NICER Significant Events


This table list events that may have affected the orientation, data acquitision, or data quality for NICER. It is an important resource for diagnosing unexplained artifacts in the NICER data sets.

Note: ROBO operations (ROBO Ops) can cause obstruction of the NICER XTI field of view for one or more days around the specified activity. Observations within a day (or two) of a scheduled ROBO activity should be checked for possible obstruction of a portion of the XTI field of view. See the analysis thread on ISS obstruction of the XTI field of view for more information.

Day of Year GMT Time Event Description
2023-11-17 2023-321 10:36:54 Star Tracker Imaging got stuck at 23-321-10:36:54.351z. Reset the star tracker at 23-321-14:39:34z.
2023-11-16 2023-320 18:14:57 NICER safe due to low number of GPS signals. Science plan interrupted from 32-320-18:14:57 – 18:41:44.
2023-11-16 2023-320 18:01:00 Thruster Disable for MT Translate WS6 WS7 and SPDM (M23_320_A_05.UAF)
2023-11-15 2023-319 16:54:00 Thruster Disable for MT Translate WS4 WS6 and SPDM (M23_319_A_07.UAF)\t
2023-11-14 2023-318 17:21:00 Thruster Disable for SPDM and JEMRMS Ops (M23_318_A_12.UAF)\t
2023-11-14 2023-318 09:31:22 Star tracker imaging got stuck at 23-318-09:31:22.718z.  Reset the star tracker to fix issue at 23-318-14:08:41z.
2023-11-13 2023-317 01:10:00 Thruster Disable for JEMRMS Ops (M23_317_A_05.UAF)\t
2023-11-12 2023-316 01:08:00 Thruster Disable for JEMRMS Ops (M23_316_A_05.UAF)
2023-11-11 2023-315 10:10:00 Added commands to load to point NICER starboard from 23-315-10:10 – 10:40 for SpX-29 docking at N2F.
2023-11-11 2023-315 08:20:00 Cargo Dragon Docking (SpX-29 to N2F) (M23_315_A_03.UAF)
2023-11-10 2023-314 13:57:00 PDAM - Aft Progress - MLM Roll (M23_314_B_04.UAF)
2023-11-09 2023-313 20:20:00 85P Reboost (H23_313_A_10.UAF)\t
2023-11-07 2023-311 20:50:00 Updated EOPs and Reset GEONS Clock Bias
2023-11-07 2023-311 16:50:00 Thruster Disable for 85P Hatch Close (M23_311_B_05.UAF)
2023-11-03 2023-307 23:50:53 NICER Safe at 23-307-23:50:53z due to WP=32, AP=48 trip (GPS Data Invalid, GPS signals dropped out prior).  NICER back collecting science at 23-308-00:07z.
2023-11-02 2023-306 03:04:06 NICER Safe at 23-306-03:04:06z due to AP=49 trip (GPS Data Invalid, GPS jamming).  NICER back collecting science at 23-306-03:50.
2023-11-01 2023-305 09:14:00 US EVA 89 (RFG Retrieve 2 TBA R&R) (M23_305_A_03.UAF)
2023-10-31 2023-304 09:40:00 Thruster Disable for 84P Hatch Opening (H23_304_A_05.UAF)
2023-10-30 2023-303 13:35:00 Thruster Disable for 85P Hatch Opening (H23_303_B_03.UAF)
2023-10-28 2023-301 05:28:33 NICER Safe at 23-301-05:28:33z due to AP=49 trip (GPS Data Invalid – GPS jamming).  NICER back collecting science at 23-301-06:26:25z.
2023-10-27 2023-300 23:35:00 Thruster Disable for MT Translate W5 W4 (M23_300_A_05.UAF)
2023-10-26 2023-299 15:09:00 Thruster Disable for SPDM Ops (M23_299_A_06.UAF)
2023-10-25 2023-298 15:56:00 RS EVA 61 on US Control (M23_298_A_19.UAF)
2023-10-24 2023-297 13:30:00 Thruster Disable for MT Translate W6 W5 (M23_297_A_03.UAF)
2023-10-19 2023-292 14:20:00 Thruster Disable for 85P Hatch Closing (M23_292_B_04.UAF)
2023-10-19 2023-292 02:51:00 85P Reboost (H23_292_A_08.UAF)
2023-10-17 2023-290 10:04:00 ERA Mission (H23_290_A_03.UAF)
2023-10-16 2023-289 13:25:00 Thruster Disable for 84P Hatch Closing (M23_289_A_08.UAF)
2023-10-10 2023-283 16:07:00 ISS MLM-Nauka Russian Module coolant leak from the radiator almost completely stopped.  Only residual coolant flaking off from external bubble occasionally.\nRestarted the science plan at 23-283-16:07.
2023-10-09 2023-282 18:10:00 Updating the safe position for the ongoing MLM coolant leak. Commanded NICER to AZ=45, EL=100 at 23-282-18:10:00.
2023-10-09 2023-282 17:34:16 Due to MLM coolant leak, Stopped the science plan at 23-282-17:34:16 and commanded NICER to AZ=180, EL=90.
2023-10-09 2023-282 16:58:00 ISS MLM-Nauka Russian Module started leaking coolant from a radiator at ~ 282-16:58z.  NICER team received email at 17:26z informing us of the leak.  OC on voice loop said she thought the leak was coming from the AFT side and was moving forward.
2023-10-09 2023-282 14:42:00 Thruster Disable for MT Translate WS7 WS6 (H23_282_B_04.UAF)
2023-10-09 2023-282 09:20:00 Thruster Disable for 85P Clamp Install (H23_282_A_07.UAF)
2023-10-08 2023-281 22:07:28 Star tracker imaging stuck at 23-281-11:10:39.318.  Reset at 23-281-22:07:28.
2023-10-08 2023-281 21:22:49 GEONS Diverged 23-281-11:49:59. Reset performed at 23-281-21:22:49.
2023-10-06 2023-279 13:48:10 NICER GEONS Diverged since at least 23-279-10:45:19. Reloaded EOPS and reset GEONS
2023-10-06 2023-279 14:30:00 Thruster Disable for SPDM Ops (M23_279_A_08.UAF)
2023-10-03 2023-276 12:51:03 NICER GEONS Diverged since at least 23-276-06:24:10. Reloaded EOPS and reset GEONS
2023-10-03 2023-276 13:45:00 Thruster Disable for SPDM Ops (M23_276_A_06.UAF)
2023-10-02 2023-275 17:50:00 Thruster Disable for SPDM Ops (M23_275_A_05.UAF)
2023-10-02 2023-275 15:24:02 Uploaded RTS 11 (version 05) to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6,  5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7
2023-09-29 2023-272 10:56:00 85P Reboost (H23_272_A_07.UAF)
2023-09-28 2023-271 12:45:00 Thruster Disable for MT Translate SPDM Ops (M23_271_A_03.UAF)
2023-09-28 2023-271 02:40:31 Deployed NICER post ROBO/MISSE operations - Day #3.  NICER science plan resumed at 23-271-02:40:31.
2023-09-27 2023-270 13:47:00 Thruster Disable for SPDM Ops (M23_270_B_06.UAF)
2023-09-27 2023-270 12:51:12 Stowed NICER for ROBO/MISSE operations - Day #3.  NICER science plan stopped at 23-270-12:51:12.
2023-09-27 2023-270 07:15:00 69S Undocking from RSNode US Control (M23_270_A_10.UAF)
2023-09-27 2023-270 03:48:22 Deployed NICER post ROBO/MISSE operations - Day #2.  NICER science plan resumed at 23-270-03:48:22.
