P Undocking with USTO mnvrs (M22_296_A_10.UAF) |
2022-10-21 |
2022-294 |
11:00:00 |
Thruster Disable for 80P Hatch Closure (H22_294_A_05.UAF) |
2022-10-20 |
2022-293 |
09:30:00 |
Thruster Disable for ERA Mission (H22_293_B_03.UAF) |
2022-10-19 |
2022-292 |
16:30:00 |
Thruster Disable for SPDM Ops (M22_292_A_05.UAF) |
2022-10-18 |
2022-291 |
13:34:00 |
Thruster Disable MT Translate (M22_291_B_02.UAF) |
2022-10-17 |
2022-290 |
18:17:00 |
PDAM Aft Progress MLM Roll (M22_290_B_02.UAF) |
2022-10-14 |
2022-287 |
15:30:00 |
Crew Dragon Undocking (Crew-4 from N2Z) (M22_287_R_03.UAF) |
2022-10-06 |
2022-279 |
19:20:00 |
Crew Dragon Docking (Crew-5 to N2F) (M22_279_A_03.UAF) |
2022-10-01 |
2022-274 |
10:15:00 |
81P Reboost (H22_274_A_10.UAF) |
2022-09-29 |
2022-272 |
11:31:00 |
MT Translate WS3 to WS4 (M22_272_B_03.UAF) |
2022-09-29 |
2022-272 |
06:55:00 |
67S Undocking on CMG Control (M22_272_A_05.UAF) |
2022-09-27 |
2022-270 |
13:45:00 |
Thruster Disable for SPDM Ops (M22_270_A_03.UAF) |
2022-09-26 |
2022-269 |
14:30:00 |
Thruster Disable for SPDM and 81P Hatch Closure (M22_269_B_07.UAF) |
2022-09-26 |
2022-269 |
12:50:00 |
67S Thruster Test (H22_269_C_03.UAF) |
2022-09-26 |
2022-269 |
14:30:00 |
CTC3 Unstow Setup - ROBO possibly in FOV until 270-04:30 |
2022-09-25 |
2022-268 |
13:45:00 |
Thruster Disable for SPDM Ops (M22_268_A_05.UAF) |
2022-09-24 |
2022-267 |
10:45:00 |
Thruster Disable for SPDM Ops (M22_267_A_06.UAF) |
2022-09-23 |
2022-266 |
13:52:00 |
Thruster Disable for SPDM Ops (M22_266_A_03.UAF) |
2022-09-22 |
2022-265 |
15:45:00 |
Thruster Disable for SPDM Ops (M22_265_B_05.UAF) |
2022-09-22 |
2022-265 |
05:01:00 |
US OPM to pXVV with MMO3 (M22_265_A_03.UAF) |
2022-09-21 |
2022-264 |
16:45:39 |
68S Docking MRM1 2 Orbit (H22_264_A_05.UAF) |
2022-09-21 |
2022-264 |
05:32:00 |
RS OPM to nXVV (H22_264_B_04.UAF) |
2022-09-20 |
2022-263 |
15:14:11 |
Updated EOP and reset GEONS clock bias |
2022-09-19 |
2022-262 |
13:45:00 |
Thruster Disable for SPDM Ops (M22_262_A_03.UAF) |
2022-09-18 |
2022-261 |
13:30:00 |
Thruster Disable for SPDM Ops (M22_261_A_03.UAF) |
2022-09-17 |
2022-260 |
13:45:00 |
Thruster Disable for SPDM Ops (M22_260_A_06.UAF) |
2022-09-16 |
2022-259 |
14:30:00 |
Thruster Disable for SPDM Ops (M22_259_A_03.UAF) |
2022-09-15 |
2022-258 |
17:05:00 |
81P Reboost (H22_258_A_06.UAF) |
2022-09-14 |
2022-257 |
22:27:00 |
Thruster Disable for SPDM Ops (M22_257_B_03.UAF) |
2022-09-14 |
2022-257 |
09:28:00 |
Thruster Disable for ERA (H22_257_A_03.UAF) |
2022-09-13 |
2022-256 |
08:35:00 |
Thruster Disable for ERA (H22_256_A_05.UAF) |
2022-09-12 |
2022-255 |
14:30:00 |
CTC3 Unstow Setup - ROBO possibly in FOV until 256-04:30 |
2022-09-12 |
2022-255 |
14:30:00 |
Thruster Disable for SPDM Ops (M22_255_A_03.UAF) |
2022-09-08 |
2022-251 |
13:20:00 |
Thruster Disable for SPDM Ops (M22_251_A_05.UAF) |
2022-09-08 |
2022-251 |
10:17:15 |
NICER FSW Action Point 126 tripped (IM reporting MPU4 no data received) causing RTS 65 to power off MPU4.\nNICER was not in SAA or either horn. Likely SEU on the PDB MPU 4 fully recovered at 22-251-12:15:54 |
2022-09-07 |
2022-250 |
01:37:00 |
Thruster Disable for JEMRMS Ops (M22_250_A_03.UAF) |
2022-09-06 |
2022-249 |
02:10:00 |
Thruster Disable for JEMRMS Ops (M22_249_A_03.UAF) |
2022-09-06 |
2022-249 |
08:45:00 |
Thruster Disable 80P Hatch Open (H22_249_B_03.UAF) |
2022-09-05 |
2022-248 |
08:30:00 |
Thruster Disable 81P Hatch Open (H22_248_A_03.UAF) |
2022-09-02 |
2022-245 |
11:05:00 |
RS EVA 54A (M22_245_B_05.UAF) |
2022-08-31 |
2022-243 |
14:30:00 |
Thruster Disable for SPDM Ops (M22_243_A_03.UAF) |
2022-08-25 |
2022-237 |
01:15:00 |
81P Reboost (H22_237_A_08.UAF) |
2022-08-24 |
2022-236 |
09:55:00 |
Thruster Disable for ERA (H22_236_A_03.UAF) |
2022-08-22 |
2022-234 |
17:30:00 |
Thruster Disable for MT Translate WS6 3 (M22_234_A_03.UAF) |
2022-08-19 |
2022-231 |
14:30:00 |
Cargo Dragon Undocking (SpX-25 from N2F) (M22_231_A_03.UAF) |
2022-08-17 |
2022-229 |
10:50:00 |
RS EVA 54 (M22_229_A_05.UAF) |
2022-08-15 |
2022-227 |
00:21:00 |
Thruster Disable for JEM RMS Ops (M22_227_A_03.UAF) |
2022-08-12 |
2022-224 |
00:30:00 |
Thruster Disable for JEM RMS Ops (M22_224_A_03.UAF) |
2022-08-10 |
2022-222 |
06:26:00 |
81P Reboost (H22_222_A_06.UAF) |
2022-08-09 |
2022-221 |
08:29:00 |
Thruster Disable for close 80P hatch before EVA 54 (H22_221_A_05.UAF) |
2022-08-08 |
2022-220 |
14:30:00 |
Thruster Disable for SPDM Ops MT Translate (M22_220_A_03.UAF) |
2022-08-03 |
2022-215 |
00:18:45 |
Deployed NICER Post-MISSE ROBO Ops Day 3 |
2022-08-03 |
2022-215 |
13:45:00 |
Thruster Disable for SPDM Ops MT Translate MISSE (M22_215_A_05.UAF) |
2022-08-02 |
2022-214 |
13:45:00 |
Thruster Disable for SPDM Ops MISSE (M22_214_A_03.UAF) |
2022-08-02 |
2022-214 |
12:18:32 |
Stowed NICER for MISSE ROBO Operations Day 3 |
2022-08-02 |
2022-214 |
04:22:16 |
Deployed NICER Post-MISSE ROBO Ops Day 2. |
2022-08-01 |
2022-213 |
13:45:00 |
Thruster Disable for SPDM Ops MISSE and 81P Clamps (M22_213_B_03.UAF) |
2022-08-01 |
2022-213 |
12:20:20 |
Stowed NICER for MISSE ROBO Ops Day 2. |
2022-08-01 |
2022-213 |
05:08:08 |
Deployed NICER post MISSE ROBO Ops Day 1 |
2022-07-31 |
2022-212 |
13:45:00 |
Thruster Disable for SPDM Ops MISSE (M22_212_B_03.UAF) |
2022-07-31 |
2022-212 |
12:20:28 |
Stowed NICER for MISSE ROBO Ops Day 1 |
2022-07-30 |
2022-211 |
13:45:00 |
Thruster Disable for SPDM Ops MT Translate MISSE (M22_211_B_03.UAF) |
2022-07-29 |
2022-210 |
08:32:00 |
Thruster Disable for ERA (H22_210_A_03.UAF) |
2022-07-28 |
2022-209 |
08:30:00 |
Thruster Disable for ERA (H22_209_A_03.UAF) |
2022-07-27 |
2022-208 |
14:30:00 |
Thruster Disable for SPDM Operations (MISSE) (M22_208_B_03.UAF) |
2022-07-26 |
2022-207 |
23:30:00 |
Thruster Disable for JEMRMS Ops (M22_207_A_04.UAF) |
2022-07-25 |
2022-206 |
20:55:00 |
Thruster Disable for JEMRMS Ops (M22_206_A_03.UAF) |
2022-07-25 |
2022-206 |
10:30:00 |
Thruster Disable for open 81P hatch (H22_206_B_03.UAF) |
2022-07-24 |
2022-205 |
13:45:00 |
Thruster Disable for SPDM ORU Ops (M22_205_A_05.UAF) |
2022-07-23 |
2022-204 |
13:45:00 |
MT Translate WS6 to WS7 and SPDM Ops (M22_204_A_05.UAF) |
2022-07-22 |
2022-203 |
01:45:00 |
Thruster Disable for SPDM ORU Operations (M22_203_A_03.UAF) |
2022-07-22 |
2022-203 |
13:45:00 |
Thruster Disable for SPDM ORU Ops and 80P Clamps (M22_203_B_03.UAF) |
2022-07-21 |
2022-202 |
11:30:00 |
RS EVA ESA (M22_202_A_05.UAF) |
2022-07-20 |
2022-201 |
23:25:00 |
MT Translate WS7 to WS6 (M22_201_B_06.UAF) |
2022-07-20 |
2022-201 |
04:40:00 |
CMG Maneuver to Stage TEA (M22_201_A_05.UAF) |
2022-07-16 |
2022-197 |
13:25:00 |
Cargo Dragon Docking (SpX-25 to N2F) (M22_197_B_07.UAF) |
2022-07-12 |
2022-193 |
15:20:00 |
Thruster Disable 80P Clamp Removal for ESA EVA (H22_193_A_03.UAF) |
2022-07-11 |
2022-192 |
23:50:00 |
Thruster Disable for JEMRMS Ops (M22_192_B_03.UAF) |
2022-07-11 |
2022-192 |
03:30:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_192_A_07.UAF) |
2022-07-07 |
2022-188 |
16:10:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_188_A_05.UAF) |
2022-07-06 |
2022-187 |
14:30:00 |
SPDM ORU Ops RRM3 STPH5 (M22_187_A_05.UAF) |
2022-07-05 |
2022-186 |
19:45:00 |
MT Translate WS6 to WS7 and SPDM Ops (M22_186_A_06.UAF) |
2022-07-02 |
2022-183 |
20:38:00 |
Thruster Disable for NRAL Deploy (M22_183_A_07.UAF) |
2022-07-01 |
2022-182 |
00:10:00 |
Thruster Disable for JEMRMS Ops (M22_182_B_03.UAF) |
2022-06-30 |
2022-181 |
20:50:00 |
Dedicated Thruster Firing Test (M22_181_A_07.UAF) |
2022-06-28 |
2022-179 |
07:35:00 |
Cygnus17 Release (M22_179_C_03.UAF) |
2022-06-28 |
2022-179 |
05:49:00 |
Cygnus17 Unberth (M22_179_B_03.UAF) |
2022-06-26 |
2022-177 |
07:15:00 |
US OPM to pXVV with Timeliner Profile 11 (M22_177_A_03.UAF) |
2022-06-25 |
2022-176 |
16:12:00 |
Cygnus17 Reboost (M22_176_A_10.UAF) |
2022-06-25 |
2022-176 |
03:23:00 |
US OPM to nXVV with Timeliner Profile 3 (M22_176_B_02.UAF) |
2022-06-24 |
2022-175 |
14:30:00 |
Thruster Disable 81P Hatch Close (H22_175_B_07.UAF) |
2022-06-22 |
2022-173 |
08:10:00 |
Thruster Disable ERA Ops (M22_173_A_03.UAF) |
2022-06-21 |
2022-172 |
08:20:00 |
Thruster Disable ERA Ops (M22_172_A_07.UAF) |
2022-06-21 |
2022-172 |
03:55:00 |
US OPM to pXVV with Timeliner Profile 11 (M22_172_B_05.UAF) |
2022-06-20 |
2022-171 |
14:05:00 |
Cygnus17 Reboost (M22_171_B_05.UAF) |
2022-06-19 |
2022-170 |
15:43:00 |
US OPM to nXVV with Timeliner Profile 3 (M22_170_B_03.UAF) |
2022-06-16 |
2022-167 |
17:53:00 |
81P PDAM (M22_167_B_02.UAF) |
2022-06-10 |
2022-161 |
14:45:55 |
Detector 5-4 looked out of family so we reset it |
2022-06-09 |
2022-160 |
14:40:00 |
Thruster Disable for SPDM Ops RPCM R&R Cleanup (M22_160_C_02.UAF) |
2022-06-08 |
2022-159 |
14:40:00 |
Thruster Disable for SPDM Ops RPCM R&R (M22_159_C_02.UAF) |
2022-06-03 |
2022-154 |
19:00:00 |
Thruster Disable for SPDM Ops (M22_154_D_03.UAF) |
2022-06-03 |
2022-154 |
14:27:00 |
Thruster Disable for 81P hatch opening 2 Orbit (H22_154_B_03.UAF) |
2022-06-03 |
2022-154 |
11:11:00 |
81P Docking 2 orb (H22_154_A_08.UAF) |
2022-06-01 |
2022-152 |
07:25:00 |
79P Undocking on CMG Control (M22_152_A_07.UAF) |
2022-05-27 |
2022-147 |
19:10:48 |
Updated EOP and reset GEONS clock bias |
2022-05-27 |
2022-147 |
08:00:00 |
79P Prop Purge on CMG Attitude Hold (M22_147_A_03.UAF) |
2022-05-25 |
2022-145 |
17:30:00 |
CST-100 Undocking (OFT-2 on N2F) (M22_145_A_05.UAF) |
2022-05-20 |
2022-140 |
20:00:00 |
CST-100 Docking (OFT-2 to N2F) (M22_140_A_05.UAF) |
2022-05-20 |
2022-140 |
10:20:00 |
CMG Maneuver to Stage TEA (M22_140_B_05.UAF) |
2022-05-19 |
2022-139 |
14:21:00 |
Thruster Disable for 79P before PrK Leak checks (H22_139_B_05.UAF) |
2022-05-19 |
2022-139 |
13:26:00 |
NICER Flash Image TMR checks and maintenance. |
2022-05-16 |
2022-136 |
23:05:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_136_A_03.UAF) |
2022-05-14 |
2022-134 |
17:27:00 |
79P Reboost (H22_134_A_13.UAF) |
2022-05-13 |
2022-133 |
09:30:00 |
Thruster Disable for ERA Operations (H22_133_B_06.UAF) |
2022-05-13 |
2022-133 |
01:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_133_A_08.UAF) |
2022-05-09 |
2022-129 |
04:10:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_129_A_03.UAF) |
2022-05-06 |
2022-126 |
13:20:00 |
Thruster Disable for MT Translate WS2 to WS6 (M22_126_A_05.UAF) |
2022-05-05 |
2022-125 |
14:40:00 |
Thruster Disable for 79P Hatch Opening (H22_125_C_03.UAF) |
2022-05-05 |
2022-125 |
08:50:00 |
Thruster Disable for ERA Operations (H22_125_B_03.UAF) |
2022-05-05 |
2022-125 |
04:37:00 |
Dragon Undocking (Crew-3 from N2F) (M22_125_D_02.UAF) |
2022-05-02 |
2022-122 |
13:10:00 |
Thruster Disable for 80P Hatch Opening (H22_122_A_06.UAF) |
2022-04-28 |
2022-118 |
12:35:00 |
RS EVA 53 (M22_118_C_09.UAF) |
2022-04-27 |
2022-117 |
22:25:00 |
Crew Dragon Docking (Crew-4 to N2Z) (M22_118_D_03.UAF) |
2022-04-26 |
2022-116 |
05:05:00 |
ROBO Parked Post Translate in NICER FOV until 22-126-13:20 |
2022-04-26 |
2022-116 |
02:05:00 |
MT Translate WS4 to 2 (M22_116_A_03.UAF) |
2022-04-25 |
2022-115 |
00:20:00 |
Dragon Undocking (Axiom-1 from N2Z) (M22_115_B_03.UAF) |
2022-04-25 |
2022-115 |
18:40:00 |
MT Translate WS6 to 4 (M22_115_C_03.UAF) |
2022-04-23 |
2022-113 |
12:15:00 |
Aft Progress PDAM/Reboost (M22_113_A_02.UAF) |
2022-04-19 |
2022-109 |
15:56:00 |
Updated EOP and reset GEONS clock bias |
2022-04-18 |
2022-108 |
12:05:00 |
RS EVA 52 (M22_108_A_11.UAF) |
2022-04-16 |
2022-106 |
09:37:00 |
Thruster Disable for 79P hatch closing (M22_106_A_05.UAF) |
2022-04-14 |
2022-104 |
19:00:00 |
Thruster Disable for MT Translate WS4 6 (M22_104_B_05.UAF) |
2022-04-13 |
2022-103 |
14:20:00 |
Thruster Disable for MT Translate WS2 4 (M22_103_C_03.UAF) |
2022-04-10 |
2022-100 |
09:45:00 |
Thruster Disable for 80P hatch closing (H22_100_A_05.UAF) |
2022-04-09 |
2022-099 |
11:30:00 |
Added commanding to load to look starboard from 99-11:30 to 99-11:55 due to Axiom-1 docking at N2Z. |
2022-04-09 |
2022-099 |
09:55:00 |
Dragon Docking (Axiom-1 to N2Z) (M22_099_B_03.UAF) |
2022-04-05 |
2022-095 |
17:32:00 |
Science downtime between 22-095-17:32 and22-095-17:40 (8 minutes) due timing of the ATS switchover |
2022-04-01 |
2022-091 |
08:15:00 |
Thruster Disable for open hatch 79P (H22_091_A_03.UAF) |
2022-03-31 |
2022-090 |
23:40:00 |
ROBO Parked MT Translate Config until 22-103-15:20. Parked in NICER FOV. |
2022-03-30 |
2022-089 |
06:20:00 |
65S Undocking with USTO mnvrs (M22_089_B_03.UAF) |
2022-03-26 |
2022-085 |
19:00:00 |
Ops: MT Translate 6 to 2 - ROBO in FOV until 095-17:45 |
2022-03-26 |
2022-085 |
18:05:00 |
MT Translate WS6 2 |
2022-03-26 |
2022-085 |
12:35:00 |
65S Thruster test |
2022-03-25 |
2022-084 |
01:16:00 |
GMT 084 Thruster Disable JEMRMS Ops |
2022-03-24 |
2022-083 |
02:25:00 |
GMT 083 Thruster Disable JEMRMS Ops |
2022-03-23 |
2022-082 |
08:53:00 |
US EVA RBVM Jumper Install |
2022-03-19 |
2022-078 |
06:39:00 |
RS OPM to pXVV |
2022-03-18 |
2022-077 |
18:39:00 |
67S Docking RSN 2 Orbit |
2022-03-18 |
2022-077 |
05:51:00 |
RS OPM to -XVV |
2022-03-16 |
2022-075 |
03:02:00 |
Thruster Disable for MT Translate 2 to 6 |
2022-03-15 |
2022-074 |
07:57:00 |
US EVA IROSA Prep 3A |
2022-03-11 |
2022-070 |
18:25:00 |
79P Reboost |
2022-03-11 |
2022-070 |
23:17:58 |
Updated EOP and reset GEONS clock bias |
2022-03-10 |
2022-069 |
23:30:00 |
Thruster Disable JEMRMS Ops |
2022-03-09 |
2022-068 |
16:10:00 |
Thruster Disable for MT Translate WS7 2 |
2022-03-08 |
2022-067 |
00:00:00 |
Thruster Disable JEMRMS Ops |
2022-03-06 |
2022-065 |
22:50:00 |
Thruster Disable JEMRMS Ops |
2022-03-03 |
2022-062 |
20:55:00 |
Thruster Disable JEMRMS Ops |
2022-03-02 |
2022-061 |
15:40:00 |
Thruster Disable for SPDM RRM and POA |
2022-03-01 |
2022-060 |
22:10:00 |
MT Translate WS4 7 |
2022-02-28 |
2022-059 |
23:38:00 |
Thruster Disable JEMRMS Ops |
2022-02-26 |
2022-057 |
00:47:00 |
79P Reboost |
2022-02-22 |
2022-053 |
10:30:00 |
Thruster Disable for 79P hatch closing |
2022-02-21 |
2022-052 |
07:30:00 |
Cygnus17 Capture |
2022-02-21 |
2022-052 |
11:21:00 |
Cygnus17 Install |
2022-02-17 |
2022-048 |
04:50:00 |
80P Docking to MRM2 |
2022-02-17 |
2022-048 |
09:25:00 |
Thruster Disable 80P Clamp Install |
2022-02-08 |
2022-039 |
07:06:00 |
79P Reboost |
2022-02-07 |
2022-038 |
19:10:00 |
Thruster Disable MT WS2 to WS4 |
2022-02-07 |
2022-038 |
14:30:00 |
Ops: Walkoff to MBS3, Mnvr to translate config - ROBO in FOV until 038-18:30 |
2022-02-05 |
2022-036 |
21:58:00 |
MPU7 SEU caused all MPU7 detectors to be offline. Recovered at 036-23:23. |
2022-02-04 |
2022-035 |
01:55:00 |
Thruster Disable for JEMRMS Ops (M22_035_A_03.UAF) |
2022-02-03 |
2022-034 |
15:00:00 |
Ops: MT Translate WS 7 to WS 2 - ROBO in FOV until 034-22:00 |
2022-02-03 |
2022-034 |
15:00:00 |
Thruster Disable SPDM BCDU MT WS7 to WS2 (M22_034_A_09.UAF) |
2022-02-03 |
2022-034 |
03:15:00 |
Thruster Disable for JEMRMS Ops (M22_034_B_07.UAF) |
2022-02-02 |
2022-033 |
18:00:00 |
Thruster Disable SPDM MT WS7 to WS2 (MT Translate Cancelled) (M22_033_A_05.UAF) |
2022-02-01 |
2022-032 |
18:00:00 |
Thruster Disable SPDM Ops (M22_032_A_08.UAF) |
2022-02-01 |
2022-032 |
07:30:00 |
SM Thruster Test (H22_032_B_03.UAF) |
2022-01-31 |
2022-031 |
18:00:00 |
Thruster Disable SPDM POA Inspection (M22_031_A_08.UAF) |
2022-01-31 |
2022-031 |
13:26:14 |
Updated EOP and reset GEONS clock bias |
2022-01-27 |
2022-027 |
15:40:00 |
X2R20 Day 3 GNC Transition to GNC R14 (M22_027_A_06.UAF) |
2022-01-26 |
2022-026 |
03:05:00 |
Thruster Disable JEMRMS Ops (M22_026_A_03.UAF) |
2022-01-24 |
2022-024 |
12:45:00 |
Thruster Disable for open hatch 79P (M22_024_B_03.UAF) |
2022-01-23 |
2022-023 |
15:05:00 |
Dragon Undocking (SpX-24 from N2Z) (M22_023_A_03.UAF) |
2022-01-20 |
2022-020 |
16:30:47 |
Pointed NICER starboard during SpX-24 Thruster Hot Fire Testing. Science plan was stopped at 22-020-16:30:47z and resumed at 22-020-17:36:48 |
2022-01-20 |
2022-020 |
01:25:00 |
Thruster Disable JEMRMS (M22_020_A_03.UAF) |
2022-01-19 |
2022-019 |
10:15:00 |
RS EVA 51 (H22_019_A_05.UAF) |
2022-01-18 |
2022-018 |
14:50:00 |
Thruster Disable MT Translate WS4 to WS7 (M22_018_A_05.UAF) |
2022-01-15 |
2022-015 |
16:00:00 |
Thruster Disable for 79P Hatch Closure (H22_015_B_05.UAF) |
2022-01-15 |
2022-015 |
00:30:00 |
Thruster Disable MT Translate WS3 to WS4 (M22_015_A_03.UAF) |
2022-01-14 |
2022-014 |
15:40:00 |
Ops: SPDM Stow, Triple Walkoff, MT translate 3 to 4. Impacts NICER FOV until 22-015-04:00 |
2022-01-12 |
2022-012 |
17:40:00 |
79P Reboost (H22_012_A_05.UAF) |
2022-01-12 |
2022-012 |
23:15:00 |
Thruster Disable JEMRMS (M22_012_B_07.UAF) |
2022-01-11 |
2022-011 |
12:10:00 |
Ops: SPX24 Day 3 STP-H7 Install. Impacts NICER FOV until 22-011-19:40 |
2022-01-11 |
2022-011 |
19:40:00 |
ROBO Parked for SPX24 Day 3 in our FOV. Impacts until 22-014-15:40 |
2022-01-10 |
2022-010 |
16:10:00 |
ROBO Parked for SPX24 Day 2 in our FOV. Impacts until 22-011-12:10 |
2022-01-10 |
2022-011 |
11:10:00 |
Thruster Disable SPDM Operations (M22_011_A_10.UAF) |
2022-01-10 |
2022-010 |
10:25:00 |
Ops: SPX24 Day 2 ASIM Transfer. Impacts NICER FOV until 22-010-16:10 |
2022-01-08 |
2022-008 |
09:00:00 |
ROBO Parked for ASIM Relocate in our FOV. Impacts until 22-010-10:25 |
2022-01-08 |
2022-008 |
08:00:00 |
Ops: ASIM Relocate Setup. Impacts NICER FOV until 09:00 |
2022-01-07 |
2022-007 |
15:40:00 |
Thruster Disable SPDM JEM RMS and MT Translate WS5 to WS3 (M22_007_A_06.UAF) |
2022-01-05 |
2022-005 |
14:55:00 |
Thruster Disable SPDM Ops and MT Translate WS7 to WS5 (M22_005_A_03.UAF) |
2021-12-30 |
2021-364 |
00:45:00 |
Thruster Disable MISSE Cont and MT Trans WS2 to WS7 |
2021-12-29 |
2021-363 |
03:49:17 |
Performed FSW Target Manager App update to version 2.0.0 at 21-363-03:49:17z to support future OHMAN ToOs. |
2021-12-28 |
2021-362 |
14:40:00 |
Thruster Disable SPDM MISSE Day3 |
2021-12-28 |
2021-362 |
13:05:00 |
Stowed NICER because of MISSE Ops Day 3. Configured for background measurements. Science resumed at 21-363-04:04:23 |
2021-12-27 |
2021-361 |
12:42:22 |
Stowed NICER because of MISSE Ops Day 2. Configured for background measurements. Science resumed at 21-362-06:26:33 |
2021-12-27 |
2021-361 |
14:40:00 |
Thruster Disable SPDM MISSE Day2 |
2021-12-26 |
2021-360 |
17:12:00 |
Thruster Disable SPDM MISSE Day1 |
2021-12-26 |
2021-360 |
12:45:13 |
Stowed NICER because of MISSE Ops Day 1. Configured for background measurements. Science resumed at 21-361-07:16:50. |
2021-12-24 |
2021-358 |
07:52:00 |
RS OPM to pXVV |
2021-12-24 |
2021-358 |
00:28:00 |
79P Deboost |
2021-12-22 |
2021-356 |
21:43:00 |
PAO Undocking |
2021-12-22 |
2021-356 |
06:54:00 |
Cargo Dragon Docking (SpX-24 to N2Z) |
2021-12-20 |
2021-354 |
14:03:50 |
Updated EOP and reset GEONS clock bias |
2021-12-19 |
2021-353 |
23:00:00 |
66S Undocking on CMG Control from MRM2 |
2021-12-17 |
2021-351 |
14:55:00 |
MT Translate WS4 to WS2 and SPDM |
2021-12-16 |
2021-350 |
03:15:00 |
CMG Maneuver to Stage TEA |
2021-12-16 |
2021-350 |
07:25:00 |
66S Thruster test |
2021-12-11 |
2021-345 |
20:40:00 |
Yaw Bias Maneuver |
2021-12-10 |
2021-344 |
15:10:00 |
MT Translate WS6 to WS4 |
2021-12-09 |
2021-343 |
14:30:00 |
MT Translate WS7 to WS6 and SPDM Ops |
2021-12-09 |
2021-343 |
00:57:00 |
RS OPM to pXVV |
2021-12-08 |
2021-342 |
13:12:00 |
66S Docking |
2021-12-08 |
2021-342 |
01:24:00 |
RS OPM to nXVV |
2021-12-06 |
2021-340 |
02:36:00 |
Thruster Disable JEMRMS Ops |
2021-12-03 |
2021-337 |
15:48:00 |
OPM to pXVV with Timeliner Profile 13 |
2021-12-03 |
2021-337 |
06:48:00 |
79P 180 Degree PDAM |
2021-12-02 |
2021-336 |
09:15:00 |
US EVA P1 SASA RnR |
2021-12-01 |
2021-335 |
15:58:26 |
Reset the star tracker to clear stuck imaging that started at 21-334-22:38:46 |
2021-11-28 |
2021-332 |
16:50:00 |
MT Translate WS5 to WS7 |
2021-11-27 |
2021-331 |
03:02:00 |
RS OPM to pXVV |
2021-11-26 |
2021-330 |
00:56:00 |
US OPM to nXVV with Timeliner Profile 6 |
2021-11-26 |
2021-330 |
14:52:00 |
6R Docking MLM with Reduced RS Master Time |
2021-11-25 |
2021-329 |
10:25:00 |
78P Undocking with USTO mnvrs |
2021-11-23 |
2021-327 |
22:42:00 |
Thruster Disable For SPDM |
2021-11-22 |
2021-326 |
15:30:00 |
Thruster Disable SPDM and MT Translate WS7 to WS5 |
2021-11-21 |
2021-325 |
22:10:00 |
Thruster Disable MT Translate WS5 to WS7 |
2021-11-20 |
2021-324 |
13:30:00 |
Cygnus16 Release |
2021-11-20 |
2021-324 |
11:55:00 |
Cygnus16 Unberth |
2021-11-18 |
2021-322 |
16:25:00 |
Thruster Disable MT Translate WS6 to WS5 |
2021-11-17 |
2021-321 |
14:30:00 |
MT Translate WS7 to WS6 STPH6 Disposal |
2021-11-16 |
2021-320 |
17:45:00 |
Thruster Disable MT Translate WS3 to WS7 |
2021-11-11 |
2021-315 |
22:00:00 |
Crew-3 Dragon Docking to N2F |
2021-11-10 |
2021-314 |
19:05:00 |
PDAM Aft Progress MLM Roll |
2021-11-09 |
2021-313 |
14:02:17 |
Updated EOP and reset GEONS clock bias |
2021-11-08 |
2021-312 |
18:40:00 |
Dragon Undocking - physical sep at 19:05:00 |
2021-11-04 |
2021-308 |
16:35:00 |
Desat Enable |
2021-11-03 |
2021-307 |
16:35:55 |
Stopped NICER science plan and pointed starboard for Crew-2 thruster fire test. Science plan resumed at 17:02:27 |
2021-11-03 |
2021-307 |
15:00:00 |
Crew-2 Thruster Test on US Control - thruster fire at 16:40 |
2021-10-29 |
2021-302 |
21:45:00 |
79P Docking Reduced RS Master Time to SM Aft |
2021-10-27 |
2021-300 |
07:00:00 |
MLM Thruster Test on RS Control |
2021-10-22 |
2021-295 |
00:55:00 |
78P Docking Reduced RS Master Time to MLM |
2021-10-20 |
2021-293 |
22:30:00 |
78P Undocking with USTO mnvrs |
2021-10-18 |
2021-291 |
04:42:00 |
78P Prop Purge in Momentum Management MRM2 |
2021-10-17 |
2021-290 |
00:40:00 |
64S Undocking |
2021-10-15 |
2021-288 |
08:45:00 |
SW Thruster Disable for 64S Thruster Test Part 2 - NICER viewed the CRAB during this time. Attitude may be off nominal due to anomaly described in next row. |
2021-10-15 |
2021-288 |
09:13:00 |
LoAC Response - High ISS attitude error leading to Loss of CMG Attitude Control and Loss of ISS Attitude Control\nAt 0913 we were in a declared LOAC that reached a max attitude of 58deg negative pitch @ 0924.\nADCO reported stationed returned to its correct attitude @ 0955.\nPOIC resumed normal operations @ 1007 with command enablement’s back in place by 1009.\nPossible SA obstructions until about 22:00 |
2021-10-13 |
2021-286 |
08:45:00 |
64S Thruster Test |
2021-10-13 |
2021-286 |
01:15:00 |
Thruster Disable for JEMRMS Ops |
2021-10-12 |
2021-285 |
01:05:00 |
Thruster Disable for JEMRMS Deploy |
2021-10-12 |
2021-285 |
06:18:00 |
SM Reboost |
2021-10-07 |
2021-280 |
01:57:00 |
Thruster Disable for JEMRMS Ops |
2021-10-07 |
2021-280 |
18:25:00 |
Thruster Disable MT Translate WS2 5 |
2021-10-05 |
2021-278 |
23:25:00 |
Thruster Disable for JEMRMS Ops |
2021-10-05 |
2021-278 |
11:03:00 |
65S Docking 2 orbit |
2021-10-04 |
2021-277 |
15:30:00 |
Thruster Disable SPDM Ops |
2021-10-04 |
2021-277 |
14:12:00 |
Updated EOP and reset GEONS clock bias |
2021-09-30 |
2021-273 |
18:20:00 |
Thruster Disable SPDM Ops |
2021-09-30 |
2021-273 |
17:20:00 |
RMCT2 Stow, Manvr to RELL Setup - ROBO arm may be in and out of NICER FOV until 273-22:20 |
2021-09-30 |
2021-273 |
12:24:00 |
Dragon Undocking (SpX-23 from N2F) |
2021-09-29 |
2021-272 |
13:52:00 |
Thruster Disable for 78P Clamp Install |
2021-09-29 |
2021-272 |
04:39:00 |
NICER team suspects ISS structure blockage for a minute around this time. |
2021-09-29 |
2021-272 |
02:26:00 |
OPM to pXXV with Timeliner Profile 13 |
2021-09-29 |
2021-272 |
22:45:00 |
Thruster Disable for JEMRMS Ops |
2021-09-28 |
2021-271 |
14:19:00 |
Thruster Disable for 64S Clamp Install |
2021-09-28 |
2021-271 |
11:20:00 |
64S Relocate with USTO Maneuvers - HOSC turned off power to NICER preheaters during this activity |
2021-09-27 |
2021-270 |
19:00:00 |
Thruster Disable for JEMRMS Ops |
2021-09-25 |
2021-268 |
13:19:00 |
64S Thruster Test on MM |
2021-09-24 |
2021-267 |
13:33:00 |
SM Deboost |
2021-09-24 |
2021-267 |
06:13:00 |
OPM to nXVV with Timeliner Profile 6 |
2021-09-23 |
2021-266 |
14:35:00 |
Thruster Disable for 78P Clamp Removal |
2021-09-23 |
2021-266 |
04:49:28 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-09-22 |
2021-265 |
18:47:03 |
NICER STOW for ROBO/MISSE Ops -background data collection |
2021-09-22 |
2021-265 |
05:23:15 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-09-22 |
2021-265 |
22:20:00 |
Thruster Disable for SPDM Ops |
2021-09-21 |
2021-264 |
22:10:00 |
Thruster Disable for SPDM Ops |
2021-09-21 |
2021-264 |
18:43:00 |
NICER STOW for ROBO/MISSE Ops -background data collection |
2021-09-20 |
2021-263 |
10:30:00 |
Dedicated Thruster Firing Test |
2021-09-20 |
2021-263 |
00:28:00 |
Thruster Disable for JEMRMS Ops SFA Unstow |
2021-09-20 |
2021-263 |
21:30:00 |
Thruster Disable for JEMRMS Ops EFU Transfer |
2021-09-17 |
2021-260 |
02:50:00 |
Thruster Disable MMOD Strike Survey |
2021-09-17 |
2021-260 |
19:30:00 |
Thruster Disable MT Translate WS7 to WS2 - ROBO arm may be in and out of NICER FOV until 261-00:00 |
2021-09-16 |
2021-259 |
23:12:00 |
NICER star tracker imaging stuck until ST reset commanded at 21-260-12:04:57 |
2021-09-14 |
2021-257 |
19:55:00 |
Thruster Disable ZCAM Stow and MT Translate WS5 to WS7 |
2021-09-13 |
2021-256 |
17:49:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-17:49 to 18:09 |
2021-09-13 |
2021-256 |
14:47:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-14:47 to 15:04 |
2021-09-12 |
2021-255 |
09:58:00 |
4A IROSA Prep EVA and 78P Hatch Open |
2021-09-11 |
2021-254 |
18:08:00 |
SM Reboost |
2021-09-11 |
2021-254 |
17:50:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-17:50 to 18:11 |
2021-09-11 |
2021-254 |
16:36:07 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-16:36 to 16:47 |
2021-09-10 |
2021-253 |
16:15:00 |
Thruster Disable ZCAM Extract and MT Translate WS7 WS5 |
2021-09-09 |
2021-252 |
16:18:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-252-16:18 to 16:46 |
2021-09-09 |
2021-252 |
13:15:00 |
RS EVA 50 |
2021-09-03 |
2021-246 |
12:50:00 |
RS EVA 49 |
2021-08-30 |
2021-242 |
12:55:00 |
Dragon Docking (SpX-23 to N2F) |
2021-08-27 |
2021-239 |
04:32:00 |
NICER star tracker imaging stuck until ST reset commanded at 12:02:07 |
2021-08-26 |
2021-238 |
19:45:00 |
MT Translate and SPDM Ops |
2021-08-26 |
2021-238 |
06:35:00 |
Thruster Disable for RS EVA 49 Prep |
2021-08-23 |
2021-235 |
22:33:46 |
Updated EOP and Reset GEONS Clock Bias |
2021-08-21 |
2021-233 |
13:34:00 |
Thruster Disable MT Translate WS7 WS5 and SPDM Operations |
2021-08-21 |
2021-233 |
03:14:00 |
SM Reboost |
2021-08-20 |
2021-232 |
16:30:00 |
Thruster Disable ZCAM Extract |
2021-08-16 |
2021-228 |
22:48:00 |
Thruster Disable MT Translate WS4 WS7 |
2021-08-12 |
2021-224 |
12:04:00 |
Cygnus16 Install |
2021-08-12 |
2021-224 |
08:05:00 |
Cygnus16 Capture (M21_224_A_03.UAF) |
2021-08-11 |
2021-223 |
16:22:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-16:22:14 to 21-223-21:32. After this 16:22 attempt, NICER was misconfigured (GCE motors at their soft stops), so targetting was not happening until 21:32 when it was corrected. |
2021-08-11 |
2021-223 |
11:42:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-11:43:06 to 11:59:41 |
2021-08-10 |
2021-222 |
12:27:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-12:28:03 to 12:54:16 |
2021-08-10 |
2021-222 |
21:47:27 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-21:47:27 to 22:05:43 |
2021-08-09 |
2021-221 |
13:36:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-221-13:13:10 to 13:38:03. |
2021-08-08 |
2021-220 |
09:46:06 |
MPU 5 powered off after AP#127(No data received) tripped during passage through SAA. MPU 5 recovery complete at 220-10:40:39 |
2021-08-06 |
2021-218 |
19:10:00 |
GMT218Thruster Disable MT Translate WS6 WS4 |
2021-07-30 |
2021-211 |
15:20:00 |
MLM Vent on RS Control |
2021-07-30 |
2021-211 |
03:00:00 |
OPM to pXVV with Timeliner Profile 13 |
2021-07-29 |
2021-210 |
11:05:00 |
MLM Docking with USTO Maneuver |
2021-07-29 |
2021-210 |
17:28:00 |
ISS back to planned attitude |
2021-07-29 |
2021-210 |
16:49:01 |
"-XVV +ZLV TEA" |
2021-07-29 |
2021-210 |
16:49:00 |
Recover on RS thrusters |
2021-07-29 |
2021-210 |
16:34:00 |
LoAC Contingency Response - High ISS attitude rates due to anomlous MLM thurster firings |
2021-07-28 |
2021-209 |
14:20:00 |
Thruster Disable MT Translate WS7 WS6 |
2021-07-26 |
2021-207 |
09:47:00 |
77P Undocking with DC-1 on RS control |
2021-07-22 |
2021-203 |
15:27:51 |
Updated EOP and Reset GEONS Clock Bias |
2021-07-22 |
2021-203 |
15:21:11 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to nominal detector config. |
2021-07-22 |
2021-203 |
07:30:00 |
OPM to nXVV with Timeliner Profile 1 |
2021-07-21 |
2021-202 |