2023-09-26 2023-269 12:34:18 Stowed NICER for ROBO/MISSE operations - Day #2.  NICER science plan stopped at 23-269-12:34:18.
2023-09-26 2023-269 09:17:45 Deployed NICER post ROBO/MISSE operations - Day #1.  NICER science plan resumed at 23-269-09:17:45.
2023-09-26 2023-269 13:45:00 Thruster Disable for SPDM Ops (M23_269_A_05.UAF)
2023-09-25 2023-268 14:27:00 Thruster Disable for SPDM Ops (M23_268_A_03.UAF)
2023-09-25 2023-268 12:13:11 Stowed NICER for ROBO/MISSE operations - Day #1.  NICER science plan stopped at 23-268-12:13:11.
2023-09-23 2023-266 16:12:03 Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 6-2, 7-7
2023-09-22 2023-265 13:55:00 Thruster Disable for MT Translate and SPDM Ops (M23_265_B_05.UAF)
2023-09-22 2023-265 11:17:00 69S Thruster Test on MM (M23_265_A_03.UAF)
2023-09-21 2023-264 18:45:00 Thruster Disable for MT Translate (M23_264_A_03.UAF)
2023-09-19 2023-262 13:03:12 Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7
2023-09-18 2023-261 13:37:00 Thruster Disable for MT Translate (M23_261_A_03.UAF)
2023-09-18 2023-261 09:13:08 NICER GEONS Diverged since at least 23-261-08:35:05. Reloaded EOPS and reset GEONS
2023-09-17 2023-260 11:17:00 Thruster Disable for SPDM Operations (M23_260_A_03.UAF)
2023-09-16 2023-259 06:29:00 RS OPM to pXVV Profile 11 (H23_259_A_03.UAF)
2023-09-15 2023-258 17:49:00 70S Docking MRM1 2 orbit (H23_258_A_07.UAF)
2023-09-15 2023-258 05:39:00 RS OPM to nXVV Profile 3 (H23_258_B_03.UAF)
2023-09-13 2023-256 13:20:05 Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7
2023-09-12 2023-255 16:30:00 Thruster Disable for MT Translate WS6 to WS5 (M23_255_A_03.UAF)
2023-09-08 2023-251 18:02:00 85P Reboost (H23_251_A_08.UAF)
2023-09-08 2023-251 10:25:00 Thruster Disable for 85P hatch close (H23_251_B_09.UAF)
2023-09-05 2023-248 13:30:00 Thruster Disable for MT Translate WS4 to WS6 (M23_248_A_03.UAF)
2023-09-03 2023-246 10:40:00 Crew Dragon Undocking (Crew-6 from N2F) (M23_246_A_03.UAF)
2023-09-03 2023-246 10:35:57 Crew-6 Undock from N2F at 11:05z.  NICER looked starboard from 2023-246-10:35:57 to 23-246-11:31:35.
2023-09-01 2023-244 17:15:00 Modified running ATS to include look starboard away from Crew-6 Dragon Thruster Test.  Science plan was interrupted from 2023-244-17:15:00 to 2023-244-17:56:40.
2023-08-31 2023-243 01:15:00 Thruster Disable for JEMRMS Ops (M23_243_A_05.UAF)
2023-08-30 2023-242 19:02:57 Fixed the NICER load building process to remove detector enable alls that were happening in day/night transitions accidentally during the RTS11 bright targets.
2023-08-30 2023-242 16:13:36 Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6,  5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7
2023-08-29 2023-241 13:05:00 Thruster Disable for MT Translate WS6 WS4 (M23_241_B_05.UAF)
2023-08-29 2023-241 22:05:00 Thruster Disable for JEMRMS Ops (M23_241_A_07.UAF)
2023-08-28 2023-240 13:00:00 Thruster Disable for NanoRacks GAMBIT Sortie (M23_240_A_03.UAF)
2023-08-28 2023-240 00:47:00 Uploaded to NICER RTS 11 to enable detectors for ID 5394 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4
2023-08-28 2023-240 13:51:53 Updated EOPs and Reset GEONS Clock Bias
2023-08-28 2023-240 19:49:55 Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7
2023-08-27 2023-239 15:58:00 Thruster Disable for MT Translate WS2 WS6 (M23_239_A_07.UAF)
2023-08-27 2023-239 12:05:40 Commanded NICER to look starboard from 2023-239-12:05:40 to 2023-239-12:59:01 for Dragon Docking (Crew-7 to N2Z)
2023-08-27 2023-239 11:34:00 Dragon Docking (Crew-7 to N2Z) (M23_239_B_02.UAF)
2023-08-25 2023-237 23:25:46 Uploaded to NICER RTS 10,11 disable and enable detectors for ID 5394 in the following config\n1-2, 1-3, 2-1, 2-5, 2-6, 3-8, 4-3, 4-4, 5-4, 5-7, 5-8, 6-5, 6-7, 6-8
2023-08-25 2023-237 05:15:00 85P Hatch Open And Clamp Install (H23_237_B_05.UAF)
2023-08-25 2023-237 01:49:00 85P Docking to SM Aft (H23_237_A_11.UAF)
2023-08-24 2023-236 16:27:00 RS OPM to pXVV (M23_236_B_04.UAF)
2023-08-24 2023-236 13:56:00 PDAM - SM ME - MLM Roll (M23_236_A_02.UAF)
2023-08-24 2023-236 08:41:22 NICER Safe at 23-236-08:41:22z due to AP=49 trip (GPS Data Invalid - GPS jamming).  NICER back collecting science at 23-236-09:10:37z.
2023-08-23 2023-235 22:35:00 Thruster Disable for JEMRMS Ops (M23_235_B_05.UAF)
2023-08-22 2023-234 23:25:00 Thruster Disable for MT Translate WS5 WS2 and JEMRMS Ops (M23_234_B_05.UAF)
2023-08-20 2023-232 23:18:00 83P Undocking from SM Aft (M23_232_A_09.UAF)
2023-08-18 2023-230 06:05:00 Aft Progress 83P Fuel Purge (M23_230_C_03.UAF)
2023-08-18 2023-230 00:50:00 Thruster Disable JEMRMS Ops (M23_230_B_08.UAF)
2023-08-17 2023-229 15:30:00 Thruster Disable for SPDM Checkouts (M23_229_C_03.UAF)
2023-08-17 2023-229 05:10:00 Aft Progress 83P Prop Purge (M23_229_B_05.UAF)
2023-08-15 2023-227 07:50:00 Thruster Disable for 84P Hatch Open (H23_227_A_03.UAF)
2023-08-12 2023-224 05:24:00 US OPM to pXVV with Timeliner Profile 13 (M23_224_A_05.UAF)
2023-08-11 2023-223 13:20:00 Cygnus19 Reboost (M23_223_A_07.UAF)
2023-08-10 2023-222 23:57:00 US OPM to nXVV with Timeliner Profile 5 (M23_222_A_07.UAF)
2023-08-10 2023-222 12:30:00 Thruster Disable ERA Ops (M23_222_B_05.UAF)
2023-08-10 2023-222 05:23:12 Performed GEONS reset after GPS reporting non-convergence
2023-08-09 2023-221 16:23:00 RS EVA 60 ERA Ops Thruster Disable (H23_221_C_07.UAF)
2023-08-09 2023-221 09:15:00 ERA Ops Before Depress (M23_221_B_08.UAF)
2023-08-09 2023-221 13:08:00 RS EVA 60 US Control (M23_221_A_08.UAF)
2023-08-08 2023-220 10:45:00 Thruster Disable ERA Ops (H23_220_A_09.UAF)
2023-08-06 2023-218 00:55:00 PDAM - Aft Progress - MLM Roll (M23_217_B_06.UAF)
2023-08-05 2023-217 14:31:00 Thruster Disable for MT Translate WS2 to WS5 (M23_217_A_02.UAF)
2023-08-04 2023-216 11:54:00 Cygnus19 Install (M23_216_A_03.UAF)
2023-08-04 2023-216 07:50:00 Cygnus19 Capture (M23_215_A_03.UAF)
2023-08-03 2023-215 15:49:37 NICER entered SAFE mode at 23-215-15:49:37 due to GPS signal jamming.  AP 49 tripped after ten minutes of invalid GPS data.  Safe occurred during long TDRSS outage.  NICER was recovered as soon as TDRSS was available.  Science plan was resumed at 23-215-16:47:27.