10:10:00 |
Crew-2 Port Relocate N2F to N2Z |
2021-07-20 |
2021-201 |
09:40:00 |
Thruster Disable MT Translate WS4 to WS7 |
2021-07-20 |
2021-201 |
07:00:00 |
CMG Mnvr to Stage TEA |
2021-07-19 |
2021-200 |
21:34:44 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,1-5,1-6,1-7,2-1,2-3,2-4,2-5,2-6,2-7,2-8,3-2,3-4,3-5,3-6,3-7,3-8,4-1,4-2,4-3,4-5,4-6,4-7,4-8,5-1,5-2,5-3,5-4,5-5,5-6,5-7,6-1,6-2,6-3,6-4,6-5,6-6,6-7,7-2,7-3,7-4,7-5,7-6,7-7,7-8. |
2021-07-18 |
2021-199 |
16:41:00 |
OPM to pXVV with Timeliner Profile 7 |
2021-07-18 |
2021-199 |
14:30:00 |
CMG Mnvr to nXVV Stage TEA |
2021-07-18 |
2021-199 |
22:00:00 |
CMG Mnvr pXVV Yaw Bias |
2021-07-11 |
2021-192 |
09:00:00 |
CMG Mnvr nXVV Yaw Bias |
2021-07-11 |
2021-192 |
03:01:00 |
OPM to nXVV with Timeliner Profile 2 |
2021-07-10 |
2021-191 |
16:25:00 |
CMG Mnvr to Stage TEA |
2021-07-09 |
2021-190 |
15:18:00 |
CMG Mnvr pXVV Yaw Bias |
2021-07-08 |
2021-189 |
14:30:00 |
NICER commanded to joint target mode to look away from planned Dragin departure. NICER back on science targeting at 14:56:00 |
2021-07-08 |
2021-189 |
14:00:00 |
Dragon Undocking (SpX-22 from PMA-3) |
2021-07-08 |
2021-189 |
08:00:00 |
78P Zenith Progress Thruster Test |
2021-07-07 |
2021-188 |
08:50:00 |
78P Zenith Progress Thruster test |
2021-07-06 |
2021-187 |
14:57:00 |
NICER commanded to joint target mode to look away from planned Dragin departure. Departure delayed until DOY 189. NICER back on science targeting at 15:13:39 |
2021-07-06 |
2021-187 |
14:09:30 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,2-1,2-3,2-5,2-6,3-2,3-5,3-6,3-7,4-1,4-2,4-3,4-6,5-1,5-2,5-3,5-7,6-1,6-2,6-3,6-4,7-2,7-3,7-6,7-7. |
2021-07-02 |
2021-183 |
11:18:00 |
OPM to pXVV with Timeliner Profile 7 |
2021-07-02 |
2021-183 |
05:35:00 |
Mom Mgmt Mnvr to 78P post dock TEA |
2021-07-02 |
2021-183 |
03:20:00 |
Thruster Disable after 78P Docking Clamp Install |
2021-07-02 |
2021-183 |
01:02:16 |
78P Docking (M21_183_A_08.UAF) |
2021-07-01 |
2021-182 |
15:10:00 |
OPM to nXVV with Timeliner Profile 1 |
2021-06-30 |
2021-181 |
19:30:00 |
Thruster Disable for IPA Stow in Dragon |
2021-06-29 |
2021-180 |
11:56:00 |
Cygnus-15 Unberth (M21_180_A_03.UAF) |
2021-06-29 |
2021-180 |
16:25:00 |
Cygnus-15 Release (M21_180_B_03.UAF) |
2021-06-26 |
2021-177 |
13:55:00 |
Thruster Disable MT Trans and IPA Stow POA |
2021-06-25 |
2021-176 |
06:42:18 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6. |
2021-06-25 |
2021-176 |
04:01:58 |
NICER Safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-176-05:55:32 |
2021-06-25 |
2021-176 |
01:59:00 |
IROSA P6 EVA 3 |
2021-06-24 |
2021-174 |
23:16:30 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to enabling all nominal detectors |
2021-06-24 |
2021-174 |
01:35:00 |
77P Reboost |
2021-06-23 |
2021-174 |
01:55:00 |
Thruster Disable JEM RMS SSOD Xfer Day2 |
2021-06-22 |
2021-173 |
02:30:00 |
Thruster Disable JEM RMS SSOD Xfer Day1 |
2021-06-22 |
2021-173 |
17:15:27 |
Updated EOP and Reset GEONS Clock Bias. |
2021-06-22 |
2021-173 |
14:51:24 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6. |
2021-06-20 |
2021-171 |
02:55:00 |
IROSA P6 EVA 2 |
2021-06-16 |
2021-167 |
04:23:00 |
IROSA P6 EVA 1 |
2021-06-16 |
2021-167 |
14:05:23 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,2-1,2-3,3-2,3-4,4-1,4-2,5-1,5-2,6-1,6-2,7-2,7-3. |
2021-06-15 |
2021-166 |
01:25:00 |
Thruster Disable JEM RMS NRCSD Xfer Day2 |
2021-06-14 |
2021-165 |
20:57:20 |
Science plan modified detector config for TARGETID=5220 to 1-3,2-4,3-5,4-2,5-2,6-3,7-3 enabled |
2021-06-14 |
2021-165 |
15:08:58 |
Science plan modified detector config for TARGETID=5220 to that in use with RTS08 |
2021-06-14 |
2021-165 |
13:05:00 |
Thruster Disable for IPA Unstow MT Translate WS4 to WS8 |
2021-06-12 |
2021-163 |
22:55:32 |
Science plan modified detector config for TARGETID=5220 to 1-1,1-2,1-3,2-1,2-3,2-4,3-2,3-4,3-5,4-1,4-2,4-3,5-1,5-2,5-3,5-8,6-1,6-2,6-3,6-8,7-2,7-3,7-4,7-8 enabled |
2021-06-12 |
2021-163 |
04:15:00 |
Science plan modified detector config for TARGETID=5220 to that in use with RTS08 |
2021-06-11 |
2021-162 |
22:10:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-162-22:10- 21-163-02:10 |
2021-06-11 |
2021-162 |
19:40:00 |
Thruster Disable for IPA POA Install |
2021-06-10 |
2021-161 |
18:45:00 |
Thruster Disable for IPA Extract |
2021-06-08 |
2021-159 |
13:26:00 |
Thruster Disable for MT Translate WS2 to WS4 |
2021-06-07 |
2021-158 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-158-14:30 - 21-153-21:30 |
2021-06-07 |
2021-158 |
14:30:00 |
Thruster Disable for SPDM Stow |
2021-06-05 |
2021-156 |
07:24:00 |
Dragon Docking (SpX-22 to PMA-3) |
2021-06-02 |
2021-153 |
03:35:00 |
RS EVA 48 |
2021-05-28 |
2021-148 |
13:30:00 |
Thruster Disable RPCM R&R SPDM Ops |
2021-05-27 |
2021-147 |
18:25:00 |
Thruster Disable RMCT Unstow SPDM Ops |
2021-05-27 |
2021-147 |
13:50:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-147-18:25 - 21-147-23:35 |
2021-05-24 |
2021-144 |
18:45:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-144-18:45 - 21-144-22:00 |
2021-05-24 |
2021-144 |
17:46:00 |
Thruster Disable MT Translate WS4-2 |
2021-05-23 |
2021-143 |
00:00:00 |
Possible NICER FOV Obstruction due to ROBO activity, times unknown. |
2021-05-20 |
2021-140 |
16:10:00 |
77P Reboost (H21_140_A_03.UAF) |
2021-05-20 |
2021-140 |
14:15:00 |
CMG Maneuver to Stage TEA (M21_140_C_03.UAF) |
2021-05-19 |
2021-139 |
13:30:00 |
Updated EOP and Reset GEONS Clock Bias. |
2021-05-18 |
2021-138 |
00:20:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_138_A_03.UAF) |
2021-05-17 |
2021-137 |
14:10:00 |
NICER detector TECs commanded to max temp setpoints. Ops team had forgotten to do this after MISSE operations in April. TECs cooled to nominal setpoints from April 25th to today. |
2021-05-17 |
2021-137 |
00:21:00 |
NICER safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-137-13:51:15 |
2021-05-13 |
2021-133 |
21:30:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude |
2021-05-10 |
2021-130 |
23:50:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2021-05-07 |
2021-127 |
13:15:00 |
Reset star tracker after imaging got stuck a while ago |
2021-05-07 |
2021-127 |
19:52:00 |
Thruster Disable MAC MT Translate WS3-4 |
2021-05-04 |
2021-124 |
14:30:00 |
Thruster Disable MT Translate WS2-3 and SPDM Ops |
2021-05-03 |
2021-123 |
15:00:00 |
Thruster Disable MT Translate WS7-2 and SPDM Ops |
2021-05-03 |
2021-123 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-123-14:30 - 21-123-21:30 |
2021-05-02 |
2021-122 |
00:00:00 |
Dragon Undocking (Crew-1 from PMA-3) - physical sep at 00:35 |
2021-04-29 |
2021-119 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-119-14:30 - 21-119-20:30 |
2021-04-28 |
2021-118 |
13:23:00 |
Reset star tracker after imaging got stuck a while ago |
2021-04-27 |
2021-117 |
22:40:00 |
75P Undocking on CMG Control from SM Aft |
2021-04-26 |
2021-116 |
14:30:00 |
Thruster Disable for MISSE Stow |
2021-04-25 |
2021-115 |
09:03:38 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-25 |
2021-115 |
19:16:00 |
75P Prop Purge on CMG Attitude Hold |
2021-04-24 |
2021-114 |
13:05:34 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-24 |
2021-114 |
01:04:22 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-24 |
2021-114 |
07:35:00 |
Dragon Docking (Crew-2 to PMA-2) |
2021-04-24 |
2021-114 |
21:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-114-21:30 - 21-115-00:30 |
2021-04-24 |
2021-114 |
14:43:00 |
Software Thruster Disable MISSE Transfer MT WS2 to WS7 |
2021-04-23 |
2021-113 |
21:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-113-21:30 - 21-114-14:30 |
2021-04-23 |
2021-113 |
14:30:00 |
Software Thruster Disable MISSE Transfer Hinge Closure |
2021-04-23 |
2021-113 |
13:14:11 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-23 |
2021-113 |
01:03:06 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-22 |
2021-112 |
09:10:00 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-22 |
2021-112 |
14:30:00 |
Software Thruster Disable MTT Flip and MISSE Transfer |
2021-04-22 |
2021-112 |
13:04:05 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-21 |
2021-111 |
13:21:58 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-21 |
2021-111 |
06:30:00 |
Dedicated Thruster Firing Test (M21_111_B_03.UAF) |
2021-04-21 |
2021-111 |
14:30:00 |
Software Thruster Disable MISSE Transfer |
2021-04-20 |
2021-110 |
10:59:28 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-20 |
2021-110 |
05:15:22 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-20 |
2021-110 |
03:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-110-03:00 - 21-110-05:00 |
2021-04-19 |
2021-109 |
14:00:00 |
Software Thruster Disable MISSE Ops |
2021-04-19 |
2021-109 |
08:45:00 |
Thruster Disable for 75P hatch close |
2021-04-17 |
2021-107 |
01:30:00 |
63S Undocking on CMG Control from MRM2 |
2021-04-13 |
2021-103 |
17:00:00 |
Thruster Disable for MT Translate WS6 to WS4 |
2021-04-13 |
2021-103 |
09:00:00 |
Thruster Test 63S |
2021-04-12 |
2021-102 |
13:30:00 |
Thruster Disable for MT Translate WS2 to WS6 |
2021-04-09 |
2021-099 |
10:43:00 |
64S Docking 2 orbit |
2021-04-09 |
2021-099 |
13:53:00 |
Updated EOP and reset GEONS Clock Bias |
2021-04-07 |
2021-097 |
11:10:00 |
75P Clamp Install Thruster Disable |
2021-04-06 |
2021-096 |
21:55:00 |
Thruster Disable for JEMRMS Ops SFA Stow |
2021-04-05 |
2021-095 |
09:55:00 |
Crew-1 Port Relocate N2F to N2Z |
2021-04-02 |
2021-092 |
11:39:00 |
75P Reboost |
2021-03-31 |
2021-090 |
19:55:00 |
Thruster Disable for JEMRMS Ops EFU Transfer |
2021-03-27 |
2021-086 |
22:20:00 |
Thruster Disable for JEMRMS Ops EFU Transfer |
2021-03-25 |
2021-084 |
00:17:00 |
Thruster Disable for JEMRMS Ops SFA Unstow |
2021-03-23 |
2021-082 |
01:55:00 |
Thruster Disable for JEMRMS Ops |
2021-03-23 |
2021-083 |
17:00:00 |
Thruster Disable for MT Translate WS5 WS2 |
2021-03-23 |
2021-082 |
18:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-082-18:00 - 21-083-00:00 |
2021-03-22 |
2021-081 |
01:30:00 |
Thruster Disable for JEMRMS Ops |
2021-03-20 |
2021-079 |
03:46:00 |
RS OPM to pXVV |
2021-03-19 |
2021-078 |
02:52:00 |
RS OPM to nXVV |
2021-03-19 |
2021-078 |
16:03:00 |
63S Relocate MRM1 to MRM2 |
2021-03-16 |
2021-075 |
15:05:00 |
Thruster Disable 63S Thruster Test |
2021-03-15 |
2021-074 |
02:30:00 |
Thruster Disable for JEMRMS Ops |
2021-03-14 |
2021-073 |
05:03:00 |
Thruster Disable for JEMRMS Ops |
2021-03-13 |
2021-072 |
09:38:00 |
ISS Upgrades EVA 3.5 |
2021-03-12 |
2021-071 |
18:29:00 |
75P Reboost |
2021-03-11 |
2021-070 |
13:20:00 |
EP9 Jettison MCS Configuration |
2021-03-11 |
2021-070 |
01:30:00 |
Thruster Disable for SPDM Ops EP Unstow |
2021-03-10 |
2021-069 |
20:13:00 |
Thruster Disable for MT Translate WS7 to WS5 |
2021-03-05 |
2021-064 |
10:10:00 |
ISS Upgrades III EVA |
2021-03-05 |
2021-064 |
18:18:00 |
HOSC removed power to J3AB which is NICER's survival heater power circuit to support EVA for ISS power upgrades |
2021-03-02 |
2021-061 |
18:18:00 |
Updated EOP and reset GEONS Clock Bias |
2021-03-01 |
2021-060 |
18:30:00 |
Thruster Disable for SPDM (MT translate aborted) |
2021-02-28 |
2021-059 |
07:56:00 |
IROSA Prep EVA |
2021-02-27 |
2021-058 |
20:23:00 |
Thruster Disable for MT Translate WS3 to WS7 |
2021-02-22 |
2021-053 |
11:44:00 |
Cygnus15 Install (M21_053_A_03.UAF) |
2021-02-22 |
2021-053 |
09:40:00 |
Cygnus15 Capture (M21_052_A_07.UAF) |
2021-02-19 |
2021-050 |
15:06:00 |
Commanded TOO of the Crab for alignment checks |
2021-02-17 |
2021-048 |
06:20:00 |
77P Docking 34orbit (H21_048_A_07.UAF) |
2021-02-16 |
2021-047 |
16:58:00 |
Commanded all MPU TEC temperature setpoints to max setpoint |
2021-02-15 |
2021-046 |
21:30:00 |
CMG Maneuver to Stage TEA (M21_046_A_03.UAF) |
2021-02-12 |
2021-043 |
14:15:00 |
Commanded MPU4 detectors temp setpoints to nominal values |
2021-02-12 |
2021-043 |
11:45:00 |
Commanded MPU1 all detectors to nominal TEC temp setpoint |
2021-02-12 |
2021-043 |
09:06:00 |
Commanded MPU4 and MPU1 all detectors to max TEC temp setpoint |
2021-02-09 |
2021-040 |
07:30:00 |
HOSC ISS APS anomaly resulting in corrupt NICER data being sent to the SPOCC. Data outage lasts until the end of the DOY. Also, DOY 041 data was very ratty due to same anomaly. Data unrecoverable. |
2021-02-09 |
2021-040 |
04:20:00 |
76P departure maneauver to +ZVV 21-040-04:20:01 - 21-040-04:40:00, Undocking 21-040-05:18 - 21-040-05:22:10, maneuaver to +XVV 21-040-05:28:01 - 21-040-05:58:00 |
2021-02-09 |
2021-040 |
05:21:00 |
76P Undocking with USTO Mnvrs (M21_040_A_11.UAF) |
2021-02-09 |
2021-040 |
09:30:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_040_B_03.UAF) |
2021-02-02 |
2021-033 |
16:00:00 |
Thruster Disable MT Translate WS2 toWS3 (M21_033_A_07.UAF) |
2021-02-02 |
2021-033 |
14:20:00 |
MPU 4-5 detector annealing completed |
2021-02-01 |
2021-032 |
16:08:00 |
Updated EOP and reset GEONS Clock Bias |
2021-02-01 |
2021-032 |
09:25:00 |
ISS Upgrades II EVA (M21_032_A_05.UAF) |
2021-01-31 |
2021-031 |
08:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-031-08:30 - 21-031-18:30 |
2021-01-31 |
2021-031 |
06:15:00 |
Thruster Disable for SPDM and MT Translate WS7 to WS2 (M21_031_A_09.UAF) |
2021-01-30 |
2021-030 |
10:55:00 |
Thruster Disable for SPDM 4A3 Robotics (M21_030_A_05.UAF) |
2021-01-29 |
2021-029 |
16:40:00 |
Thruster Disable for SPDM and MT Translate WS2 to WS7 (M21_029_A_07.UAF) |
2021-01-29 |
2021-029 |
16:25:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-029-16:25 - 21-030-02:40 |
2021-01-28 |
2021-028 |
14:40:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-028-14:30 - 21-029-02:30 |
2021-01-28 |
2021-028 |
22:30:00 |
Thruster Disable for MT Translate WS3 to WS2 (M21_028_A_07.UAF) |
2021-01-27 |
2021-027 |
10:06:00 |
COL Upgrades EVA (M21_027_A_05.UAF) |
2021-01-26 |
2021-026 |
14:22:00 |
MPU 4-5 detector annealing started |
2021-01-21 |
2021-021 |
15:25:00 |
75P Reboost (H21_021_A_07.UAF) |
2021-01-21 |
2021-021 |
02:45:00 |
Thruster Disable for JEMRMS Ops (M21_021_C_05.UAF) |
2021-01-19 |
2021-019 |
23:00:00 |
Thruster Disable for JEMRMS Ops (M21_019_B_03.UAF) |
2021-01-18 |
2021-018 |
14:15:00 |
Thruster Disable for MT Translate WS2 to WS3 (M21_018_A_03.UAF) |
2021-01-12 |
2021-012 |
22:00:00 |
Thruster Disable for JEMRMS Ops (M21_012_A_07.UAF) |
2021-01-12 |
2021-012 |
13:40:00 |
Dragon Undocking (SpX-21 to PMA-3) (M21_012_B_02.UAF) |
2021-01-11 |
2021-011 |
13:55:00 |
Aborted SpaceX-21 Undocking (M21_011_B_02.UAF) |
2021-01-10 |
2021-010 |
14:15:00 |
Dragon Thruster Test on RS control (SpX-21 to PMA-3) (M21_010_A_03.UAF) |
2021-01-08 |
2021-008 |
18:10:00 |
Thruster Disable for MT Translate WS5 to WS2 (M21_008_A_05.UAF) |
2021-01-08 |
2021-008 |
14:40:00 |
Possible NICER FOV Obstruction due to SpaceX-21 undock setup 21-008-14:30 - 21-008-23:05 |
2021-01-06 |
2021-006 |
15:10:00 |
Cygnus-14 Release (M21_006_B_03.UAF) |
2021-01-06 |
2021-006 |
10:48:00 |
Cygnus-14 Unberth (M21_006_A_03.UAF) |
2021-01-05 |
2021-005 |
18:54:00 |
Observed the crab for calibration purposes. Modified PC parameters table to adjust the star tracker to instrument boresight alignment matrix |
2020-12-29 |
2020-364 |
20:02:00 |
75P Hatch Open/Close Thruster Disable |
2020-12-28 |
2020-363 |
23:00:00 |
Thruster Disable for JEMRMS Ops |
2020-12-28 |
2020-363 |
02:46:55 |
NICER MPU 4 anomalous power off while in SAA |
2020-12-26 |
2020-361 |
19:24:00 |
75P Hatch Closure Thruster Disable |
2020-12-23 |
2020-358 |
18:00:00 |
NICER activated and redeployed. Science resumed at 22:30:19 |
2020-12-19 |
2020-354 |
22:35:00 |
GMT354 Nanoracks Airlock Extraction and Install |
2020-12-19 |
2020-354 |
18:36:00 |
CMG Maneuver to Stage TEA |
2020-12-19 |
2020-354 |
04:15:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2020-12-18 |
2020-352 |
00:36:47 |
NICER activation after ISS circuit 4B recovery, but immediately powered off when SPARTAN reported issues still with circuit 4B. |
2020-12-13 |
2020-348 |
23:00:00 |
Thruster Disable for JEMRMS Ops |
2020-12-13 |
2020-348 |
17:25:00 |
NICER activated, stowed and deactivated via ISS power circuit 4A until circuit 4B anomaly can be figured out |
2020-12-12 |
2020-347 |
09:40:00 |
ISS 4B power circuit failure on the ISS which powered off NICER |
2020-12-11 |
2020-346 |
05:10:00 |
CMG Maneuver to High Beta Yaw Bias Attitude |
2020-12-10 |
2020-345 |
02:35:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2020-12-09 |
2020-344 |
14:35:00 |
Thruster Disable for MT Trans WS7 to WS5 |
2020-12-08 |
2020-343 |
19:20:00 |
Thruster Disable for SPDM |
2020-12-07 |
2020-342 |
19:49:00 |
MPU 4-5 detector annealing completed |
2020-12-07 |
2020-342 |
17:43:00 |
Stopped science plan and pointed NICER starboard to avoid any contamination that could come from the docking Dragon thruster plumes. Science plan resumed at 18:45:12 |
2020-12-07 |
2020-342 |
16:55:00 |
Dragon Docking (SpX-21 to PMA-3) |
2020-12-07 |
2020-342 |
19:53:00 |
MPU 2-7 detector annealing started |
2020-12-04 |
2020-339 |
09:12:00 |
63S Thruster test |
2020-12-03 |
2020-338 |
17:01:00 |
Updated GPS GEONS EOP and reset |
2020-12-03 |
2020-338 |
00:55:00 |
Thruster Disable for JEMRMS Ops |
2020-11-29 |
2020-334 |
16:00:00 |
Thruster Disable for MISSE Ops Day5 |
2020-11-28 |
2020-333 |
02:54:45 |
NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed |
2020-11-27 |
2020-332 |
15:30:00 |
Thruster Disable for MISSE Ops Day4 |
2020-11-27 |
2020-332 |
14:06:48 |
NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed |
2020-11-26 |
2020-331 |
07:12:01 |
NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed |
2020-11-25 |
2020-330 |
00:10:13 |
NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed |
2020-11-24 |
2020-329 |
18:35:00 |
Thruster Disable for MISSE Ops Day1-3 |
2020-11-23 |
2020-328 |
11:12:00 |
Thruster Disable for 75P Clamp Install and Hatch Open |
2020-11-23 |
2020-328 |
16:42:00 |
MPU 4-5 detector annealing started |
2020-11-23 |
2020-328 |
16:39:00 |
MPU 2-8 detector annealing completed |
2020-11-21 |
2020-326 |
07:49:34 |
NICER processor reset based on exception in task tXbdServiceat. SEU in SAA. Science resumed at 326-10:28:06 |
2020-11-19 |
2020-324 |
21:03:00 |
Thruster Disable for MISSE Ops Setup |
2020-11-18 |
2020-323 |
12:45:00 |
Russian EVA 47 |
2020-11-16 |
2020-321 |
14:24:00 |
MPU 2-8 detector annealing started |
2020-11-16 |
2020-321 |
14:24:00 |
MPU 1-1 detector annealing completed |
2020-11-16 |
2020-321 |
14:17:00 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-11-16 |
2020-321 |
02:25:00 |
Dragon Docking (Crew-1 to PMA-2) |
2020-11-12 |
2020-317 |
18:45:00 |
75P Reboost |
2020-11-10 |
2020-315 |
16:12:00 |
Updated GPS GEONS EOP and reset |
2020-11-09 |
2020-314 |
17:15:00 |
63S Thruster Test on MM |
2020-11-09 |
2020-314 |
16:28:00 |
MPU 1-1 detector annealing started |
2020-11-09 |
2020-314 |
16:24:00 |
MPU 1-2 detector annealing completed |
2020-11-07 |
2020-312 |
03:52:02 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-11-06 |
2020-311 |
01:50:00 |
Thruster Disable JEMRMS NRCSD Stow |
2020-11-05 |
2020-310 |
01:01:00 |
Thruster Disable JEMRMS NRCSD Deploy |
2020-11-04 |
2020-309 |
00:25:00 |
Thruster Disable JEM RMS SFA Stow |
2020-11-02 |
2020-307 |
13:49:00 |
MPU 1-2 detector annealing started |
2020-11-02 |
2020-307 |
13:47:00 |
MPU 1-3 detector annealing completed |
2020-10-30 |
2020-304 |
12:49:00 |
NICER Safe Mode due to GCE Overcurrent trip, near SAA |
2020-10-30 |
2020-304 |
01:35:00 |
Thruster Disable JEM RMS HXP Transfer |
2020-10-27 |
2020-301 |
21:55:00 |
Thruster Disable for SPDM Checkout |
2020-10-26 |
2020-300 |
14:29:00 |
MPU 1-3 detector annealing started |
2020-10-26 |
2020-300 |
14:27:00 |
MPU 1-4 detector annealing completed |
2020-10-22 |
2020-296 |
03:35:00 |
63S Thruster Test on MM |
2020-10-22 |
2020-296 |
07:30:00 |
SPDM Ops RRM Day3 and JEM RMS Ops |
2020-10-21 |
2020-295 |
23:32:00 |
62S Undocking on US Control |
2020-10-20 |
2020-294 |
13:55:00 |
SPDM Ops RRM Day2 |
2020-10-19 |
2020-293 |
00:25:00 |
Thruster Disable for JEM RMS SFA Unstow |
2020-10-19 |
2020-293 |
14:40:00 |
SPDM Ops RRM Day1 |
2020-10-19 |
2020-293 |
16:55:00 |
MPU 1-4 detector annealing started |
2020-10-19 |
2020-293 |
16:47:00 |
MPU 1-5 detector annealing completed |
2020-10-17 |
2020-291 |
07:45:00 |
62S Thruster test |
2020-10-15 |
2020-289 |
02:35:00 |
NICER Safe Mode due to GCE Overcurrent trip, near SAA |
2020-10-14 |
2020-288 |
08:52:27 |
63S Docking with Reduced RS Master Timeline |
2020-10-12 |
2020-286 |
15:46:00 |
MPU 1-5 detector annealing started |
2020-10-12 |
2020-286 |
15:45:00 |
MPU 1-6 detector annealing completed |
2020-10-08 |
2020-282 |
03:40:00 |
MT Translate WS3 to WS7 |
2020-10-07 |
2020-281 |
11:02:00 |
OPM to pXVV with Timeliner Profile 7 |
2020-10-07 |
2020-281 |
08:26:00 |
75P Deboost |
2020-10-06 |
2020-280 |
21:05:00 |
OPM to nXVV with Timeliner Profile 2 |
2020-10-05 |
2020-279 |
11:08:00 |
Cygnus-14 Install |
2020-10-05 |
2020-279 |
09:20:00 |
Cygnus-14 Capture |
2020-10-05 |
2020-279 |
16:12:00 |
MPU 1-6 detector annealing started |
2020-10-05 |
2020-279 |
16:08:00 |
MPU 1-7 detector annealing completed |
2020-10-02 |
2020-275 |
14:31:00 |
Updated GPS GEONS EOP and reset |
2020-10-01 |
2020-275 |
13:40:00 |
Thruster Disable for 75P Hatch Closing |
2020-09-28 |
2020-272 |
13:58:00 |
MPU 1-7 detector annealing started |
2020-09-28 |
2020-272 |
13:49:00 |
MPU 1-8 detector annealing completed |
2020-09-22 |
2020-266 |
21:19:00 |
PDAM Aft Progress Prog Roll |
2020-09-21 |
2020-265 |
17:40:00 |
MT Translate WS5 to WS3 |
2020-09-21 |
2020-265 |
16:12:00 |
MPU 1-8 detector annealing started |
2020-09-21 |
2020-265 |
16:03:00 |
MPU 5-5 detector annealing completed |
2020-09-18 |
2020-262 |
18:42:00 |
MT Translate WS2 to WS5 |
2020-09-18 |
2020-262 |
13:15:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-262-13:15 - 20-262-20:40 |
2020-09-16 |
2020-260 |
15:02:00 |
SPDM Ops RELL Install |
2020-09-14 |
2020-258 |
16:38:00 |
MPU 5-5 detector annealing started |
2020-09-14 |
2020-258 |
16:28:00 |
MPU 5-6 detector annealing completed |
2020-09-14 |
2020-258 |
14:40:00 |
SPDM Ops RELL Unstow |
2020-09-11 |
2020-255 |
16:20:00 |
Thruster Disable for SPDM MISSE Cleanup |
2020-09-11 |
2020-255 |
14:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-255-14:00 - 20-255-23:50 |
2020-09-10 |
2020-254 |
19:46:00 |
75P Reboost |
2020-09-04 |
2020-248 |
20:26:00 |
MPU 5-6 detector annealing started |
2020-09-04 |
2020-248 |
01:45:00 |
Thruster Disable for JEMRMS NREP Transfer |
2020-09-03 |
2020-247 |
13:55:00 |
Thruster Disable for SPDM MISSE Ops Day 3 |
2020-09-03 |
2020-247 |
21:36:00 |
NICER Deploy post-SPDM MISSE Ops Day 3 - Science Resumed |
2020-09-03 |
2020-247 |
21:49:00 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-09-02 |
2020-247 |
12:17:00 |
NICER Stow for SPDM MISSE Ops Day 3 - Detectors being annealed |
2020-09-02 |
2020-246 |
23:53:00 |
NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed |
2020-09-02 |
2020-246 |
13:55:00 |
Thruster Disable for SPDM MISSE Ops Day 2 |
2020-09-02 |
2020-246 |
12:29:00 |
NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed |
2020-09-01 |
2020-245 |
22:43:00 |
NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed |
2020-09-01 |
2020-245 |
22:28:00 |
Updated GPS GEONS EOP and reset |
2020-09-01 |
2020-245 |
14:40:00 |
Thruster Disable for SPDM MISSE Ops Day 1 |
2020-09-01 |
2020-245 |
12:23:00 |
NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed |
2020-09-01 |
2020-245 |
03:30:00 |
Thruster Disable for JEMRMS NREP Transfer |
2020-08-28 |
2020-241 |
15:15:00 |
MPU 5-8 detector annealing completed |
2020-08-28 |
2020-241 |
15:31:00 |
MPU 5-7 detector annealing started |
2020-08-24 |
2020-237 |
14:00:00 |
MT Translate WS5 to WS2 and SPDM Unstow RMCT2 |
2020-08-21 |
2020-234 |
14:40:00 |
MPU 5-8 detector annealing started |
2020-08-21 |
2020-234 |
14:30:00 |
MPU 5-1 detector annealing completed |
2020-08-21 |
2020-234 |
13:25:00 |
MT Translate WS3 to WS5 |
2020-08-18 |
2020-231 |
13:00:00 |
HTV9 Unberth |
2020-08-18 |
2020-231 |
14:25:00 |
HTV9 Release |
2020-08-14 |
2020-227 |
14:57:00 |
MPU 5-4 detector annealing completed |
2020-08-14 |
2020-227 |
15:02:00 |
MPU 5-1 detector annealing started |
2020-08-07 |
2020-220 |
13:25:00 |
MPU 5-4 detector annealing started |
2020-08-07 |
2020-220 |
12:34:00 |
MPU 5-2 detector annealing completed |
2020-08-06 |
2020-219 |
13:21:00 |
Modified RTS 241 to include disabling detectors 4-5 and 5-4 at low sun angles |
2020-08-04 |
2020-217 |
14:23:00 |
Modified RTS 243 to disable detector 5-4 at low sun angles |
2020-08-01 |
2020-214 |
23:00:00 |
Dragon Undocking |
2020-07-31 |
2020-213 |
20:19:00 |
MPU 5-2 detector annealing started |
2020-07-31 |
2020-213 |
19:14:00 |
MPU 5-3 detector annealing complete |
2020-07-31 |
2020-213 |
00:55:00 |
Thruster Disable for JEM RMS SA Stow |
2020-07-30 |
2020-211 |
17:30:00 |
Thruster Disbale for MT Translate WS5 to WS3 |
2020-07-29 |
2020-211 |
12:36:00 |
75P Reboost |
2020-07-29 |
2020-211 |
01:10:00 |
Thruster Disable for JEM RMS SFA |
2020-07-29 |
2020-211 |
23:05:00 |
Thruster Disable for JEM RMS HXP Transfer |
2020-07-27 |
2020-209 |
16:30:00 |
MPU 5-3 detector annealing started |
2020-07-27 |
2020-209 |
12:57:00 |
MPU 5-4 detector annealing completed |
2020-07-24 |
2020-206 |
05:36:00 |
OPM to +XVV with Timeliner Profile 9 |
2020-07-23 |
2020-205 |
20:29:00 |
MPU 5-4 detector annealing started |
2020-07-23 |
2020-205 |
17:47:52 |
76P Docking 2 orbit with Reduced RS Master Timeline |
2020-07-23 |
2020-205 |
17:22:00 |
MPU 5-4 detector annealing completed |
2020-07-23 |
2020-205 |
06:22:00 |
OPM to -XVV with Timeliner Profile 5 |
2020-07-22 |
2020-204 |
14:10:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-204-14:10 - 20-204-17:10 |
2020-07-22 |
2020-204 |
14:10:00 |
Thruster Disable for SSRMS and MT Translate WS1 to WS5 |
2020-07-22 |
2020-204 |
17:21:00 |
MPU 5-4 detector annealing started |
2020-07-21 |
2020-203 |
04:00:00 |
CMG Maneuver to Stage TEA |
2020-07-21 |
2020-203 |
09:45:00 |
S6 EVA 3B 2 |
2020-07-20 |
2020-202 |
14:37:00 |
MPU 5-4 detector was misbehaving at low SUn anlges. Turned it off a few times. Updated RTS 243 to disable MPU 5-4 at low sun angles |
2020-07-18 |
2020-200 |
12:45:00 |
CMG Maneuver to mid-Beta Yam Bias Attitude |
2020-07-16 |
2020-198 |
09:45:00 |
S6 Battery EVA 3B 1 |
2020-07-14 |
2020-196 |
03:25:00 |
Thruster Disable for NRCSD Day 2 |
2020-07-13 |
2020-195 |
08:00:00 |
Thruster Disable for NRCSD Day 1 |
2020-07-13 |
2020-195 |
04:10:00 |
CMG Manuever to high-Beta Yaw Bias Attitude |
2020-07-12 |
2020-194 |
04:21:00 |
CMG Manuever to mid-Beta Yaw Bias Attitude |
2020-07-12 |
2020-194 |
02:01:00 |
OPM to +XVV with Timeliner Profile 10 |
2020-07-11 |
2020-193 |
06:55:00 |
CMG Maneuver to Stage TEA |
2020-07-11 |
2020-193 |
08:58:00 |
OPM to -XVV with Timeliner Profile 5 |
2020-07-11 |
2020-193 |
18:25:00 |
75P Deboost |
2020-07-10 |
2020-192 |
19:00:00 |
CMG Manuever to mid-Beta Yaw Bias Attitude |
2020-07-10 |
2020-192 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-192-14:30 - 20-192-18:00 |
2020-07-10 |
2020-192 |
12:30:00 |
RPCM P32B A MT Translate WS5 to WS1 and SPDM Ops |
2020-07-08 |
2020-190 |
21:00:00 |
RPCM P32B A R&R MT Translate WS7 to WS5 |
2020-07-08 |
2020-190 |
18:23:30 |
74P Undocking with USTO Mnvrs (+XVV) |
2020-07-07 |
2020-189 |
16:00:00 |
Thruster Disable for 74P Clamp Removal and SPDM Ops |
2020-07-06 |
2020-188 |
23:13:00 |
Thruster Disable MT Translate WS5 to WS7 |
2020-07-06 |
2020-188 |
14:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-188-14:00 - 20-188-17:00 |
2020-07-06 |
2020-188 |
13:54:00 |
Thruster Disable MT Translate WS1 to WS5 |
2020-07-03 |
2020-185 |
14:35:00 |
PDAM - 75P Aft Progress- Prog Roll |
2020-07-01 |
2020-183 |
09:20:00 |
S6 Battery EVA 1B 2 |
2020-06-26 |
2020-178 |
09:45:00 |
S6 Battery EVA 1B 1 |
2020-06-24 |
2020-176 |
14:03:00 |
MT Translate WS5 to WS1 and EP Unstow |
2020-06-24 |
2020-176 |
15:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-176-15:00 - 20-176-19:30 |
2020-06-23 |
2020-175 |
16:00:00 |
Thruster Disable for SPDM Red Eye Deploy with MT Translate WS7 to WS5 |
2020-06-22 |
2020-174 |
18:40:00 |
Thruster Disable for SPDM Ops |
2020-06-17 |
2020-169 |
13:25:00 |
Thruster Disable for SPDM Red Eye Deploy |
2020-06-12 |
2020-164 |
00:55:00 |
Thruster Disable for JEMRMS Ops |
2020-06-11 |
2020-163 |
02:20:00 |
Thruster Disable for JEMRMS Ops |
2020-06-08 |
2020-160 |
18:52:00 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-06-04 |
2020-156 |
18:40:00 |
SPDM Battery Bolt Ops Day 1 |
2020-06-03 |
2020-155 |