2023-08-02 2023-214 11:05:00 Thruster Disable for 84P Hatch Close (H23_214_A_03.UAF)
2023-08-01 2023-213 08:19:13 Power issues on ISS made POIC turn off our survival heaters at 23-213-08:19:13z.  They were turned back on at 23-213-11:21ishz
2023-07-31 2023-212 15:46:31 Pointed NICER at the MRM-2 FWD/STBD Window for Photo Survey.  Science plan interrupted from 23-212-15:46:31 - 2023-212-16:32:19.
2023-07-28 2023-209 11:55:00 Thruster Disable for 83P Hatch Closing and MT Translate (M23_209_A_05.UAF)
2023-07-27 2023-208 11:27:00 83P Reboost (H23_208_A_08.UAF)
2023-07-25 2023-206 20:16:00 Tried looking at the MRM-2 window twice and taking photos to see if we are pointed at the window.\nScience plan interrupted from 23-206-20:16:07 to 23-206-20:38:41. – Nothing seen on ST images\nScience plan interrupted from 23-207-00:44:05 to 23-207-01:13:47. – ST images a success.
2023-07-25 2023-206 15:55:00 Star tracker Imaging was stuck.  Reset the star tracker.  Images not taken from 23-206-12:27:35.056 – 23-206-15:55:09.
2023-07-24 2023-205 15:40:00 There was an APS-1 Outage on the ISS from about 205/15:40 – 17:40.  This caused NICER data not to be routed and also not to be recorded on the ISS.
2023-07-20 2023-201 13:20:00 Thruster Disable MT Translate WS4 to WS5 (M23_201_B_03.UAF)
2023-07-20 2023-201 01:51:00 Thruster Disable JEMRMS Ops (M23_201_A_05.UAF)
2023-07-20 2023-201 17:09:53 Updated EOPs and Reset GEONS Clock Bias
2023-07-19 2023-200 01:48:00 Thruster Disable JEMRMS Ops (M23_200_A_03.UAF)
2023-07-17 2023-198 13:28:00 83P Hatch Opening (H23_198_A_07.UAF)
2023-07-15 2023-196 12:10:00 CMG Maneuver to Stage TEA Mom Ramp First Use (M23_196_A_03.UAF)
2023-07-09 2023-190 19:00:00 CMG Maneuver to High-Beta Yaw Bias Attitude Mom Ramp First Use (M23_190_A_03.UAF)
2023-07-07 2023-188 01:09:00 Thruster Disable for JEMRMS Ops (M23_188_A_07.UAF)
2023-07-06 2023-187 13:16:15 Reset the star tracker.  Imaging was stuck from 23-186-22:03:51 - 23-187-13:16:15.
2023-07-06 2023-187 03:26:00 Thruster Disable for JEMRMS Ops (M23_187_A_07.UAF)
2023-07-04 2023-185 20:15:00 83P Reboost (H23_185_A_14.UAF)
2023-07-03 2023-184 11:40:00 Thruster Disable for SpX-28 IPA FSE Unstow (M23_184_A_07.UAF)
2023-07-03 2023-184 18:30:00 Thruster Disable for SpX-28 IPA FSE Jettison (M23_184_B_03.UAF)
2023-06-30 2023-181 13:40:00 Thruster Disable for MT Translate WS2 WS4 (M23_181_A_05.UAF)
2023-06-29 2023-180 15:30:00 Cargo Dragon Undocking (SpX-28 from N2Z) (M23_180_A_03.UAF)
2023-06-29 2023-180 16:20:00 Updated the ATS to look AZ = -45deg, El=88 deg during the SpX-28 Undock to avoid debris/contam.\nScience plan interrupted from 2023-180-16:20:00 to 23-180-16:44:00
2023-06-27 2023-178 16:43:41 SpX-28 is performing a hot-fire thruster test from 16:55 – 17:55z today. Updated the ATS to look AZ = -45deg, El=88 deg during the 2023-178-16:43:41z to 2023-178-18:04:20z, to avoid the plume. Test ended early so manually commanded back to nominal science. Science plan interrupted from 23-178-16:43:40 to 23-178-17:42:58.
2023-06-26 2023-177 23:30:00 Thruster Disable for MT Translate WS4 to WS2 (M23_177_B_05.UAF)
2023-06-26 2023-177 08:10:00 Thruster Disable for 84P Clamp Install (M23_177_A_10.UAF)
2023-06-23 2023-174 16:50:00 Thruster Disable for MT Translate WS1 to WS4 (M23_174_A_03.UAF)
2023-06-22 2023-173 12:45:00 RS EVA 59 on US Control (M23_173_B_05.UAF)
2023-06-16 2023-167 15:10:00 84P Clamp Uninstall (M23_167_B_07.UAF)
2023-06-16 2023-167 05:22:00 83P Reboost (H23_167_A_10.UAF)
2023-06-15 2023-166 09:57:00 IROSA 1B Install EVA (M23_166_A_05.UAF)
2023-06-13 2023-164 19:49:08 Pointed NICER in the direction of ISS EHDC1 and EHDC7 cameras and CRONUS took video and stills.\nScience plan interrupted from 23-164-19:49:08z to 23-164-21:00:12z.
2023-06-12 2023-163 20:59:44 Updated EOPs and Reset GEONS Clock Bias
2023-06-09 2023-160 20:40:19 Maneuvered NICER to look at ISS camera for High Def video survey.  Science Plan interrupted from 23-160-20:40:19 to 23-160-22:29:45.
2023-06-09 2023-160 09:07:00 IROSA 1A Install EVA (M23_160_A_07.UAF)
2023-06-08 2023-159 13:30:00 Thruster Disable for MT Translate from WS4 to WS1 (M23_159_A_03.UAF)
2023-06-07 2023-158 13:20:00 Thruster Disable for MT Translate WS2 to WS4 and IROSA Removal and Install (M23_158_B_03.UAF)
2023-06-06 2023-157 19:36:31 Loaded NICER FSW RTSs 224 - 227 (version 4) which adjust the nominal MPU threshold settings by +35 from nominal. Ran them at 19:36:31
2023-06-06 2023-157 09:50:00 Cargo Dragon Docking (SpX-28 to N2Z) (M23_157_B_03.UAF)
2023-06-06 2023-157 09:14:53 Added commands to load to look port side during SpX-28 157-09:50:00 dock.   Science plan interrupted from 23-157-09:14:53 to 23-157-10:10:00.
2023-06-02 2023-153 14:55:54 Loaded NICER FSW RTSs 224 - 227 (version 3) which adjust the nominal MPU threshold settings by +30 from nominal. Ran them at 14:55:54
2023-06-02 2023-153 00:10:00 Thruster Disable for JEMRMS Ops (M23_153_A_05.UAF)
2023-06-01 2023-152 14:51:03 Tested NICER FSW RTSs 220-223 which command the MPU thresholds back to nominal settings.
2023-06-01 2023-152 14:00:55 Loaded NICER FSW RTSs 224 - 227 (version 2) which adjust the nominal MPU threshold settings by 50. Ran them at 14:06:56.
2023-06-01 2023-152 00:29:47 Adjusted MPU detector threshold settings by 50 counts from nominal.
2023-06-01 2023-152 15:40:37 Started NICER FSW RTSs 224-227 which adjust the nominal MPU threshold settings by 50.
2023-06-01 2023-152 20:34:48 Modified the NICER ATS load builder to use the day crossing to call RTS 224-227 to set MPU threshold settings to nominal + 50 and to call RTS 220-223 at night crossing to set thresholds back to nominal values.
2023-06-01 2023-152 09:05:00 Thruster Disable for ERA Ops (M23_152_A_07.UAF)
2023-05-31 2023-151 22:10:45 Adjusted MPU detector threshold settings by 140 counts from nominal.
2023-05-31 2023-151 21:19:23 Adjusted MPU detector threshold settings by 230 counts from nominal.
2023-05-31 2023-151 22:13:00 Thruster Disable for MT Translate WS4 to WS2 (M23_151_A_02.UAF)
2023-05-31 2023-151 23:19:10 Adjusted MPU detector threshold settings by 100 counts from nominal.
2023-05-30 2023-150 22:32:00 Modified the ATS load builder to re-enable the detectors after transitioning from day to night if target spanned across the boundary.
2023-05-30 2023-150 20:47:00 Thruster Disable for JEMRMS Ops (M23_150_B_03.UAF)
2023-05-30 2023-150 18:57:32 Pointed NICER head at an external ISS camera that had been looking at MISSE. Science plan interrupted until 19:12:47
2023-05-30 2023-150 15:03:19 Pointed NICER head away from AX-2 undocking. Science plan interrupted until 15:15:56
2023-05-30 2023-150 14:27:00 Crew Dragon Undocking (Ax-2 from N2Z) (M23_150_A_03.UAF)
2023-05-29 2023-149 09:55:00 Thruster Disable for 83P Hatch Close (M23_149_A_05.UAF)
2023-05-27 2023-147 22:32:00 Thruster Disable for MT Translate WS7 to WS4 and SPDM (M23_147_C_03.UAF)
2023-05-27 2023-147 13:35:00 Thruster Disable for SPDM Ops (M23_147_A_05.UAF)
2023-05-27 2023-147 01:35:00 Thruster Disable for MT Translate WS4 to WS7 and SPDM (M23_147_B_03.UAF)
2023-05-25 2023-145 03:39:00 RS OPM to pXVV (M23_145_A_12.UAF)
2023-05-25 2023-145 15:45:00 ROBO Ops: I69 SPDM Stow and reconfigure for TPS Survey\nOps: Xlate from WS 2 to WS4\nIN NICER FOV possibly until 22:15
2023-05-25 2023-145 16:00:00 Thruster Disable for MT Translate and SPDM Ops (M23_145_B_05.UAF)
2023-05-24 2023-144 17:55:00 Thruster Disable for 84P Hatch Opening (H23_144_C_03.UAF)
2023-05-24 2023-144 15:50:00 84P Docking Reduced RS Master Timeline (H23_144_A_11.UAF)
2023-05-24 2023-144 03:08:00 RS OPM to nXVV (H23_144_B_07.UAF)
2023-05-22 2023-142 13:45:00 Start of NICER light leak
2023-05-22 2023-142 12:00:00 Dragon Docking (Ax-2 to N2Z) (M23_142_A_08.UAF)
2023-05-18 2023-138 15:53:00 83P Reboost (H23_138_A_10.UAF)
2023-05-17 2023-137 01:50:00 Thruster Disable for JEMRMS Ops (M23_137_A_08.UAF)
2023-05-16 2023-136 00:25:00 Thruster Disable for JEMRMS Ops (M23_136_A_05.UAF)
2023-05-15 2023-135 17:05:00 83P Hatch Open and Clamp Install (M23_135_A_05.UAF)
2023-05-15 2023-135 13:20:00 CMG Maneuver to Stage TEA (M23_135_B_03.UAF)
2023-05-12 2023-132 14:20:00 RS EVA 58 (M23_132_B_05.UAF)
2023-05-12 2023-132 12:51:11 Updated EOP and reset GEONS clock bias
2023-05-11 2023-131 22:10:00 CMG Maneuver to High-Beta Yaw Bias Attitude (M23_131_A_03.UAF)
2023-05-06 2023-126 10:35:00 Dragon Port Relocate (Crew-6 from N2Z to N2F) (M23_126_A_05.UAF)
2023-05-04 2023-124 17:10:00 Thruster Disable for ERA Mission after EVA 57 (H23_124_A_03.UAF)
2023-05-03 2023-123 20:38:00 Thruster Disable for RS EVA 57 ERA Ops (H23_123_C_05.UAF)
2023-05-03 2023-123 18:30:00 RS EVA 57 (H23_123_B_03.UAF)
2023-05-02 2023-122 08:15:00 Thruster Disable for ERA Ops (H23_122_A_03.UAF)
2023-05-01 2023-121 14:15:00 Thruster Disable for MT Translate WS4 to WS2 (M23_121_A_03.UAF)
2023-04-30 2023-120 13:20:00 MT Translate WS5 to WS4 and SPDM Ops (M23_120_B_05.UAF)
2023-04-29 2023-119 23:26:00 83P Reboost (H23_120_A_06.UAF)
2023-04-28 2023-118 22:00:00 Thruster Disable for MT Translate WS4 to WS5 (M23_118_B_05.UAF)
2023-04-28 2023-118 10:30:00 US EVA 86 (RFG Retrieve) (M23_118_A_07.UAF)
2023-04-27 2023-117 09:50:00 Thruster Disable for ERA Ops (M23_117_A_07.UAF)
2023-04-25 2023-115 01:10:00 Thruster Disable for JEMRMS Ops (M23_115_A_03.UAF)
2023-04-25 2023-115 12:20:00 Thruster Disable for MT Translate WS5 to WS4 (M23_115_B_07.UAF)
2023-04-24 2023-114 14:52:00 Thruster Disable for 83P Hatch Close SPDM and MT Translate WS4 to WS5 (M23_114_B_07.UAF)
2023-04-23 2023-113 11:10:00 Ops: ELC-3 SASA Unstow until 114 03:25
2023-04-23 2023-113 11:00:00 Thruster Disable JEMRMS SPDM and MT Translate WS7 to WS4 (M23_113_A_12.UAF)
2023-04-21 2023-111 18:10:00 Thruster Disable MT Translate WS5 to WS7 (M23_111_B_05.UAF)
2023-04-21 2023-111 08:50:00 Cygnus18 Release (M23_111_A_05.UAF)
2023-04-21 2023-111 07:15:00 Cygnus18 Unberth (M23_110_A_05.UAF)
2023-04-20 2023-110 14:00:00 Thruster Disable ERA and 83P Hatch Opening (H23_110_B_05.UAF)
2023-04-19 2023-109 02:20:00 Thruster Disable for ERA Ops (H23_109_A_03.UAF)
2023-04-18 2023-108 23:55:00 RS EVA 56 Depress US Control (M23_108_A_03.UAF)
2023-04-18 2023-108 20:25:00 Thruster Disable for ERA Ops (H23_108_B_03.UAF)
2023-04-15 2023-105 14:27:00 Cargo Dragon Undocking (SpX-27 from N2F) (M23_105_A_03.UAF)
2023-04-13 2023-103 15:52:00 SpX-27 Dedicated Thruster Firing Test (M23_103_A_08.UAF)