21:10:00 |
MT Translate WS5 to WS7 |
2020-06-02 |
2020-154 |
23:55:00 |
Thruster Disable for EFU Adapter Transfer |
2020-06-01 |
2020-153 |
20:40:00 |
EP Swap Day 2 and SFA Unstow |
2020-05-31 |
2020-152 |
14:29:56 |
Dragon Docking to PMA2 |
2020-05-31 |
2020-152 |
18:24:00 |
MT Translate WS7 to WS5 and EP Swap Day 1 |
2020-05-26 |
2020-147 |
00:35:00 |
Thruster Disable for JEMRMS Ops |
2020-05-25 |
2020-146 |
17:32:00 |
MT Translate WS5 to WS7 |
2020-05-25 |
2020-146 |
14:09:00 |
HTV9 Install |
2020-05-25 |
2020-146 |
12:15:00 |
HTV9 Capture |
2020-05-21 |
2020-142 |
23:00:00 |
CMG Maneuver to Stage TEA |
2020-05-18 |
2020-139 |
20:55:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-14 |
2020-135 |
19:14:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-11 |
2020-132 |
21:20:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-11 |
2020-132 |
15:15:00 |
Cygnus 13 Release |
2020-05-11 |
2020-132 |
11:45:00 |
Cygnus 13 Unberth |
2020-05-08 |
2020-129 |
14:10:00 |
MT Translate WS6 to WS5 |
2020-05-08 |
2020-129 |
02:10:00 |
Thruster Disable for JEMRMS Ops |
2020-05-07 |
2020-128 |
14:35:00 |
HDEV Transfer to NG13 |
2020-05-06 |
2020-127 |
21:03:32 |
NICER Safe mode due to invalid GPS signals (Science downtime from 20-127-21:03:32 - 21:27:37. |
2020-05-05 |
2020-126 |
22:03:00 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-05-05 |
2020-126 |
14:25:00 |
MT Translate WS3 to WS6 |
2020-04-29 |
2020-120 |
01:20:00 |
Thruster Disable for JEMRMS JSSOD Deploy |
2020-04-28 |
2020-119 |
02:20:00 |
Thruster Disable for JEMRMS JSSOD Deploy |
2020-04-25 |
2020-116 |
16:10:00 |
OPM to +XVV with Timeliner Profile 7 |
2020-04-25 |
2020-116 |
06:40:00 |
Thruster Disable for 75P Clamp Install |
2020-04-25 |
2020-116 |
04:46:00 |
75P Docking 2 orbit |
2020-04-24 |
2020-115 |
20:00:39 |
OPM to -XVV with Timeliner Profile 2 |
2020-04-19 |
2020-110 |
04:10:00 |
-XVV SM Deboost |
2020-04-19 |
2020-110 |
04:55:00 |
NICER Safe mode due to invalid GPS signals (Science downtime from 20-110-04:55 - 05:24. |
2020-04-19 |
2020-110 |
08:18:00 |
OPM to +XVV with Timeliner Profile 7 |
2020-04-18 |
2020-109 |
18:20:00 |
OPM to -XVV with Timeliner Profile 2 |
2020-04-17 |
2020-108 |
01:23:00 |
61S Undocking on CMG Control from SM Aft (physical sep at 01:53:30) |
2020-04-10 |
2020-101 |
01:00:00 |
US OPM to +XVV with Profile 7 |
2020-04-09 |
2020-100 |
12:11:00 |
62S Docking MRM2 |
2020-04-09 |
2020-100 |
03:18:00 |
US OPM to -XVV with Profile 1 |
2020-04-07 |
2020-098 |
11:23:00 |
SpaceX-20 Release (Release at 13:05:00) |
2020-04-07 |
2020-098 |
09:35:00 |
SpaceX-20 Unberth |
2020-04-02 |
2020-093 |
11:50:00 |
74P Reboost |
2020-04-01 |
2020-092 |
19:55:00 |
Thruster Disable SPDM Ops (Bart Install) |
2020-03-31 |
2020-091 |
14:35:00 |
Thruster Disable SPDM and MT Translate WS6 to WS3 (Bart Setup and Fit Check) |
2020-03-25 |
2020-085 |
12:45:28 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-03-24 |
2020-084 |
20:30:00 |
Thruster Disable for Bart Extract |
2020-03-23 |
2020-083 |
14:40:00 |
Thruster Disable for MISSE Cleanup |
2020-03-20 |
2020-080 |
22:10:00 |
MT Translate WS2 to WS6 MTT Install |
2020-03-20 |
2020-080 |
06:02:12 |
Background Data Collection ended for re-deploy |
2020-03-20 |
2020-080 |
06:42:36 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #4 |
2020-03-19 |
2020-079 |
05:36:28 |
Background Data Collection ended for re-deploy |
2020-03-19 |
2020-079 |
19:02:25 |
NICER stowed for Day #4 of MISSE ROBO Ops |
2020-03-19 |
2020-079 |
16:24:00 |
74P Reboost |
2020-03-19 |
2020-079 |
06:14:37 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #3 |
2020-03-19 |
2020-079 |
19:34:36 |
Background Data Collection started |
2020-03-19 |
2020-079 |
20:25:00 |
Thruster Disable for MSC Transfers |
2020-03-18 |
2020-078 |
13:55:00 |
Thruster Disable for MSC transfers |
2020-03-18 |
2020-078 |
13:36:23 |
Background Data Collection started |
2020-03-18 |
2020-078 |
13:07:35 |
Stowed NICER for MISSE ROBO Ops Day #3 |
2020-03-18 |
2020-078 |
06:36:13 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #2 |
2020-03-18 |
2020-078 |
05:54:50 |
Background Data Collection ended for re-deploy |
2020-03-17 |
2020-077 |
13:55:00 |
Thruster Disable for MSC transfers |
2020-03-17 |
2020-077 |
13:20:57 |
Background Data Collection started |
2020-03-17 |
2020-077 |
12:37:40 |
NICER stowed for Day #2 of MISSE ROBO Ops |
2020-03-17 |
2020-077 |
06:51:47 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #1 |
2020-03-17 |
2020-077 |
06:12:04 |
Background Data Collection ended for re-deploy |
2020-03-16 |
2020-076 |
13:13:03 |
Background Data Collection started |
2020-03-16 |
2020-076 |
12:35:01 |
Stowed NICER for MISSE ROBO Ops |
2020-03-16 |
2020-076 |
13:50:00 |
Thruster Disable for MSC transfers |
2020-03-13 |
2020-073 |
18:30:00 |
Thruster Disable for MISSE reconfig MT Translate |
2020-03-12 |
2020-072 |
23:00:00 |
Thruster Disable for MTT Extract |
2020-03-11 |
2020-071 |
22:31:00 |
Thruster disable for MISSE Setup |
2020-03-09 |
2020-069 |
11:00:00 |
SpaceX-20 Capture and Install |
2020-03-06 |
2020-066 |
06:50:57 |
NICER safe mode due to invalid GPS signals. Science was resumed at 2020-066-07:28:40. |
2020-03-04 |
2020-064 |
06:46:16 |
NICER safe mode due to invalid GPS signals. Science was resumed at 2020-064-12:56:54. |
2020-02-21 |
2020-052 |
14:30:00 |
ICS Jettison Robotics |
2020-02-21 |
2020-052 |
01:50:00 |
JEMRMS Ops ICS Transfer |
2020-02-20 |
2020-051 |
00:59:00 |
NRCSD to JEM AL |
2020-02-19 |
2020-050 |
00:10:00 |
NRCSD to Deploy |
2020-02-18 |
2020-049 |
17:00:00 |
Noticed on ISS camera feed that there is some peeling of the silver teflon on the Star tracker baffle. Looking through archival off ISS photos it looks like this began sometime between Feb and May 2019. |
2020-02-18 |
2020-049 |
09:05:00 |
Cygnus 13 Capture and Install |
2020-02-13 |
2020-044 |
14:31:55 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-02-06 |
2020-037 |
05:50:30 |
59S Undocking on CMG Control from MRM2 |
2020-02-03 |
2020-034 |
16:25:00 |
NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings. 16:25:25 - 16:57:35 and 17:59:17 - 18:16:11 and 19:30:21 - 19:50:25 and 21:06:01 - 21:23:20 |
2020-02-03 |
2020-034 |
14:45:00 |
SPDM Ops and Double MT Translate 4-6-7 |
2020-02-03 |
2020-034 |
12:20:00 |
59S Thruster Test on MM |
2020-01-31 |
2020-031 |
20:50:00 |
MT Translate WS6 - 4 |
2020-01-31 |
2020-031 |
18:48:06 |
NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings. 18:48:06 - 19:05:13 and 20:19:16 - 20:34:49. |
2020-01-31 |
2020-031 |
13:00:00 |
Cygnus NG-12 Release (Release at 14:35) |
2020-01-31 |
2020-031 |
10:20:00 |
Cygnus NG-12 Unberth |
2020-01-30 |
2020-030 |
23:25:00 |
SFA Stow |
2020-01-30 |
2020-030 |
00:58:00 |
Cyclops Install to JEM AL |
2020-01-28 |
2020-028 |
01:22:00 |
SFA Extract |
2020-01-28 |
2020-028 |
22:45:00 |
Cyclops Deploy Maneuver and STPSat4 Deploy |
2020-01-27 |
2020-027 |
16:00:00 |
MT Translate WS2 - 6 |
2020-01-26 |
2020-026 |
05:18:51 |
MPU 4 powered off due to Limit Check Action Point 126 trip (IM reported data from MPU4 not received for 8 seconds) |
2020-01-25 |
2020-025 |
19:23:19 |
NICER Re-deploy after AMS EVA #4. Background collection stopped at 18:48:45 |
2020-01-25 |
2020-025 |
10:05:32 |
NICER Stow for AMS EVA #4 - background data collection begins at 10:44:18 |
2020-01-25 |
2020-025 |
08:54:00 |
AMS EVA 4 |
2020-01-23 |
2020-023 |
13:40:00 |
74P Double Reboost |
2020-01-22 |
2020-022 |
18:25:00 |
MT Translate WS7 to 2 |
2020-01-21 |
2020-021 |
16:25:00 |
MT Translate WS8 to WS7 and EP Stow |
2020-01-20 |
2020-020 |
08:50:00 |
P6 Battery EVA 4 |
2020-01-15 |
2020-015 |
16:38:00 |
Pointed NICER in the direction of the astronaut EVA until 16:55. |
2020-01-15 |
2020-015 |
08:50:00 |
P6 Battery EVA 3 |
2020-01-14 |
2020-014 |
15:40:00 |
EP Unstow with MT WS7-8 and NTEA Mnvr |
2020-01-14 |
2020-014 |
14:45:00 |
NICER in Safemode after manual reset of the star tracker. The ST attitude was invalid due to an incorrect AGS7 load earlier at 14:31 which didn't account for ISS structure obstruction so some observations (namely PSR_J0437-4715_opt1) were obstructed until the load was replaced at 21:40. NICER left safe mode at 15:30. |
2020-01-13 |
2020-013 |
19:38:14 |
Attempted to track NGC_4151 rising through Earth's limb. Science plan resumed at 19:51:56. |
2020-01-13 |
2020-013 |
19:52:00 |
MT Translate WS6-7 |
2020-01-11 |
2020-011 |
14:10:00 |
X2R18 Day 3 GNC and S3P3 Transitions |
2020-01-10 |
2020-010 |
18:39:00 |
Interrupted science timeline to view NGC 4151 as it rose behind the Earth. Also, attempted to track Crab Pulsar as it set, but it was slightly out of Azimuth range. Science plan resumed at 19:25:01. |
2020-01-07 |
2020-007 |
06:36:00 |
SpaceX-19 Release |
2020-01-07 |
2020-007 |
04:35:00 |
SpaceX-19 Unberth |
2020-01-06 |
2020-006 |
20:14:00 |
Reset the star tracker to clear up issue with storing images |
2020-01-04 |
2020-004 |
14:45:00 |
NG12 Solar Transfer |
2020-01-03 |
2020-003 |
18:13:24 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2020-01-03 |
2020-003 |
15:25:00 |
NG12 SDS Transfer |
2019-12-31 |
2019-365 |
10:28:00 |
RS OPM DTO to +XVV |
2019-12-30 |
2019-364 |
08:25:00 |
RS OPM DTO to -XVV |
2019-12-27 |
2019-361 |
00:36:00 |
74P Nadir Progress Double Reboost |
2019-12-23 |
2019-357 |
17:24:55 |
Interrupted science timeline to view Herc_X1 as it rose behind the Earth, but ISS arrays were obstructing the view. Science plan resumed at 17:39:35 |
2019-12-22 |
2019-356 |
17:00:00 |
SpaceX-19 Cargo Day 5 |
2019-12-21 |
2019-355 |
06:21:00 |
CMG Maneuver to Stage TEA |
2019-12-18 |
2019-354 |
03:00:00 |
JEMRMS NREP Transfer Day 2 |
2019-12-18 |
2019-352 |
02:10:00 |
JEMRMS NREP Transfer Day 1 |
2019-12-17 |
2019-351 |
23:35:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-17 |
2019-351 |
16:30:00 |
SpaceX-19 Cargo Day 4 MT Translate WS2 to WS6 |
2019-12-17 |
2019-351 |
13:50:00 |
CMG Maneuver to Stage TEA |
2019-12-17 |
2019-351 |
05:15:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-16 |
2019-350 |
16:10:00 |
SpaceX-19 Cargo Day 3 MT Translate WS6 to WS2 |
2019-12-16 |
2019-350 |
13:30:00 |
CMG Maneuver to Stage TEA |
2019-12-13 |
2019-347 |
08:16:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-12 |
2019-346 |
21:30:00 |
SpaceX-19 Cargo Day 2 |
2019-12-11 |
2019-345 |
22:00:00 |
SpaceX-19 Cargo Day 1 and JEMRMS Ops |
2019-12-10 |
2019-344 |
23:42:00 |
SpaceX-19 Cargo Setup MT Translate WS2 to WS6 |
2019-12-09 |
2019-343 |
10:35:13 |
74P Docking on DC-1 49 orbit |
2019-12-08 |
2019-342 |
10:30:00 |
SpaceX-19 Capture |
2019-12-03 |
2019-337 |
17:00:00 |
Double MT Translate 2-6-2 |
2019-12-02 |
2019-336 |
19:01:27 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #3. Background data collection halted. |
2019-12-02 |
2019-336 |
10:10:56 |
Stowed NICER for AMS EVA #3. Background data colletion begins. |
2019-11-29 |
2019-333 |
10:25:30 |
73P Undocking with USTO Mnvrs |
2019-11-26 |
2019-330 |
14:11:59 |
Earth Limb Crab Observations attempted throughout the day |
2019-11-22 |
2019-326 |
18:38:31 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #2. Background data collection halted. |
2019-11-22 |
2019-326 |
10:26:45 |
Stowed NICER for AMS EVA #2. Background data colletion begins. |
2019-11-21 |
2019-325 |
14:41:00 |
Dedicated Thruster Firing Test |
2019-11-20 |
2019-324 |
18:38:22 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-11-18 |
2019-322 |
16:48:01 |
Switched to GEONS for GPS. It had been using SPS since after the EVA. |
2019-11-15 |
2019-319 |
19:24:21 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #1. Background data collection halted. |
2019-11-15 |
2019-319 |
10:41:02 |
Stowed NICER for AMS EVA #1. Background data colletion begins. |
2019-11-13 |
2019-317 |
15:40:00 |
Stow RMCT2 MT Translate WS6-2 |
2019-11-12 |
2019-316 |
15:50:00 |
MT Translate WS2-6 with MTT Install |
2019-11-12 |
2019-316 |
02:30:01 |
NICER Limit checker action point 48 (DI:ST|GPS reports data invalid) failed putting NICER is safe mode (AZ=0, EL=-90). Further analysis showed GPS SPS was invalid for more than 5 minutes. +Z antenna had 4 GPS signals but -Z antenna had none. This was most likely due to blockage due to ROBO Dextre arm being parked close to NICER after MISSE MSC extract/install operations. |
2019-11-12 |
2019-316 |
00:23:18 |
Redeploy and science plan resumed after ROBO Ops Day 4 for MISSE conclude for the day. Background data collection halted. |
2019-11-11 |
2019-315 |
12:09:38 |
Stow for MISSE MSC Transfer Operations by ROBO Day 4 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-10 |
2019-314 |
22:15:01 |
Redeploy and science plan resumed after ROBO Ops Day 3 for MISSE conclude for the day. Background data collection halted. |
2019-11-10 |
2019-314 |
12:17:48 |
Stow for MISSE MSC Transfer Operations by ROBO Day 3 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-10 |
2019-314 |
06:40:24 |
Redeploy and science plan resumed after ROBO Ops Day 2 for MISSE conclude for the day. Background data collection halted. |
2019-11-09 |
2019-313 |
12:17:01 |
Stow for MISSE MSC Transfer Operations by ROBO Day 2 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-09 |
2019-313 |
07:58:14 |
Redeploy and science plan resumed after ROBO Ops for MISSE conclude for the day. Background data collection halted. |
2019-11-08 |
2019-312 |
12:47:59 |
Stow for MISSE MSC Transfer Operations by ROBO - Note: ROBO was in their MSC Transfer Park Position since 311/22:40 which obscured many NICER observations. Background data collection begins. |
2019-11-07 |
2019-311 |
21:45:00 |
Reboost Nadir Progress 73P |
2019-11-07 |
2019-311 |
23:55:00 |
MTT Extract with MT Translate WS6-2 |
2019-11-06 |
2019-310 |
18:10:00 |
MT Translate WS3 to WS6 |
2019-11-04 |
2019-308 |
09:10:00 |
Cygnus12 Capture |
2019-11-01 |
2019-305 |
12:45:00 |
HTV-8 Unberth and release(17:20:00) |
2019-10-29 |
2019-302 |
14:20:00 |
MT Translate WS7 to WS3 |
2019-10-19 |
2019-292 |
17:13:00 |
Reactivation and Redeploy. Back on Science Plan |
2019-10-18 |
2019-291 |
NaN |
Battery Charge/Discharge Unit EVA |
2019-10-13 |
2019-286 |
11:19:00 |
Stopped Science Plan for Stow and Deactivation for RPCM R&R and Battery EVA |
2019-10-13 |
2019-286 |
03:15:00 |
Turned on NICER Pre-heaters in prep for extended power off |
2019-10-11 |
2019-284 |