2023-04-10 2023-100 00:15:28 Updated EOP and reset GEONS clock bias
2023-04-07 2023-097 13:30:00 Thruster Disable for MT Translate WS7 WS5 (M23_097_A_05.UAF)
2023-04-06 2023-096 08:20:00 Soyuz Relocate (69S from MRM-2 to NM) (H23_096_B_03.UAF)
2023-04-05 2023-095 14:10:00 Thruster Disable for MISSE Ops Day 7 MT Xlate WS2 WS7 (M23_095_A_03.UAF)
2023-04-04 2023-094 05:14:00 Deployed NICER post MISSE ROBO Operations Day 5
2023-04-04 2023-094 05:03:53 Updated EOP and reset GEONS clock bias
2023-04-04 2023-094 13:45:00 Thruster Disable for MISSE Ops Day 6 (M23_094_A_03.UAF)
2023-04-03 2023-093 13:15:00 Thruster Disable for MISSE Ops Day 5 (M23_093_A_03.UAF)
2023-04-03 2023-093 11:59:33 Stowed NICER for MISSE ROBO Operations Day 5
2023-04-03 2023-093 03:54:40 Deployed NICER post MISSE ROBO Operations Day 4
2023-04-03 2023-093 03:41:48 Updated EOP and reset GEONS clock bias
2023-04-02 2023-092 13:15:00 Thruster Disable for MISSE Ops Day 4 (M23_092_A_03.UAF)
2023-04-02 2023-092 11:55:12 Stowed NICER for MISSE ROBO Operations Day 4
2023-04-02 2023-092 05:56:42 Deployed NICER post MISSE ROBO Operations Day 3
2023-04-02 2023-092 05:40:23 Updated EOP and reset GEONS clock bias
2023-04-01 2023-091 14:40:00 Thruster Disable for MISSE Ops Day 3 (M23_091_A_03.UAF)
2023-04-01 2023-091 11:59:13 Stowed NICER for MISSE ROBO Operations Day 3
2023-03-31 2023-090 19:44:00 US OPM to pXVV with Timeliner Profile 14 (M23_090_A_05.UAF)
2023-03-31 2023-090 09:35:00 Thruster Disable for ERA Ops (H23_090_B_05.UAF)
2023-03-30 2023-089 14:48:00 Cygnus18 Reboost (M23_089_A_08.UAF)
2023-03-29 2023-088 16:37:00 US OPM to nXVV with Timeliner Profile 6 (M23_088_A_03.UAF)
2023-03-29 2023-088 14:13:28 Updated EOP and reset GEONS clock bias
2023-03-29 2023-088 14:07:36 Deployed NICER post MISSE ROBO Operations Day 2
2023-03-28 2023-087 20:48:53 Stowed NICER for MISSE ROBO Operations Day 2
2023-03-28 2023-087 23:41:00 Thruster Disable for MISSE Ops Day 2 (M23_087_B_05.UAF)
2023-03-28 2023-087 08:54:00 Soyuz Undocking on RS Control 68S from MRM1 (H23_087_R_07.UAF)
2023-03-28 2023-087 00:15:00 Deployed NICER post MISSE ROBO Operations Day 1
2023-03-27 2023-086 23:54:49 Updated EOP and reset GEONS clock bias
2023-03-27 2023-086 12:09:00 Thruster Disable for MISSE Ops MT Xlate WS7 WS2 (M23_086_A_05.UAF)
2023-03-27 2023-086 10:54:18 Stowed NICER for MISSE ROBO Operations Day 1
2023-03-23 2023-082 01:05:00 Thruster Disable for JEM RMS Ops (M23_082_A_05.UAF)
2023-03-23 2023-082 16:57:00 Thruster Disable for SPDM Ops MT Xlate WS5 WS7 (M23_082_B_03.UAF)
2023-03-22 2023-081 01:10:00 Thruster Disable for JEM RMS Ops (M23_080_B_04.UAF)
2023-03-21 2023-080 01:25:00 Thruster Disable for JEM RMS Ops (M23_080_A_03.UAF)
2023-03-20 2023-079 18:30:00 MT Translate WS4 WS5 (M23_079_A_03.UAF)
2023-03-19 2023-078 20:00:00 Thruster Disable for SPDM and JEMRMS Ops (M23_078_A_03.UAF)
2023-03-17 2023-076 00:35:00 Thruster Disable for JEM RMS Ops (M23_076_A_03.UAF)
2023-03-16 2023-075 10:15:00 Dragon Docking (SpX-27 to N2F) (M23_075_A_07.UAF)
2023-03-15 2023-074 15:07:00 68S Thruster Test on MM (M23_074_A_03.UAF)
2023-03-14 2023-073 10:44:00 PDAM Aft Progress MLM Roll (M23_073_A_02.UAF)
2023-03-13 2023-072 19:50:00 Thruster Disable for MT Translate (M23_072_B_03.UAF)
2023-03-11 2023-070 06:41:00 Crew Dragon Undocking (Crew-5 from N2F) (M23_070_B_03.UAF)
2023-03-10 2023-069 01:35:00 Thruster Disable for JEMRMS Ops (M23_069_B_06.UAF)
2023-03-08 2023-067 19:12:00 83P Reboost (H23_067_A_10.UAF)
2023-03-08 2023-067 18:33:00 Uploaded updated versions of RTS 250 and 251 to disable subset of detectors at <70 degrees
2023-03-07 2023-066 00:05:00 Thruster Disable for JEMRMS Ops (M23_065_D_05.UAF)
2023-03-07 2023-066 13:37:00 The target catalog had bad coordinates for the COMET and thus PC rejected the pointing command and NICER stopped until the next target was commanded from the load.\n\nNICER stopped from 23-066-13:37:17.721 to 23-066-14:12:43.621
2023-03-06 2023-065 17:22:00 69S Thruster Test on MM (M23_065_C_03.UAF)
2023-03-06 2023-065 11:32:00 GMT 065 PDAM Aft Progress MLM Roll (M23_065_E_03.UAF)
2023-03-06 2023-065 05:15:00 During a comet observation we had the wrong coordinates for the target in the catalog.\n\nPC wouldn’t accept the target, so NICER stopped.\nNICER stopped from 05:15:59 to 05:32:03
2023-03-06 2023-065 00:16:00 Thruster Disable for JEMRMS Ops (M23_065_B_03.UAF)
2023-03-03 2023-062 04:25:00 Crew Dragon Docking (Crew-6 to N2Z) (M23_062_B_05.UAF)
2023-03-01 2023-060 20:17:00 Changed MAX recorder file size for science files (index 1) to 20MB. (Trying to alleviate problem with data storage not disabling)
2023-02-28 2023-059 15:54:00 Uploaded a modified RTS 243 to include disabling of 7-7, 2-3 and 2-6 at < 53 deg sun angle.
2023-02-27 2023-058 17:37:00 Updated EOP and reset GEONS clock bias
2023-02-26 2023-057 15:02:00 RS OPM to pXVV (H23_057_A_05.UAF)
2023-02-25 2023-056 00:55:03 NICER Safe due to ISS maneuver (ISS maneuver action points were not disabled.)\n\nNICER Science downtime from 23-057-00:55:03 to 23-057-01:54:53.
2023-02-25 2023-056 22:50:00 69S Docking MRM2 (M23_056_C_10.UAF)
2023-02-25 2023-056 01:51:00 RS OPM to nXVV (H23_056_A_03.UAF)
2023-02-21 2023-052 15:59:00 Added disable of detector 2-4 for sun angled less than 60 degrees. Uploaded RTS241_v09.
2023-02-21 2023-052 01:02:00 Thruster Disable for JEMRMS Ops (M23_052_C_03.UAF)
2023-02-21 2023-052 14:24:00 Reset the star tracker due to stuck imaging. Unfortunately, commanded the reset during a BBO. :( Resulted in Safe Mode. Science interrupted from 23-052-14:24 – 23-052-14:26:42
2023-02-21 2023-052 18:30:00 Thruster Disable for MT Translate WS4 to WS2 (M23_052_D_05.UAF)
2023-02-20 2023-051 15:38:00 Added detector 4-3 to the set of detectors that get disabled at low sun angles (RTS 241). Uplinked and enabled RTS 241 for this change.
2023-02-20 2023-051 13:45:00 Thruster Disable for 83P hatch closing (H23_051_A_07.UAF)
2023-02-20 2023-051 03:30:00 83P Reboost (H23_051_C_05.UAF)
2023-02-18 2023-049 22:42:00 RS OPM to pXVV (H23_050_B_03.UAF)
2023-02-18 2023-049 01:15:00 82P Undocking on RS Control (M23_049_C_06.UAF)
2023-02-18 2023-049 02:19:00 Disabled OHMAN TOO response (MAXI was giving overnight multiple triggers in a row which we think were false)\n\nUploaded an ATS in the A buffer that we will switch to from the load running in the B buffer 5 minutes prior to the 82P undock. ATS A will point the head away from the undock in case of contamination AZ=90deg, EL=88 deg. It will then switch back to the science ATS 3 hours later.\n\nWhen the load commanded the head to EL 88 deg it hit the softstop and tripped the EL fault. This had to be cleared before we could go back to science pointing.\n\nSCIENCE INTERRUPTED FROM 2023-049-02:19:00 UNTIL 23-049-03:47:54
2023-02-17 2023-048 21:45:00 CMG Maneuver to Stage TEA (M23_048_B_08.UAF)
2023-02-16 2023-047 14:36:00 Uplinked RTS rts242_02.dat so that detectors were disabled at low sun angles. -TURNS OUT THAT 242 was not the correct version on-board and was not turning off all the detectors.\n\nLoaded NICER V2_7_1_6 CCR #040 WP/AP updated for Data Storage Management and modified RTS 70 and RTS 244 to enable AP 111 and 110.
2023-02-16 2023-047 08:10:00 82P Clamp Uninstall and Hatch Closure (H23_047_A_08.UAF)
2023-02-15 2023-046 15:00:00 NICER GSFC SPOCC SEN firewall reverted to previous since GSE packets weren't being received.
2023-02-15 2023-046 20:36:00 Modified and uplinked RTS rts243_06.dat so that Detector 4-3 was disabled at low sun angles. Was playing around with detector configuration from 20:30 through 20:40.
2023-02-15 2023-046 15:30:00 CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_046_A_03.UAF)
2023-02-14 2023-045 15:00:00 NICER GSFC SPOCC firewall upgrade - GSE packets 603 and 611 not being received.
2023-02-11 2023-042 10:29:00 Thruster Disable for 83P Hatch Opening (H23_042_B_03.UAF)
2023-02-11 2023-042 06:45:00 83P Docking SM Aft (H23_042_A_12.UAF)
2023-02-09 2023-040 04:09:44 NICER star tracker imaging stuck. ST reset at 13:56
2023-02-07 2023-038 04:23:00 81P Undocking from SM Aft CMG Control (M23_038_A_09.UAF)
2023-02-06 2023-037 07:10:00 CMG Maneuver to Stage TEA (M23_037_A_03.UAF)
2023-02-03 2023-034 19:50:00 CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_034_B_03.UAF)
2023-02-03 2023-034 12:35:00 81P Prop Purge (M23_034_A_03.UAF)
2023-02-03 2023-034 09:25:00 81P Reboost (H23_034_R_07.UAF)
2023-02-02 2023-033 09:55:00 US EVA 85 1A IROSA Prep Part2 (M23_033_A_03.UAF)
2023-01-31 2023-031 16:55:00 Ran the happy pill for MPU 7-4
2023-01-31 2023-031 17:20:00 IPA FSE Jettison MCS Configuration (M23_031_A_05.UAF)
2023-01-31 2023-031 17:12:00 Turned MPU 6-5 back on and then back off again.
2023-01-30 2023-030 13:30:00 Thruster Disable for IPA Jettison Setup (M23_030_A_07.UAF)
2023-01-27 2023-027 00:20:00 Thruster Disable for JEMRMS Ops (M23_027_B_03.UAF)
2023-01-27 2023-027 11:30:00 Thruster Disable for 81P Hatch Close (H23_027_A_05.UAF)
2023-01-26 2023-026 15:10:00 Thruster Disable for MT Translate WS7 to WS4 (M23_026_A_03.UAF)
2023-01-25 2023-025 15:07:00 Thruster Disable for MT Translate WS2 to WS7 (M23_025_A_03.UAF)
2023-01-24 2023-024 18:07:46 MPU 6-6 detector annealing started
2023-01-24 2023-024 17:20:00 Ops: MSS Uplink and Checkouts, SSRMS Motion Requred for Checkouts - ROBO in NIVER FOV until 1/25/2023 16:00
2023-01-23 2023-023 19:15:01 Updated EOP and reset GEONS clock bias
2023-01-20 2023-020 10:45:00 US EVA 84 1A IROSA Prep (M23_020_A_05.UAF)
2023-01-19 2023-019 14:30:00 Thruster Disable for MT Translate WS5 to WS2 (M23_019_A_03.UAF)
2023-01-18 2023-018 14:22:00 81P Reboost (H23_018_A_10.UAF)
2023-01-17 2023-017 14:25:00 Thruster Disable for MT Translate WS3 to WS5 (M23_017_A_03.UAF)
2023-01-12 2023-012 15:10:00 Thruster Disable for MT Translate WS4 to WS3 (M23_012_A_03.UAF)
2023-01-10 2023-010 02:10:00 Thruster Disable for JEMRMS Ops (M23_010_A_03.UAF)
2023-01-09 2023-009 15:35:00 Thruster Disable for 81P hatch opening (H23_009_B_03.UAF)
2023-01-09 2023-009 21:33:00 Cargo Dragon Undocking (SpX-26 from N2Z) (M23_009_A_03.UAF)
2023-01-07 2023-007 21:18:00 MT Translate WS3 to WS4 (M23_007_B_03.UAF)
2023-01-07 2023-007 14:30:00 Thruster Disable for SPDM Ops (M23_007_A_03.UAF)
2023-01-06 2023-006 15:00:00 Thruster Disable for SPDM Ops RPCM R&R (M23_006_B_05.UAF)
2023-01-06 2023-006 02:00:00 Thruster Disable for JEMRMS Ops (M23_006_A_05.UAF)
2023-01-05 2023-005 15:00:00 ROBO OPs: Ops: S11A-A RPCM RnR until 007-05:00 in NICER FOV
2023-01-05 2023-005 15:00:00 Thruster Disable for SPDM Ops (M23_005_B_03.UAF)
2023-01-04 2023-004 10:53:27 NICER entered safe mode at FSW AP #66 (AZ Sun angle violation) tripped at 23-004-10:53:27.062.  This due to sticky AZ motor not being able to move the head to the commanded target.\nOperator recovered to science collection at 23-004-12:18:40.