NaN |
P6 Battery EVA 2 |
2019-10-09 |
2019-282 |
12:26:00 |
Returned to Target Pointing |
2019-10-09 |
2019-282 |
11:45:00 |
Went to Joint Angle Mode to point away from Freon Venting |
2019-10-06 |
2019-279 |
NaN |
P6 Battery EVA 1 |
2019-10-03 |
2019-276 |
07:37:30 |
58S Undocking from MRM1 |
2019-09-30 |
2019-273 |
09:35:00 |
EP Swap Day 2 |
2019-09-30 |
2019-273 |
19:35:00 |
GMT 273-275 MT Translate WS5-7 JEM RMS and Battery Get Ahead Day 1 |
2019-09-29 |
2019-272 |
07:55:00 |
EP Swap Day 1 and 58S Thruster Test |
2019-09-28 |
2019-271 |
11:15:00 |
HTV-8 Capture |
2019-09-26 |
2019-269 |
08:06:00 |
OPM to +XVV with Profile 7 |
2019-09-25 |
2019-268 |
17:45:00 |
61S Docking 4 orbit |
2019-09-25 |
2019-268 |
08:53:00 |
OPM to -XVV with Profile 2 |
2019-09-24 |
2019-267 |
23:00:00 |
Thruster Disable forJEMRMS Ops |
2019-09-24 |
2019-267 |
00:51:00 |
ISS POR took out power to ELC-2 and ELC-4 and MISSE. NICER was completely powered off - Science downtime from 2019-267-00:51:45 - 2019-267-04:38:51 |
2019-09-23 |
2019-266 |
01:25:00 |
Thruster Disable for JEMRMS Ops |
2019-09-20 |
2019-263 |
10:54:00 |
NICER MEB Processor Reset (during SAA passage) Induced Safe Mode - Science downtime 2019-263-10:54:55 to 2019-263-15:06:10 |
2019-09-14 |
2019-257 |
18:01:00 |
SM Reboost |
2019-09-09 |
2019-252 |
17:36:00 |
Reset the Star Tracker because imaging was stuck |
2019-09-06 |
2019-249 |
22:16:00 |
MT Translate WS3 to WS5 |
2019-09-06 |
2019-249 |
17:45:00 |
60S Undock on CMG Control |
2019-09-05 |
2019-248 |
18:20:00 |
Thruster Disable 60S Clamp Removal |
2019-09-05 |
2019-248 |
20:10:00 |
60S Depress |
2019-09-04 |
2019-247 |
19:30:00 |
SPDM Operations |
2019-09-03 |
2019-246 |
17:40:00 |
SPDM Ops and MT Translate WS7 to WS3 |
2019-09-01 |
2019-244 |
21:43:00 |
60S Thruster Test on MM |
2019-08-31 |
2019-243 |
15:00:00 |
Solar Array Test |
2019-08-30 |
2019-242 |
19:30:00 |
MT Translate WS2-7 SPM Ops Translate WS3-7 |
2019-08-29 |
2019-241 |
19:30:00 |
MT Translate WS2-7 and SPDM Ops |
2019-08-29 |
2019-241 |
04:07:55 |
NICER background data collection ended and NICER re-deployed after ROBO MBSU IFM Ops. Since Plan resumed at 241-05:00:47 |
2019-08-28 |
2019-240 |
11:15:00 |
SPDM ORU Ops |
2019-08-28 |
2019-240 |
09:08:25 |
NICER science plan stopped, background data collection started and NICER STOW operations performed for ROBO Ops for MBSU IFM. |
2019-08-27 |
2019-239 |
14:42:00 |
Dragon-18 Release |
2019-08-27 |
2019-239 |
04:20:00 |
Thruster Disable ater 60S Docking |
2019-08-27 |
2019-239 |
03:11:54 |
60S Docking |
2019-08-27 |
2019-239 |
22:15:00 |
MT Translate WS6 to WS2 |
2019-08-27 |
2019-239 |
11:25:00 |
Dragon-18 Unberth |
2019-08-26 |
2019-238 |
03:35:30 |
59S Relocate |
2019-08-25 |
2019-237 |
05:40:00 |
59S Thruster Test on MM |
2019-08-23 |
2019-235 |
05:01:00 |
OPM to -XVV with Profile 1 - Soyuz 60S docking at 2019-236-05:30 was aborted due to (presumed) issue with the KURS docking system amplifier onboard ISS in the RS segment.\n\nSoyuz placed at a safe trajectory from the ISS until further attempt is made to dock again. ISS currently flying in -XVV TEA orientation and no additional maneuvering is expected until re planning has happened.\n\nNICER plan was updated since the ISS maneuver after the docking was not performed to account for the non-change in attitude of the ISS. Also, AP 66 and 67 (solar exclusion) were disabled until maneuvering is completed in coming days. |
2019-08-22 |
2019-234 |
01:00:00 |
Thruster Disable for JEM RMS Ops |
2019-08-21 |
2019-233 |
09:30:00 |
IDA3 EVA |
2019-08-19 |
2019-231 |
23:30:00 |
IDA3 Extraction from Dragon Trunk |
2019-08-19 |
2019-231 |
02:05:00 |
Thruster Disable for JEM RMS Ops |
2019-08-16 |
2019-228 |
00:55:00 |
RRM3 Deconfig MT Translate WS7 to WS6 |
2019-08-15 |
2019-227 |
16:34:01 |
NICER performed several Crab Pulsar observations during Night to Day transitions |
2019-08-15 |
2019-227 |
05:53:00 |
73P Double Reboost |
2019-08-15 |
2019-227 |
15:25:48 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-08-13 |
2019-225 |
19:30:00 |
RRM3 Tech Demo |
2019-08-12 |
2019-224 |
21:41:00 |
RRM3 Setup Robotics MT Translate WS6 to WS7 |
2019-08-07 |
2019-219 |
13:30:00 |
MT Translate WS7 WS6 |
2019-08-06 |
2019-218 |
16:15:00 |
Cygnus-11 Release |
2019-08-06 |
2019-218 |
12:13:00 |
Cygnus-11 Unberth |
2019-08-06 |
2019-218 |
07:05:00 |
Thruster Disable for JEM RMS Ops |
2019-08-04 |
2019-216 |
23:46:00 |
Thruster Disable for JEM RMS Ops |
2019-08-01 |
2019-213 |
03:25:01 |
OPM to +XVV with Profile 6 |
2019-07-31 |
2019-212 |
16:35:00 |
Thruster Disable for 73P Clamp Install |
2019-07-31 |
2019-212 |
15:35:18 |
73P Docking 2 orbit |
2019-07-31 |
2019-212 |
05:46:01 |
OPM to -XVV with Profile 2 |
2019-07-29 |
2019-210 |
10:00:00 |
72P Undocking with UTSO Mnvrs - Sep at 10:44:30 |
2019-07-28 |
2019-209 |
12:24:00 |
Thruster Disable for 72P Clamp Removal |
2019-07-27 |
2019-208 |
15:21:00 |
SpaceX-18 Install Thruster Disable |
2019-07-27 |
2019-208 |
14:00:00 |
Dragon-18 Capture |
2019-07-23 |
2019-204 |
21:11:27 |
Power cycled MPU-2 to clear an timestamping issue seen in science data |
2019-07-23 |
2019-204 |
07:30:00 |
CMG Maneuver to +XVV TEA |
2019-07-22 |
2019-203 |
04:00:00 |
CMG Maneuver to +XVV Yaw Bias Attitude |
2019-07-22 |
2019-203 |
01:12:17 |
NICER enters Pointing Control Safe Mode (AZ=0, EL=90). Due to ISS manuever from -XVV to +XVV, GPS SPS went invalid for greater than 5 minutes, triggering AP 48 calling RTS 30 to safe NICER. |
2019-07-22 |
2019-203 |
00:27:01 |
OPM to +XVV |
2019-07-20 |
2019-201 |
22:50:58 |
59S Docking |
2019-07-20 |
2019-201 |
16:00:00 |
CMG Maneuver to -XVV TEA |
2019-07-14 |
2019-195 |
06:20:00 |
CMG Maneuver to -XVV Yaw Bias Attitude |
2019-07-14 |
2019-195 |
01:45:00 |
OPM to -XVV with Profile 1 |
2019-07-13 |
2019-194 |
19:30:00 |
CMG Maneuver to +XVV TEA |
2019-07-12 |
2019-193 |
18:10:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-07-09 |
2019-190 |
19:40:00 |
Thruster Disable FMS Characterization |
2019-07-08 |
2019-189 |
14:18:00 |
MPU-2 time-stamping corrupt due to stuck bit. |
2019-07-08 |
2019-189 |
19:40:00 |
Thruster Disable FMS Characterization |
2019-07-04 |
2019-185 |
03:30:00 |
Thruster Disable for JEMRMS Ops |
2019-07-03 |
2019-184 |
03:59:00 |
Thruster Disable for JEMRMS Ops |
2019-07-02 |
2019-183 |
23:13:00 |
SM Reboost |
2019-06-27 |
2019-178 |
16:10:00 |
Thruster Disable for SPDM Ops |
2019-06-24 |
2019-175 |
23:25:30 |
57S Undocking with USTO Maneuvers |
2019-06-20 |
2019-171 |
07:42:00 |
57S Thruster Test on MM |
2019-06-19 |
2019-170 |
12:50:00 |
Thruster Disable for SPDM and MT Translate WS2 to WS7 |
2019-06-19 |
2019-170 |
05:58:24 |
Background Data Collection Ends and NICER Re-deploy started |
2019-06-18 |
2019-169 |
13:45:00 |
Thruster Disable for MISSE Robotics |
2019-06-18 |
2019-169 |
12:36:23 |
Background Science Data Collection Begins |
2019-06-18 |
2019-169 |
11:47:49 |
NICER Science Plan stopped and Stow begins for ROBO Ops and MISSE troubleshooting. About 20% of targets were obscured prior to stopping the plan due to ROBO parked in our way over night 168-169. |
2019-06-18 |
2019-169 |
01:00:00 |
Thruster Disable for JERMRMS Ops |
2019-06-17 |
2019-168 |
01:38:00 |
Thruser Disable for JEMRMS Ops |
2019-06-17 |
2019-168 |
18:30:00 |
Thruster Disable for MISSE Robotics |
2019-06-16 |
2019-167 |
00:15:00 |
Thruster Disable for SPDM and MT Translate WS7 to WS2 |
2019-06-14 |
2019-165 |
19:15:00 |
Thruster Disable for SPDM and MT Translate WS2 to WS7 |
2019-06-13 |
2019-164 |
18:44:00 |
NICER science data collection begins |
2019-06-13 |
2019-164 |
17:53:57 |
NICER background data collection stopped and Unstow Begun |
2019-06-13 |
2019-164 |
11:52:10 |
NICER STOW Complete and Background Data Collection begun |
2019-06-13 |
2019-164 |
11:00:05 |
NICER STOW for ROBO Ops Started |
2019-06-13 |
2019-164 |
12:15:00 |
Thruster Disable for SPDM Ops - FRAM Swaps |
2019-06-12 |
2019-163 |
01:00:00 |
Thruster Disable for JEMRMS Ops |
2019-06-12 |
2019-163 |
19:25:00 |
Thruster Disable for MT Translate WS3 to WS2 |
2019-06-07 |
2019-158 |
01:55:00 |
Thruster Disable for JEMRMS Ops |
2019-06-05 |
2019-156 |
00:30:00 |
Thruster Disable for JEMRMS Ops |
2019-06-04 |
2019-155 |
08:40:30 |
71P Undocking on CMG Control |
2019-06-03 |
2019-154 |
16:00:00 |
SpX-17 Release |
2019-06-03 |
2019-154 |
09:40:00 |
Thruster Disable for 72P Hatch Open and SpX-17 Unberth |
2019-06-01 |
2019-152 |
09:43:00 |
71P Aft Progress Prop Purge on CMG Attitude Hold |
2019-05-30 |
2019-150 |
01:10:00 |
Thruser Disable for JEMRMS Ops |
2019-05-29 |
2019-149 |
13:35:00 |
RS EVA 46 on US Control |
2019-05-28 |
2019-148 |
13:25:00 |
MT Translate WS6 to WS3 |
2019-05-27 |
2019-147 |
13:20:00 |
MT Translate WS7 to WS6 |
2019-05-26 |
2019-146 |
12:10:00 |
Thruster Disable for 71P Hatch Closing |
2019-05-24 |
2019-144 |
06:20:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-23 |
2019-143 |
18:50:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-23 |
2019-143 |
16:08:00 |
71P Reboost |
2019-05-23 |
2019-143 |
11:45:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-21 |
2019-141 |
14:45:00 |
Thruster Disable for 72P Hatch Closing |
2019-05-21 |
2019-141 |
15:30:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-20 |
2019-140 |
23:05:00 |
Thruster Disable JEMRMS SFA Ops Part 2 |
2019-05-20 |
2019-140 |
02:30:00 |
Thruster Disable JEMRMS SFA Ops |
2019-05-20 |
2019-140 |
21:00:00 |
ISS Beta Gimbal Assembly on Solar Array 2B on the Port SARJ is stuck and will likely be parked overnight |
2019-05-17 |
2019-137 |
05:30:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-16 |
2019-136 |
17:55:21 |
NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 18:03:28. |
2019-05-16 |
2019-136 |
03:40:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-15 |
2019-135 |
17:50:00 |
Thruster Disable BCDU Relocate |
2019-05-15 |
2019-135 |
03:26:00 |
Thruster Disable BCDU Relocate Setup |
2019-05-14 |
2019-134 |
16:28:35 |
NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 16:37:40. |
2019-05-14 |
2019-134 |
02:12:00 |
SpX Trunk Ops Thruster Disable Day 5 |
2019-05-12 |
2019-132 |
19:30:00 |
SpX Trunk Ops Thruster Disable Day 4 |
2019-05-09 |
2019-129 |
21:40:00 |
SpX Trunk Ops Thruster Disable Days 1 to 3 |
2019-05-07 |
2019-127 |
15:35:00 |
Thruster Disable SpaceX Cargo Robotics Setup |
2019-05-06 |
2019-126 |
11:00:00 |
SpaceX-17 Capture |
2019-05-06 |
2019-126 |
12:55:00 |
SpaceX-17 Install Thruster Disable |
2019-05-03 |
2019-123 |
12:30:00 |
MT Translate WS6 to WS3 SpX17 Robotic Setup |
2019-05-02 |
2019-122 |
12:59:53 |
NICER survival heater service is powered back on by HOSC |
2019-05-01 |
2019-121 |
13:00:00 |
MT Translate WS3 to WS6 MBSU3 R&R Setup |
2019-04-29 |
2019-119 |
22:13:00 |
NICER pre-heaters turned off |
2019-04-29 |
2019-119 |
20:51:00 |
NICER pre-heaters turned on |
2019-04-29 |
2019-119 |
17:35:00 |
NICER pre-heaters turned off |
2019-04-29 |
2019-119 |
15:13:00 |
NICER pre-heaters turned on |
2019-04-29 |
2019-119 |
12:00:00 |
ISS testing caused NICER survival heater service power off |
2019-04-27 |
2019-117 |
13:05:00 |
Thruster Disable for MISSE Transfer Ops Day 5 |
2019-04-26 |
2019-116 |
13:10:00 |
Thruster Disable for MISSE Transfer Ops Day 4 |
2019-04-26 |
2019-116 |
20:00:11 |
NICER powered on |
2019-04-26 |
2019-116 |
23:59:26 |
NICER science targetting resumed |
2019-04-25 |
2019-115 |
13:10:00 |
Thruster Disable for MISSE Transfer Ops Day 3 |
2019-04-24 |
2019-114 |
14:52:00 |
NICER powered off |
2019-04-24 |
2019-114 |
13:26:44 |
NICER Science targetting stopped for stowage for ROBO MISSE Ops. |
2019-04-24 |
2019-114 |
12:25:00 |
Thruster Disable for MISSE Transfer Ops Day 2 |
2019-04-23 |
2019-113 |
12:40:00 |
Thruster Disable for MISSE Transfer Ops Day 1 |
2019-04-19 |
2019-109 |
10:48:00 |
Cygnus 11 Install |
2019-04-19 |
2019-109 |
09:30:00 |
Cygnus 11 Capture |
2019-04-12 |
2019-102 |
22:35:00 |
RRM3 Install and MT Translate WS7 to WS3 - ending DOY 103 |
2019-04-11 |
2019-101 |
12:42:46 |
RRM3 at ELC-1 had a burst disk rupture venting gas and ice. Solar arrays were locked in a position to minimize impact. Venting induced an ISS roll of 1.3 degrees which was corrected at 12:44. Ice buildup on the exterior of the payload continued to break away at 14:03. |
2019-04-10 |
2019-100 |
16:26:00 |
SPDM NiH R&R Operations |
2019-04-09 |
2019-099 |
16:04:00 |
Thruster Disable for SPDM Unstow |
2019-04-08 |
2019-098 |
11:10:00 |
NICER Stowed and powered off |
2019-04-08 |
2019-098 |
17:55:00 |
NICER MEB Powered on |
2019-04-08 |
2019-098 |
09:47:00 |
NICER Science targetting stopped for stowage |
2019-04-08 |
2019-098 |
20:30:00 |
NICER Science targetting resumed |
2019-04-08 |
2019-098 |
10:19:00 |
US EVA Truss Jumper |
2019-04-05 |
2019-095 |
02:15:00 |
RS OPM to +XVV (Yaw back to +356) |
2019-04-05 |
2019-095 |
17:23:00 |
SPDM NiH R&R Operations |
2019-04-04 |
2019-094 |
15:55:00 |
Thruster disable for 72P clamp install |
2019-04-04 |
2019-094 |
14:24:50 |
72P Docking to DC1 |
2019-04-04 |
2019-094 |
04:41:00 |
OPM (Pitch to +359.7) |
2019-04-04 |
2019-094 |
03:04:00 |
OPM to -XVV (Yaw to +177, Pitch to +0.1) |
2019-04-02 |
2019-092 |
12:05:00 |
SPDM BCDU R&R Ops |
2019-03-30 |
2019-089 |
14:00:00 |
LIB ROBO Cleanup |
2019-03-29 |
2019-088 |
09:54:00 |
US EVA 2A LIB |
2019-03-28 |
2019-087 |
05:44:00 |
2A Robotic Battery Operations Ends |
2019-03-26 |
2019-085 |
05:00:00 |
2A Robotic Battery Operations Begins |
2019-03-23 |
2019-082 |
13:22:00 |
71P Reboost |
2019-03-22 |
2019-081 |
10:06:00 |
4A LIB EVA |
2019-03-20 |
2019-079 |
18:06:00 |
Robotics Ops CH4A ends |
2019-03-18 |
2019-077 |
19:00:00 |
Robotics Ops CH4A begins |
2019-03-16 |
2019-075 |
22:37:00 |
MT Translate from WS6 to WS7 EOTP Rotate |
2019-03-16 |
2019-075 |
10:00:00 |
MT Translate from WS3 to WS6 |
2019-03-15 |
2019-074 |
11:22:01 |
OPM to +XVV (back to +356 Yaw) |
2019-03-15 |
2019-074 |
01:10:00 |
ISS Maneuver to Post Docking (Pitch +359) |
2019-03-15 |
2019-074 |
01:02:00 |
58S Docking to MRM1 |
2019-03-14 |
2019-073 |
16:53:01 |
ISS Maneuver to TEA +.4 Pitch) |
2019-03-14 |
2019-073 |
15:51:01 |
OPM to -XVV (Yaw +356to +177 for Soyuz Docking) |
2019-03-08 |
2019-067 |
07:31:04 |
SpaceX Demo-1 Dragon Undocking |
2019-03-03 |
2019-062 |
11:00:00 |