2023-01-04 2023-004 23:10:00 Thruster Disable for MT Translate WS7 to WS3 (M23_005_A_03.UAF) ROBO Ops: Ops: Mnvr to Xlate,Xlate WS 7>3, S11A-A RPCM RR Setup until 005-04:50
2023-01-04 2023-004 18:02:00 SpX-26 Dedicated Thruster Firing Test (M23_004_A_05.UAF)
2023-01-04 2023-004 17:44:00 After ATS commanded NICER to a target change at 2023-004-17:44:00, the AZ motor failed to move the head again and NICER did not track the target. Operator noticed NICER was not tracking and enabled the sun angle violation APs that were still disabled from the morning safe, so that NICER would safe again, since cause of not being able to track was unknown at the time. Operator tried to move head in AZ direction again without success.\n\nEngineers (Alice and Gary) were called in and team was able to “unstick” the AZ by commanding multiple slower movements of the head in the AZ direction.\n\nScience was resumed at 23-004-22:25:48.
2023-01-03 2023-003 03:32:00 NICER entered safe mode due to Action Point 48 FDC.  Too few GPS signals.  Alerting system was down, so operators didn’t see until around 13:00 at which time recovery commenced. Total Science downtime was from 23-003-03:32 until 23-003-13:37:38
2022-12-30 2022-364 12:40:00 Thruster Disable for SPDM RPCM R&R Ops Day2 (M22_364_B_05.UAF)
2022-12-30 2022-364 01:24:00 Thruster Disable for JEMRMS Ops (M22_364_A_03.UAF)
2022-12-29 2022-363 01:47:00 Thruster Disable for JEMRMS Ops (M22_363_B_03.UAF)
2022-12-29 2022-363 14:50:00 Thruster Disable for SPDM RPCM R&R Ops Day1 (M22_363_C_03.UAF)
2022-12-28 2022-362 00:15:00 Thruster Disable for JEMRMS Ops (M22_362_A_03.UAF)
2022-12-28 2022-362 18:00:00 Thruster Disable for SPDM RPCM R&R Setup Ops (M22_362_B_03.UAF)
2022-12-27 2022-361 07:58:00 Thruster Disable for 82P hatch opening (H22_361_B_03.UAF)
2022-12-26 2022-360 00:10:00 Thruster Disable for JEMRMS Ops (M22_360_A_08.UAF)
2022-12-22 2022-356 11:08:00 US EVA IROSA 4A Install (M22_356_D_03.UAF)
2022-12-21 2022-355 12:32:00 PDAM AftProgress MLM Roll (M22_355_E_02.UAF)
2022-12-20 2022-354 20:45:00 MT Translate WS5 to WS7 (M22_354_B_03.UAF)
2022-12-20 2022-354 00:10:00 Thruster Disable for JEMRMS Ops (M22_354_A_06.UAF)
2022-12-18 2022-352 15:14:00 Thruster Disable for 68S Robotic Survey (M22_352_B_03.UAF)
2022-12-16 2022-350 07:44:00 68S Thruster Test on MM (M22_350_B_03.UAF)
2022-12-16 2022-350 20:15:10 Updated EOP and reset GEONS clock bias
2022-12-15 2022-349 03:00:55 NICER safed due to ST attitude divergence either from debris moving through FOV or the star tracker imaging\nNICER's head was pointed away from the direction of the debris to aviod contamination.\nRussian EVA on 349 was scrubbed due to leak.\nScience target tracking was resumed at 18:03:15
2022-12-15 2022-349 01:00:00 At ~01:00UTC HOSC received a warning of low pressure in MRM-1 thermal control loop. Shortly after, a large amount of particulate was seen being released from the FGB Nadir Soyuz. Leaking substance is Isooctance or 2,2,4-Trimethylpentane. Leak was pluming in the forward direction, towards the US segment, and more starboard.
2022-12-15 2022-349 23:55:00 Thruster Disable for JEMRMS Ops (M22_349_D_05.UAF)
2022-12-14 2022-348 21:15:00 Russian EVA 56 ABORTED (M22_349_C_05.UAF)
2022-12-14 2022-348 17:10:00 CMG Maneuver to Stage TEA (M22_348_D_03.UAF)
2022-12-14 2022-348 01:30:00 Thruster Disable for JEMRMS Ops (M22_348_B_05.UAF)
2022-12-12 2022-346 11:05:00 Thruster Disable for 82P Hatch Closing (M22_346_A_03.UAF)
2022-12-12 2022-346 01:20:00 Thruster Disable for JEMRMS Ops (M22_346_B_03.UAF)
2022-12-10 2022-344 14:08:00 R Quat at Stage TEA (M22_344_B_08.UAF)
2022-12-10 2022-344 14:08:00 CMG Maneuver to High-Beta Yaw Bias Attitude (M22_344_A_05.UAF)
2022-12-08 2022-342 08:20:00 Thruster Disable for 82P Hatch Opening (H22_342_A_07.UAF)
2022-12-06 2022-340 15:00:00 HOSC turned on NICER survival heater after IROSA install
2022-12-05 2022-339 19:55:00 Thruster Disable for RMCT Checkout (M22_339_A_03.UAF)
2022-12-03 2022-337 00:55:00 Thruster Disable for JEMRMS Ops (M22_337_C_03.UAF)
2022-12-03 2022-337 07:00:00 HOSC Turned off NICER survival heater for IROSA install.
2022-12-03 2022-337 10:37:00 US EVA IROSA 3A Install (M22_337_B_05.UAF) - Panel is on the starboard side of the ISS and near NICER
2022-12-02 2022-336 02:30:00 Thruster Disable for JEMRMS Ops (M22_336_A_05.UAF)
2022-11-30 2022-334 20:30:00 ROBO Ops: SSRMS Mnvr, MT Translate WS 4>1, WO MBS 4, IROSA 3A EVA Setup until 335-03:00
2022-11-30 2022-334 14:15:00 Thruster Disable SPDM Ops and MT Translate WS4 to WS1 (M22_334_B_08.UAF)
2022-11-30 2022-334 11:20:00 81P Reboost (H22_334_A_08.UAF)
2022-11-29 2022-333 21:55:00 Thruster Disable MT Translate WS2 WS4 (M22_333_B_05.UAF)
2022-11-27 2022-331 10:45:00 Cargo Dragon Docking (SpX-26 to N2Z) (M22_331_A_03.UAF)
2022-11-25 2022-329 09:40:00 Russian EVA 56 (H22_329_A_13.UAF)
2022-11-25 2022-329 06:15:00 Thruster Disable for ERA (H22_329_C_05.UAF)
2022-11-17 2022-321 12:00:00 Russian EVA 55 (M22_321_A_06.UAF)
2022-11-16 2022-320 03:17:15 OPM to pXVV with Timeliner Profile 14 (M22_320_A_05.UAF)
2022-11-15 2022-319 10:40:00 US EVA 81 (M22_319_A_09.UAF)
2022-11-15 2022-319 19:30:00 ROBO Ops: Mnvr to Spx-26 Setup until 20:00
2022-11-14 2022-318 21:51:16 OPM to nXVV with Timeliner Profile 6 (M22_318_A_05.UAF)
2022-11-14 2022-318 12:58:00 Thruster Disable SPDM Ops (M22_318_B_03.UAF)