SpaceX Demo-1 Dragon docking to PMA2 |
2019-02-26 |
2019-057 |
02:21:00 |
Progress 71P Reboost |
2019-02-22 |
2019-053 |
19:08:00 |
Thruster Disable for RMCT Stow |
2019-02-22 |
2019-053 |
06:57:00 |
NICER powered back on after MISSE Ops complete |
2019-02-22 |
2019-053 |
10:50:00 |
NICER back on Science plan. |
2019-02-21 |
2019-052 |
18:18:00 |
Thruster Disable for MISSE Ops (troubleshooting with ROBO involved) |
2019-02-21 |
2019-052 |
16:28:00 |
NICER stowed ad powered off for ROBO ops |
2019-02-21 |
2019-052 |
15:09:33 |
NICER Targeting stopped for ROBO Ops to troubleshoot MISSE |
2019-02-20 |
2019-051 |
20:55:00 |
Thruster Disable for RMCT Unstow |
2019-02-15 |
2019-046 |
15:25:00 |
Reset GEONS as part of clock bias reset (NICER was using SPS during 15:27 to 15:32) |
2019-02-15 |
2019-046 |
12:05:00 |
SM Thruster Test |
2019-02-08 |
2019-039 |
12:35:00 |
Cygnus 10 Unberth |
2019-02-08 |
2019-039 |
16:10:00 |
Cygnus 10 Release |
2019-02-06 |
2019-037 |
18:25:00 |
FSW Flash Images 5, 6 and 7 TMR checks |
2019-02-06 |
2019-037 |
19:04:32 |
Updated GEONS EOP per Day 036. |
2019-02-04 |
2019-035 |
14:15:01 |
Reset the Star Tracker because imaging was stuck |
2019-02-01 |
2019-032 |
01:25:00 |
Thruster disable for JEMRMS NRCSD Stow |
2019-01-31 |
2019-031 |
03:05:00 |
Thruster disable for JEMRMS NRCSD Deploy |
2019-01-28 |
2019-028 |
?? |
PRO performed a cold reset of the ELC coldfire processor for mISSE troubleshooting which resulted in a brief interruption of 1553 traffic for NICER |
2019-01-25 |
2019-025 |
12:55:30 |
Progress 70P Undocking from DC1 |
2019-01-24 |
2019-024 |
14:45:00 |
Progress 70P Clamp Removal |
2019-01-22 |
2019-022 |
12:21:00 |
Progress 70P Prop Purge in Momentum Management |
2019-01-18 |
2019-018 |
18:01:00 |
Progress 71P Reboost |
2019-01-13 |
2019-013 |
23:30:00 |
SpaceX 16 Release |
2019-01-13 |
2019-013 |
18:50:00 |
SpaceX 16 Unberth |
2019-01-04 |
2019-004 |
09:59:00 |
NICER back on Science plan. |
2019-01-04 |
2019-004 |
06:38:00 |
NICER Powered back on after ROBO Ops complete |
2019-01-03 |
2019-003 |
01:56:00 |
NICER Powered off for ROBO Ops. |
2019-01-03 |
2019-003 |
00:56:00 |
NICER background data collection stopped. |
2019-01-02 |
2019-002 |
23:45:00 |
NICER stowed and collecting background data |
2019-01-02 |
2019-002 |
22:30:00 |
NICER Targeting stopped for ROBO Ops to install MSCs to MISSE. |
2018-12-21 |
2018-355 |
20:39:00 |
XNAV App configuration update |
2018-12-20 |
2018-354 |
01:40:00 |
Soyuz 55S Undocking on CMG Control from MRM1 |
2018-12-19 |
2018-353 |
22:01:00 |
XNAV App configuration update and restart |
2018-12-19 |
2018-353 |
20:20:00 |
ISS Maneuver to TEA |
2018-12-18 |
2018-352 |
15:56:00 |
GEONS EOP Updated |
2018-12-18 |
2018-352 |
10:30:00 |
ISS Manuever to Yaw Bias Attitude |
2018-12-17 |
2018-351 |
16:16:00 |
XNAV App configuration update and restart |
2018-12-16 |
2018-350 |
09:48:00 |
55S Thruster Test on MM (Soyuz on MRM-1) |
2018-12-13 |
2018-347 |
16:59:00 |
XNAV App configuration update |
2018-12-11 |
2018-345 |
18:15:00 |
Russian EVA 45A on Soyuz Module (they hacked the thing to pieces, debris everywhere!) Messed up our tracking. NICER off targetting plan from 345-18:57 - 23:58. |
2018-12-08 |
2018-342 |
12:21:00 |
SpaceX-16 Dragon Capture |
2018-12-08 |
2018-342 |
08:25:00 |
ISS Manuever to Dragon Capture Attitude |
2018-12-08 |
2018-342 |
12:45:00 |
ISS Manuever to Dragon Berthed TEA |
2018-12-07 |
2018-341 |
21:25:00 |
XNAV App configuration update and restart |
2018-12-04 |
2018-338 |
18:19:00 |
XNAV App configuration update and restart |
2018-12-04 |
2018-338 |
04:07:00 |
ISS Manuever to +XVV using OPM |
2018-12-04 |
2018-338 |
02:45:00 |
ISS Maneuver to -XVV OPM Starting Attitude |
2018-12-03 |
2018-337 |
06:30:00 |
ISS Maneuver to -XVV using OPM for Soyuz docking |
2018-12-03 |
2018-337 |
19:01:00 |
XNAV App configuration update and restart |
2018-12-03 |
2018-337 |
17:42:00 |
ISS Maneuver to Post-Docking LVLH TEA |
2018-12-03 |
2018-337 |
17:36:00 |
Soyuz 57 Docking at MRM2 |
2018-12-03 |
2018-337 |
15:40:00 |
ISS Maneuver to 57S Docking Attitude |
2018-11-29 |
2018-333 |
21:42:00 |
XNAV App configuration update and restart |
2018-11-26 |
2018-330 |
17:12:00 |
XNAV App configuration update and restart |
2018-11-19 |
2018-323 |
10:57:00 |
ISS Manuever to Cygnus Berthed TEA |
2018-11-19 |
2018-323 |
08:20:00 |
ISS Maneuver to Cygnus Capture Attitude |
2018-11-19 |
2018-323 |
10:20:00 |
Cygnus 10 Capture |
2018-11-19 |
2018-323 |
14:49:00 |
NICER payload rebooted by HOSC in error (Science outage of 3 hours and 26 minutes) recovery complete at 323-18:11:58 |
2018-11-18 |
2018-322 |
19:30:00 |
Progress 71P Docking without NG10 |
2018-11-15 |
2018-319 |
21:35:00 |
XNAV App configuration update and restart in Calibration Mode |
2018-11-13 |
2018-317 |
17:54:00 |
XNAV App restart |
2018-11-09 |
2018-313 |
22:01:00 |
XNAV App configuration update and restart |
2018-11-07 |
2018-311 |
16:50:00 |
HTV-7 Release |
2018-11-07 |
2018-311 |
14:20:00 |
XNAV App restart |
2018-11-05 |
2018-309 |
15:29:00 |
XNAV App configuration update and restart |
2018-11-03 |
2018-307 |
12:24:00 |
MEB Processor Reset Induced Safe Mode Downtime 12:24:55 to 17:22:02z |
2018-11-01 |
2018-305 |
20:07:00 |
XNAV App configuration update |
2018-10-26 |
2018-299 |
14:53:00 |
XNAV App configuration update |
2018-10-22 |
2018-295 |
17:59:00 |
XNAV App restart |
2018-10-22 |
2018-295 |
17:35:00 |
Resumed nominal science targeting and photo shoot concludes |
2018-10-22 |
2018-295 |
16:48:00 |
XNAV App restart |
2018-10-22 |
2018-295 |
16:01:00 |
Suspended nominal science targeting and maneuvered NICER for high-def photo opportunities with CRONUS NICER also took pictures of ELC-3 area using star tracker. |
2018-10-22 |
2018-295 |
15:49:00 |
XNAV App configuration update |
2018-10-18 |
2018-291 |
18:10:00 |
Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters |
2018-10-18 |
2018-291 |
18:01:00 |
XNAV App restart |
2018-10-16 |
2018-289 |
19:53:00 |
XNAV App configuration update and restart |
2018-10-15 |
2018-288 |
17:16:00 |
XNAV App configuration update and restart |
2018-10-12 |
2018-285 |
23:02:00 |
ISS maneuvers to +XVV using OPM |
2018-10-12 |
2018-285 |
14:38:00 |
XNAV App configuration update |
2018-10-11 |
2018-284 |
02:13:00 |
ISS maneuvers to -XVV |
2018-10-05 |
2018-278 |
19:25:00 |
XNAV App configuration update |
2018-10-04 |
2018-277 |
07:57:00 |
54S Undocking on CMG Control from MRM2 |
2018-10-02 |
2018-275 |
17:22:00 |
XNAV App configuration update and restart |
2018-10-01 |
2018-274 |
15:58:00 |
XNAV App restart |
2018-09-27 |
2018-270 |
12:00:00 |
HTV-7 Capture |
2018-09-25 |
2018-268 |
17:49:00 |
XNAV App restart |
2018-09-24 |
2018-267 |
14:52:00 |
XNAV App configuration update and restart |
2018-09-20 |
2018-263 |
17:25:00 |
SM Reboost |
2018-09-15 |
2018-260 |
19:21:00 |
XNAV App restart |
2018-09-14 |
2018-257 |
21:50:00 |
XNAV App configuration update and restart |
2018-09-11 |
2018-254 |
17:39:00 |
XNAV App configuration update and restart |
2018-09-06 |
2018-249 |
14:54:00 |
XNAV App configuration update and restart |
2018-09-05 |
2018-248 |
23:55:00 |
SM Reboost |
2018-09-05 |
2018-248 |
17:13:00 |
XNAV App restart |
2018-09-04 |
2018-247 |
21:18:00 |
XNAV App configuration update and restart |
2018-09-04 |
2018-247 |
14:45:00 |
Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters |
2018-08-30 |
2018-242 |
09:45:00 |
Leak in Soyuz 55 module "fixed" |
2018-08-30 |
2018-242 |
15:02:00 |
XNAV App configuration update and restart |
2018-08-29 |
2018-241 |
09:45:00 |
Leak in Soyuz 55 module. Attitude (pitch) divergences. |
2018-08-24 |
2018-236 |
19:44:00 |
XNAV App configuration update and restart |
2018-08-23 |
2018-235 |
02:16:00 |
69P Undocking on CMG Control from SM Aft |
2018-08-21 |
2018-233 |
14:36:00 |
Performed Flash Memory TMR checks. |
2018-08-21 |
2018-233 |
14:19:00 |
XNAV App restart |
2018-08-21 |
2018-233 |
14:17:00 |
XNAV App configuration update |
2018-08-21 |
2018-233 |
13:56:00 |
Updated Earth Orientation Parameters |
2018-08-20 |
2018-232 |
03:25:00 |
69P Prop Purge on CMG AH |
2018-08-17 |
2018-229 |
19:17:00 |
XNAV App configuration update and restart |
2018-08-16 |
2018-228 |
12:58:00 |
Dedicated Thruster Firing Test (free drift) |
2018-08-15 |
2018-227 |
14:10:00 |
RS EVA 45 on US Control |
2018-08-09 |
2018-221 |
18:50:00 |
XNAV App configuration update and restart |
2018-08-03 |
2018-215 |
16:37:00 |
Space-X CRC-15 Dragon released from ISS |
2018-08-01 |
2018-213 |
20:13:00 |
XNAV App configuration update |
2018-07-30 |
2018-211 |
13:38:00 |
Performed maintenance on flash memory partition |
2018-07-27 |
2018-208 |
21:20:00 |
Performed Flash Memory TMR checks. Boot6.bin had TMR errors as did several of the spares. |
2018-07-27 |
2018-208 |
21:19:00 |
XNAV App restart, now running in CAL mode |
2018-07-27 |
2018-208 |
21:17:00 |
XNAV App configuration update |
2018-07-26 |
2018-207 |
17:38:00 |
XNAV App configuration update and restart |
2018-07-26 |
2018-207 |
16:10:00 |
69P at SM Aft reboost |
2018-07-24 |
2018-205 |
20:21:00 |
Reset GEONS and GEONS Clock bias and updated EOP. GEONS had diverged at 18:14 |
2018-07-23 |
2018-204 |
01:45:00 |
Yaw Bias Manuever |
2018-07-21 |
2018-202 |
NaN |
ISS DCSU 3A Power on Reset, disrupting power service to J3AB (NICER survival heater and Op heater power service). POIC powered NICER pre-heaters in response. J3AB down for 8+ hours, minimal impact to NICER) |
2018-07-20 |
2018-201 |
20:38:00 |
XNAV App configuration update |
2018-07-20 |
2018-201 |
20:40:00 |
XNAV App restart, now running in CAL mode |
2018-07-18 |
2018-199 |
13:00:00 |
Maneuver to TEA |
2018-07-17 |
2018-198 |
22:04:00 |
XNAV App restart |
2018-07-17 |
2018-198 |
19:35:00 |
XNAV App configuration update |
2018-07-15 |
2018-196 |
17:00:00 |
Yaw Bias Manuever |
2018-07-15 |
2018-196 |
12:35:00 |
Cygnus-9 Unberth and Release |
2018-07-13 |
2018-194 |
18:56:00 |
XNAV App configuration update and restart |
2018-07-11 |
2018-192 |
02:09:00 |
OPM to +XVV |
2018-07-10 |
2018-191 |
19:25:00 |
Cygnus Reboost Maneuver |
2018-07-10 |
2018-191 |
20:45:00 |
Cygnus Reboost Maneuver to -XVV TEA |
2018-07-10 |
2018-191 |
01:39:00 |
70P Progress 2-Orbit Docking to DC-1 Nadir |
2018-07-10 |
2018-191 |
02:04:00 |
ISS Maneuver to Post-Docking LVLH TEA |
2018-07-09 |
2018-190 |
23:29:00 |
ISS Yaw and Pitch Maneuver (+180 Yaw and +90 Pitch) |
2018-07-09 |
2018-190 |
04:05:00 |
ISS Pitch Maneuver (+359 to +0.5) |
2018-07-09 |
2018-190 |
02:16:00 |
OPM to -XVV (Yaw +354 to +175 for Progress Docking) |
2018-07-09 |
2018-190 |
17:21:00 |
XNAV App configuration update |
2018-07-03 |
2018-184 |
22:01:00 |
XNAV App configuration update |
2018-07-02 |
2018-183 |
15:02:00 |
XNAV App restart |
2018-07-02 |
2018-183 |
10:57:00 |
SpaceX-15 Capture |
2018-06-29 |
2018-180 |
19:32:00 |
XNAV App configuration update |
2018-06-29 |
2018-180 |
13:55:00 |
Performed TMR checks on Flash image 6 and 7 - no errors found |
2018-06-29 |
2018-180 |
13:42:00 |
Reset GEONS and GEONS Clock bias and updated EOP |
2018-06-29 |
2018-180 |
20:54:00 |
XNAV App restart |
2018-06-26 |
2018-177 |
16:00:00 |
XNAV App restart |
2018-06-26 |
2018-177 |
15:54:00 |
XNAV App configuration update |
2018-06-25 |
2018-176 |
14:35:00 |
NICER back in Science Mode |
2018-06-25 |
2018-176 |
14:31:00 |
NICER PC commanded back to Ops Mode |
2018-06-25 |
2018-176 |
13:45:00 |
NICER PC Safe due to FDC |
2018-06-23 |
2018-174 |
08:15:00 |
69P Reboost |
2018-06-21 |
2018-172 |
14:56:00 |
XNAV App configuration update and restart |
2018-06-15 |
2018-166 |
18:50:00 |
XNAV App configuration update |
2018-06-15 |
2018-166 |
17:30:00 |
XNAV App restart |
2018-06-14 |
2018-165 |
09:32:00 |
N2 EWC EVA |
2018-06-12 |
2018-163 |
17:13:00 |
XNAV App configuration update and restart |
2018-06-08 |
2018-159 |
15:30:00 |
XNAV App configuration update and restart |
2018-06-08 |
2018-159 |
13:07:00 |
55S Soyuz Docking on MRM-1 |
2018-06-06 |
2018-157 |
15:18:00 |
XNAV App restart |
2018-06-04 |
2018-155 |
17:34:00 |
XNAV App configuration update and restart |
2018-06-03 |
2018-154 |
09:16:00 |
53S Soyuz undocking |
2018-06-03 |
2018-154 |
09:29:00 |
Manevuer to post-53S undocking attitude |
2018-06-01 |
2018-152 |
20:56:00 |
XNAV App restart |
2018-05-30 |
2018-150 |
17:04:00 |
XNAV App configuration update and restart |
2018-05-24 |
2018-144 |
18:45:00 |
XNAV App configuration update and restart |
2018-05-24 |
2018-144 |
09:20:00 |
OA9 Cygnus Capture (attitude man at 07:20) |
2018-05-22 |
2018-142 |
15:52:00 |
XNAV App restart |
2018-05-21 |
2018-141 |
14:32:00 |
XNAV App configuration update and restart |
2018-05-17 |
2018-137 |
14:15:00 |
XNAV App configuration update and restart |
2018-05-16 |
2018-136 |
17:30:00 |
PFCS EVA complete |
2018-05-16 |
2018-136/137 |
NaN |
PFCS EVA |
2018-05-16 |
2018-136 |
09:02:00 |
NICER targeting stopped |
2018-05-16 |
2018-136 |
10:15:00 |
NICER Stow complete |
2018-05-16 |
2018-136 |
14:21:00 |
NICER Powered off |
2018-05-16 |
2018-136 |
22:57:00 |
XNAV App Restarted |
2018-05-16 |
2018-136 |
18:40:00 |
NICER Powered on |
2018-05-16 |
2018-136 |
21:50:00 |
NICER Deloyed |
2018-05-16 |
2018-136 |
22:56:00 |
NICER resumes targeting |
2018-05-14 |
2018-134 |
15:27:00 |
XNAV App configuration update and restart |
2018-05-12 |
2018-132 |
22:07:00 |
69P Reboost |
2018-05-09 |
2018-128 |
17:20:00 |
XNAV App configuration update and restart |
2018-05-08 |
2018-128 |
20:47:00 |
FSW Flash Images 6 and 7 TMR checks (none found) |
2018-05-07 |
2018-127 |
17:51:00 |
Updated GPS EOP |
2018-05-05 |
2018-125 |
13:24:00 |
SpaceX 14 Release |
2018-05-04 |
2018-124 |
20:17:00 |
Updated XNAV app config and restarted |
2018-05-04 |
2018-124 |
23:17:00 |
SpaceX 14 Unberth Maneuver |
2018-05-01 |
2018-121 |
15:26:00 |
Updated XNAV app config and restarted |
2018-04-27 |
2018-117 |
NaN |
MISSE Robotics Day 7 |
2018-04-26 |
2018-116 |
18:56:00 |
XNAV App configuration update and restart |
2018-04-26 |
2018-116 |
18:42:00 |
XNAV App configuration update |
2018-04-26 |
2018-116 |
NaN |
MISSE Robotics Day 6 |
2018-04-24 |
2018-114 |
17:36:00 |
XNAV App configuration update |
2018-04-24 |
2018-114 |
14:52:00 |
Employing new RTSs to allow modified detector configuration for SCO-X1 observations starting at 15:14. |
2018-04-23 |
2018-113 |
21:46:00 |
Reset XNAV app |
2018-04-23 |
2018-113 |
14:12:00 |
Reset XNAV app |
2018-04-20 |
2018-110 |
18:26:00 |
Updated XNAV app config and restarted |
2018-04-19 |
2018-109 |
23:06:00 |
NICER Reactivated and Redeployed after MISSE MSC installation. MEB on at 109-23:20. Began NICER observations at 110-02:00. |
2018-04-19 |
2018-109 |
NaN |
MISSE Robotics Day 5 |
2018-04-19 |
2018-110 |
03:20:00 |
XNAV App reconfigured and running. Reset performed at 04:02. |
2018-04-18 |
2018-108 |
16:50:00 |
NICER powered off for MISSE MSC activities. MPUs off at 16:58. MEB off at 17:02. |
2018-04-18 |
2018-108 |
NaN |
MISSE Robotics Day 4 |
2018-04-18 |
2018-108 |
10:50:00 |
69P Reboost |
2018-04-18 |
2018-108 |
06:12:00 |
NICER powered on after MISSE activities complete to collect background data. NICER still stowed. - MEB back on at 06:23. MPUs back on at 07:14. |
2018-04-17 |
2018-107 |
17:09:00 |
NICER powered off for MISSE MSC installation activities - MPUs off at 17:14, MEB off at 17:25 |
2018-04-17 |
2018-107 |
13:40:00 |
Science observations suspended. Begin to stow for MISSE MSC installation activities. ROBO arm blocking NICER FOV hours before this. |
2018-04-17 |
2018-107 |
NaN |
MISSE Robotics Day 3 |
2018-04-16 |
2018-106 |
NaN |
MISSE Robotics Day 2 |
2018-04-15 |
2018-105 |
NaN |
MISSE Robotics Day 1 |
2018-04-13 |
2018-103 |
21:28:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-04-13 |
2018-103 |
20:00:00 |
Reset XNAV app |
2018-04-12 |
2018-102 |
15:37:00 |
Reset XNAV app |
2018-04-10 |
2018-100 |
18:35:00 |
Updated XNAV app config and restarted |
2018-04-09 |
2018-099 |
07:40:00 |
NICER began science observations after MISSE-FF installation |
2018-04-09 |
2018-099 |
04:47:00 |
NICER powered on |
2018-04-09 |
2018-099 |
08:33:00 |
XNAV App started |
2018-04-08 |
2018-098 |
18:11:00 |
NICER powered off |
2018-04-08 |
2018-098 |
15:50:00 |
Terminated NICER science observations and began stow and deactivation for MISSE-FF installation |
2018-04-04 |
2018-094 |
14:47:00 |
SpaceX-14 Berth |
2018-04-04 |
2018-094 |
11:00:00 |
SpaceX-14 Capture |
2018-04-03 |
2018-093 |
16:18:00 |
Updated XNAV app config and restarted |
2018-03-30 |
2018-089 |
17:56:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-03-29 |
2018-088 |
11:10:00 |
N3 EWC EVA |
2018-03-28 |
2018-087 |
15:33:00 |
Updated GPS GEONS EOP |
2018-03-28 |
2018-087 |
13:50:30 |
Progress Vehicle (68P) undocking from DC-1 |
2018-03-27 |
2018-086 |
NaN |
Began SEXTANT-driven operations for NICER |
2018-03-26 |
2018-085 |
14:21:00 |
Updated XNAV app config and restarted |
2018-03-26 |
2018-085 |
16:03:00 |
Unexpected ISS Ku-Comm unit reset causing a permanent NICER data loss from 16:17 - 16:42. |
2018-03-26 |
2018-085 |
17:19:00 |
Reset XNAV app |
2018-03-25 |
2018-084 |
13:15:00 |
Manuever to SARJ Parked TEA for 68P Prop Purge |
2018-03-24 |
2018-083 |
06:10:00 |
Manuever OPM to +XVV |
2018-03-23 |
2018-082 |
19:40:00 |
54S Docking |
2018-03-23 |
2018-082 |
07:10:00 |
Maneuver OPM to -XXV for 54S Docking |
2018-03-23 |
2018-082 |
19:32 to 19:43 |
Series of commanded NICER ST resets which left PC in safe mode. Safe mode exited at 19:43. |
2018-03-22 |
2018-081 |
18:59:00 |
Updated XNAV app config and restarted |
2018-03-19 |
2018-078 |
18:20:00 |
Updated XNAV app config and restarted |
2018-03-14 |
2018-073 |
14:44:00 |
Reset XNAV app |
2018-03-13 |
2018-072 |
21:27:00 |
Updated XNAV app config and restarted |
2018-03-13 |
2018-072 |
20:45:00 |
69P Reboost |
2018-03-12 |
2018-071 |
20:43:00 |
Reset XNAV app |
2018-03-09 |
2018-068 |
21:09:00 |
Updated XNAV app config and restarted |
2018-03-06 |
2018-065 |
NaN |
XNAV App ran in opportunistic mode observing PSR_B1937+21 |
2018-03-05 |
2018-064 |
19:59:00 |
MPU-5 Powered off due to overcurrent trip on PDB board. MPU recovery complete at ~ 22:30. |
2018-02-27 |
2018-058 |
23:08:00 |
52S Undocking from MRM2 |
2018-02-22 |
2018-053 |
08:52:00 |
52S Thruster Test on MM |
2018-02-22 |
2018-053 |
19:14:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-02-16 |
2018-047 |
19:11:00 |
Restarted XNAV app after halting it in December 2017 |
2018-02-16 |
2018-047 |
NaN |
POA LEE Swap US EVA |
2018-02-15 |
2018-046 |
10:43:00 |
69P Docking to SM-Aft |
2018-02-13 |
2018-044 |
17:56:00 |
Reset GEONS and clock bias |
2018-02-02 |
2018-033 |
NaN |
RS EVA 44 |
2018-01-30 |
2018-030 |
14:40:00 |
SM Reboost |
2018-01-30 |
2018-030 |
17:11:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-01-23 |
2018-023 |
NaN |
LEE B R&R US EVA |
2018-01-18 |
2018-018 |
15:19:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-01-17 |
2018-017 |
20:15:00 |
SM Main Engine Reboost |
2018-01-13 |
2018-013 |
10:00:00 |
SpX-13 Unberth from N2-Nadir |
2018-01-09 |
2018-009 |
17:35:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-01-02 |
2018-002 |
17:05:00 |
TSIS at ELC-3 vented 1.5L of Argon from 17:05:38 to 17:10:00. |
2017-12-28 |
2017-362 |
01:03:00 |
67P Undocking from SM-Aft |
2017-12-27 |
2017-361 |
21:04:00 |
GEONS diverged (likely due to manuever on DOY 360 for Progress docking) Recovered GEONS at 361-21:37. |
2017-12-19 |
2017-353 |
08:43:00 |
53S Docking to MRM1 |
2017-12-17 |
2017-351 |
11:00:00 |
SpaceX-13 Capture N2-Nadir |
2017-12-15 |
2017-349 |
21:58:00 |
GEONS diverged (likely due to DOY 349 for Soyuz undocking) Recovered GEONS at 349-22:23 |
2017-12-14 |
2017-348 |
05:14:00 |
51S Undocking from MRM1 |
2017-12-12 |
2017-346 |
05:20:00 |
67P Prop Purge |
2017-12-08 |
2017-342 |
10:17:00 |
51S Thruster Test |
2017-12-06 |
2017-340 |
17:17:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2017-12-06 |
2017-340 |
13:12:00 |
OA8 Release from N1-Nadir |
2017-12-01 |
2017-335 |
21:12:00 |
Halted XNAV App |
2017-11-29 |
2017-333 |
15:50:00 |
67P Reboost |
2017-11-28 |
2017-332 |
18:31:00 |
XNAV App Restart |
2017-11-28 |
2017-332 |
18:29:00 |
XNAV App configuration update |
2017-11-22 |
2017-326 |
17:51:00 |
51S Thruster Test |
2017-11-22 |
2017-326 |
17:15:00 |
XNAV App configuration update |
2017-11-20 |
2017-324 |
17:52:00 |
51S Thruster Test |
2017-11-20 |
2017-324 |
20:49:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2017-11-20 |
2017-324 |
20:31:00 |
XNAV App Restart |
2017-11-20 |
2017-324 |
20:29:00 |
XNAV App configuration update |
2017-11-20 |
2017-324 |
19:16:00 |
Reset GEONS and GEONS Clock bias and updated EOP |
2017-11-16 |
2017-320 |
18:11:00 |
51S Thruster Test |
2017-11-14 |
2017-318 |
10:04:00 |
OA8 Capture at N1-Nadir |
2017-11-10 |
2017-314 |
20:10:00 |
51S Thruster Test |
2017-11-05 |
2017-309 |
01:59:00 |
NICER leaves PC Safe and returns to nominal operations. |
2017-11-04 |
2017-308 |
13:56:00 |
NICER Star Tracker Reset (likely due to SEU) causes NICER PC Safe |
2017-11-02 |
2017-306 |
18:37:00 |
MPU Detector thresholds for the Day 306 through 310 LMC-X1 targets were adjusted to be Nominal + 190 as follows:\n2017-306-18:37:20 | /FSW_SC_STARTRTS RTSID=228\n2017-306-23:19:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-02:24:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-07:04:00 | /FSW_SC_STARTRTS RTSID=228\n2017-307-10:10:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-11:43:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-17:56:40 | /FSW_SC_STARTRTS RTSID=228\n2017-308-00:10:47 | /FSW_SC_STARTRTS RTSID=228\n2017-308-01:40:38 | /FSW_SC_STARTRTS RTSID=228\n2017-308-03:13:22 | /FSW_SC_STARTRTS RTSID=228\n2017-308-04:46:02 | /FSW_SC_STARTRTS RTSID=228\n2017-308-09:32:54 | /FSW_SC_STARTRTS RTSID=228\n2017-308-12:33:49 | /FSW_SC_STARTRTS RTSID=228\n2017-308-21:54:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-00:59:54 | /FSW_SC_STARTRTS RTSID=228\n2017-309-02:28:41 | /FSW_SC_STARTRTS RTSID=228\n2017-309-04:02:18 | /FSW_SC_STARTRTS RTSID=228\n2017-309-07:10:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-08:43:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-13:21:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-14:53:37 | /FSW_SC_STARTRTS RTSID=228\n2017-310-00:09:54 | /FSW_SC_STARTRTS RTSID=228\n2017-310-01:42:34 | /FSW_SC_STARTRTS RTSID=228\n2017-310-03:16:35 | /FSW_SC_STARTRTS RTSID=228\n2017-310-07:53:14 | /FSW_SC_STARTRTS RTSID=228\n2017-310-11:01:55 | /FSW_SC_STARTRTS RTSID=228 |
2017-11-02 |
2017-306 |
03:15:00 |
67P Reboost |
2017-10-20 |
2017-293 |
NaN |
EVA 46 |
2017-10-16 |
2017-289 |
11:04:00 |
68P Docking to DC-1 Nadir |
2017-10-10 |
2017-283 |
NaN |
EVA CP9 R&R LEE Lube |
2017-10-05 |
2017-278 |
NaN |
EVA LEE A R&R |
2017-09-27 |
2017-270 |
16:50:00 |
67P Reboost |
2017-09-17 |
2017-260 |
08:40:00 |
SpaceX-12 Dragon Unberth |
2017-09-13 |
2017-256 |
14:46:00 |
Yaw Maneuver to +XVV (~90 minutes) for 52S |
2017-09-13 |
2017-256 |
02:55:00 |
Soyuz (52S) Docking to MRM2 |
2017-09-12 |
2017-255 |
17:08:00 |
Yaw Maneuver to -XVV (~90 minutes) for 52S |
2017-09-07 |
2017-250 |
14:20:00 |
Switched PPS source to GEONS |
2017-09-06 |
2017-249 |
18:46:00 |
Switched PPS source to SPS (due to Earth Orientation Parameters update) |
2017-09-02 |
2017-245 |
21:58:00 |
Soyuz (50S) Undocking from MRM2 |
2017-07-31 |
2017-212 |
17:21:00 |
Switched PPS source to GEONS |
2017-07-31 |
2017-212 |
15:40:00 |
GEONS Reset (to reset GEONS clock bias) - had to repeat several times |
2017-07-31 |
2017-212 |
16:51:00 |
Switched PPS source to SPS |
2017-07-31 |
2017-226 |
14:46:00 |
SpaceX-12 Dragon Berth |
2017-07-31 |
2017-212 |
17:25:00 |
Rebooted the Star Tracker (MIRU quaternion was corrupted due to geons reset) |
2017-07-29 |
2017-210 |
09:44:00 |
Yaw Maneuver to +XVV (~90 minutes) for 51S |
2017-07-28 |
2017-209 |
21:54:00 |
Soyuz (51S) Docking to MRM1 |
2017-07-28 |
2017-209 |
13:39:00 |
Yaw Maneuver to -XVV (~90 minutes) for 51S |
2017-07-21 |
2017-202 |
13:49:00 |
Switched PPS source to GEONS |
2017-07-20 |
2017-201 |
19:59:00 |
Switched PPS source to SPS |
2017-07-20 |
2017-201 |
17:46:00 |
Progress Vehicle (66P) Undocking from DC1-Nadir |
2017-07-18 |
2017-199 |
21:01:00 |
MPU-3 back in science mode |
2017-07-18 |
2017-199 |
20:40:00 |
MPU-3 was powered off due to likely SEU |
2017-07-02 |
2017-183 |
15:46:00 |
SpaceX-11 Dragon Unberth |
2017-07-01 |
2017-182 |
13:26:00 |
Switched to Science Mode 7 (photons and resets) all the time |
2017-06-28 |
2017-179 |
16:25:00 |
Switched PPS source to SPS |
2017-06-28 |
2017-179 |
16:54:00 |
Switched PPS source to GEONS |
2017-06-24 |
2017-175 |
23:09:00 |
Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. |
2017-06-23 |
2017-174 |
21:52:00 |
Switched PPS source to GEONS |
2017-06-22 |
2017-173 |
18:37:00 |
Switched to Science Mode 1 (only photons) for Orbit Day and Mode 7 (photons and resets) for Orbit Night |
2017-06-21 |
2017-172 |
17:44:00 |
Tightened deadbands to 0.5 degrees on heaters for detector and concentrator plates (maintain at +5 deg C) |
2017-06-19 |
2019-170 |
06:45:12 |
NICER Re-deploy complete and Science Data Collection Begins (ROBO is parked in the NICER FOV until later today which will affect 20% of the targets) |
2017-06-18 |
2017-169 |
08:25:00 |
First intentional X-rays received from Scorpious-X1 |
2017-06-18 |
2017-169 |
23:09:00 |
Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. Actually started making adjustments at 11:52z. |
2017-06-17 |
2017-168 |
12:34:00 |
Updated on-board sequence to keep the 4 known bad detectors disabled. |
2017-06-17 |
2017-167 |
11:50:00 |
Set the MPUs to Science Mode 1 (photons only) |
2017-06-16 |
2017-167 |
00:06:00 |
Start of Dual threshold scan - stowed |
2017-06-16 |
2017-167 |
14:05:00 |
End of Dual threshold scan, run #2 |
2017-06-16 |
2017-167 |
00:02:00 |
Power-on ST |
2017-06-16 |
2017-167 |
07:32:00 |
End of Dual threshold scan |
2017-06-16 |
2017-167 |
10:01:00 |
Start of Dual threshold scan, run #2 - stowed |
2017-06-16 |
2017-167 |
11:42:00 |
Progress Vehicle (67P) Docking at SM-Aft |
2017-06-16 |
2017-167 |
13:15:00 |
Power-on GCE, prep for deployment |
2017-06-16 |
2017-167 |
14:10:00 |
Start of Deployment sequence |
2017-06-16 |
2017-167 |
14:30:00 |
First significant Deployment motion |
2017-06-16 |
2017-167 |
14:50:00 |
Deployment to heads down complete |
2017-06-16 |
2017-167 |
15:47:00 |
Deployment to heads up complete |
2017-06-16 |
2017-167 |
16:01:00 |
Range of Motion Started |
2017-06-16 |
2017-167 |
20:07:00 |
Range of Motion Completed |
2017-06-15 |
2017-166 |
04:12:00 |
Frangibolt 3 released |
2017-06-15 |
2017-166 |
05:32:00 |
Frangibolt 2 released |
2017-06-15 |
2017-166 |
20:19:00 |
Frangibolt 4 released |
2017-06-15 |
2017-166 |
21:37:00 |
Set Conc temp settings and Det temp setting to nominal (5 deg C), cooling down to operational temp |
2017-06-15 |
2017-166 |
22:29:00 |
Power-on GPS |
2017-06-15 |
2017-166 |
22:33:00 |
Power-on MPUs |
2017-06-15 |
2017-166 |
23:45:00 |
Enable Science (mode 7 - photons and resets) - stowed |
2017-06-14 |
2017-165 |
06:32:00 |
NICER Activation/Power-on Star Tracker |
2017-06-14 |
2017-165 |
14:16:00 |
Start Frangibolt release process |
2017-06-14 |
2017-165 |
06:38:00 |
NICER Activation/Power-on all MPUs |
2017-06-14 |
2017-165 |
08:06:00 |
NICER Activation/Enable science (mode 7 - phtons and resets) - Stowed |
2017-06-14 |
2017-165 |
08:13:00 |
NICER Activation/Power-on GCE |
2017-06-14 |
2017-165 |
08:19:00 |
Latch |
2017-06-14 |
2017-165 |
08:26:00 |
Power-off GCE |
2017-06-14 |
2017-165 |
13:02:00 |
Power-off MPUs, prep for deployment |
2017-06-14 |
2017-165 |
04:28:00 |
NICER Activation/Power-on MEB |
2017-06-14 |
2017-165 |
16:00:00 |
Power-on GCE to check for frangibolt release |
2017-06-14 |
2017-165 |
16:07:00 |
Frangibolt 1 released |
2017-06-14 |
2017-165 |
22:00:00 |
Discretes 1 and 2 disabled to turn on pre-heaters |
2017-06-14 |
2017-165 |
22:42:00 |
Set Conc temp settings to 30 and Det temp setting to 20, warming up to actuate frangibolts again |
2017-06-14 |
2017-165 |
22:51:00 |
Power-off GCE |
2017-06-14 |
2017-165 |
22:52:00 |
Power-off ST |
2017-06-14 |
2017-165 |
22:53:00 |
Power-off GPS |
2017-06-14 |
2017-165 |
21:34:00 |
Discretes 1 and 2 enabled to turn off pre-heaters |
2017-06-14 |
2017-165 |
06:20:00 |
NICER Activation/Power-on GPS |
2017-06-13 |
2017-165 |
03:53:00 |
NICER Installation |
2017-06-11 |
2017-162 |
22:36:00 |
NICER Extraction |
2017-06-05 |
2017-156 |
17:46:00 |
SpaceX-11 Berth |
2017-06-03 |
2017-154 |
21:07:00 |
SpaceX-11 Launch |
NaT |
2018-183,186-189 |
NaN |
Space-X Robotics |
NaT |
NaN |
NaN |
NaN |