2022-11-13 2022-317 21:30:00 ROBO Ops: Mnvr to EVA Viewing Position until 22:00
2022-11-13 2022-317 18:30:00 MT Translate WS5 to WS2 (M22_317_A_05.UAF) / 17:40 ROBO Ops: Mnvr to Spx-26 Setup until 19:40
2022-11-12 2022-316 15:20:00 MT Translate WS7 to WS5 and SPDM SASA Swap (M22_316_A_03.UAF)
2022-11-11 2022-315 14:55:00 Thruster Disable for SSRMS SASA Setup (M22_315_A_03.UAF)
2022-11-10 2022-314 14:45:00 Thruster Disable for SPDM Ops (M22_314_A_08.UAF)
2022-11-10 2022-314 05:32:00 MT Translate WS4 WS7 (M22_314_B_03.UAF)
2022-11-09 2022-313 16:30:00 Thruster Disable for 82P hatch closing (M22_313_B_07.UAF)
2022-11-09 2022-313 12:20:00 Cygnus18 Install (M22_313_E_05.UAF)
2022-11-09 2022-313 08:00:00 Cygnus18 Capture (M22_313_D_05.UAF)
2022-11-08 2022-312 23:35:17 Updated EOP and reset GEONS clock bias - GEONS not converged
2022-11-08 2022-312 12:53:58 Updated EOP and reset GEONS clock bias - GEONS not converged
2022-11-07 2022-311 15:56:02 Reset NICER star tracker after noticing that imaging was stuck
2022-11-02 2022-306 15:16:47 NICER in safe mode due to low sun angle constraint violation while slewing to TargetID=1970. NICER back collecting science at 15:23:51
2022-11-01 2022-305 09:00:00 Thruster Disable for ERA Mission (H22_305_A_03.UAF)
2022-10-30 2022-303 11:08:38 MPU1 powered off due to SEU. Fully recovered at 22-303-14:04:10
2022-10-28 2022-301 14:27:00 RS OPM to pXVV (H22_301_B_03.UAF)
2022-10-28 2022-301 04:37:00 Thruster Disable for 82P Clamp Install (H22_301_C_03.UAF)
2022-10-28 2022-301 02:20:00 82P Docking MRM2 (M22_301_A_06.UAF)
2022-10-27 2022-300 15:12:00 RS OPM to nXVV (H22_300_A_05.UAF)
2022-10-26 2022-299 02:50:00 MT Translate WS7 to WS4 (M22_299_A_03.UAF)
2022-10-24 2022-297 23:15:00 PDAM Aft Progress 81P MLM Roll (M22_297_B_03.UAF)
2022-10-24 2022-297 14:16:00 Thruster Disable for SPDM Ops (M22_297_A_03.UAF)
2022-10-23 2022-296 21:41:00 80P Undocking with USTO mnvrs (M22_296_A_10.UAF)
2022-10-21 2022-294 11:00:00 Thruster Disable for 80P Hatch Closure (H22_294_A_05.UAF)
2022-10-20 2022-293 09:30:00 Thruster Disable for ERA Mission (H22_293_B_03.UAF)
2022-10-19 2022-292 16:30:00 Thruster Disable for SPDM Ops (M22_292_A_05.UAF)
2022-10-18 2022-291 13:34:00 Thruster Disable MT Translate (M22_291_B_02.UAF)
2022-10-17 2022-290 18:17:00 PDAM Aft Progress MLM Roll (M22_290_B_02.UAF)
2022-10-14 2022-287 15:30:00 Crew Dragon Undocking (Crew-4 from N2Z) (M22_287_R_03.UAF)
2022-10-06 2022-279 19:20:00 Crew Dragon Docking (Crew-5 to N2F) (M22_279_A_03.UAF)
2022-10-01 2022-274 10:15:00 81P Reboost (H22_274_A_10.UAF)
2022-09-29 2022-272 11:31:00 MT Translate WS3 to WS4 (M22_272_B_03.UAF)
2022-09-29 2022-272 06:55:00 67S Undocking on CMG Control (M22_272_A_05.UAF)
2022-09-27 2022-270 13:45:00 Thruster Disable for SPDM Ops (M22_270_A_03.UAF)
2022-09-26 2022-269 14:30:00 CTC3 Unstow Setup - ROBO possibly in FOV until 270-04:30
2022-09-26 2022-269 14:30:00 Thruster Disable for SPDM and 81P Hatch Closure (M22_269_B_07.UAF)
2022-09-26 2022-269 12:50:00 67S Thruster Test (H22_269_C_03.UAF)
2022-09-25 2022-268 13:45:00 Thruster Disable for SPDM Ops (M22_268_A_05.UAF)
2022-09-24 2022-267 10:45:00 Thruster Disable for SPDM Ops (M22_267_A_06.UAF)
2022-09-23 2022-266 13:52:00 Thruster Disable for SPDM Ops (M22_266_A_03.UAF)
2022-09-22 2022-265 05:01:00 US OPM to pXVV with MMO3 (M22_265_A_03.UAF)
2022-09-22 2022-265 15:45:00 Thruster Disable for SPDM Ops (M22_265_B_05.UAF)
2022-09-21 2022-264 16:45:39 68S Docking MRM1 2 Orbit (H22_264_A_05.UAF)
2022-09-21 2022-264 05:32:00 RS OPM to nXVV (H22_264_B_04.UAF)
2022-09-20 2022-263 15:14:11 Updated EOP and reset GEONS clock bias
2022-09-19 2022-262 13:45:00 Thruster Disable for SPDM Ops (M22_262_A_03.UAF)
2022-09-18 2022-261 13:30:00 Thruster Disable for SPDM Ops (M22_261_A_03.UAF)
2022-09-17 2022-260 13:45:00 Thruster Disable for SPDM Ops (M22_260_A_06.UAF)
2022-09-16 2022-259 14:30:00 Thruster Disable for SPDM Ops (M22_259_A_03.UAF)
2022-09-15 2022-258 17:05:00 81P Reboost (H22_258_A_06.UAF)
2022-09-14 2022-257 22:27:00 Thruster Disable for SPDM Ops (M22_257_B_03.UAF)
2022-09-14 2022-257 09:28:00 Thruster Disable for ERA (H22_257_A_03.UAF)
2022-09-13 2022-256 08:35:00 Thruster Disable for ERA (H22_256_A_05.UAF)
2022-09-12 2022-255 14:30:00 Thruster Disable for SPDM Ops (M22_255_A_03.UAF)
2022-09-12 2022-255 14:30:00 CTC3 Unstow Setup - ROBO possibly in FOV until 256-04:30
2022-09-08 2022-251 13:20:00 Thruster Disable for SPDM Ops (M22_251_A_05.UAF)
2022-09-08 2022-251 10:17:15 NICER FSW Action Point 126 tripped (IM reporting MPU4 no data received) causing RTS 65 to power off MPU4.\nNICER was not in SAA or either horn. Likely SEU on the PDB MPU 4 fully recovered at 22-251-12:15:54
2022-09-07 2022-250 01:37:00 Thruster Disable for JEMRMS Ops (M22_250_A_03.UAF)
2022-09-06 2022-249 08:45:00 Thruster Disable 80P Hatch Open (H22_249_B_03.UAF)
2022-09-06 2022-249 02:10:00 Thruster Disable for JEMRMS Ops (M22_249_A_03.UAF)
2022-09-05 2022-248 08:30:00 Thruster Disable 81P Hatch Open (H22_248_A_03.UAF)
2022-09-02 2022-245 11:05:00 RS EVA 54A (M22_245_B_05.UAF)
2022-08-31 2022-243 14:30:00 Thruster Disable for SPDM Ops (M22_243_A_03.UAF)
2022-08-25 2022-237 01:15:00 81P Reboost (H22_237_A_08.UAF)
2022-08-24 2022-236 09:55:00 Thruster Disable for ERA (H22_236_A_03.UAF)
2022-08-22 2022-234 17:30:00 Thruster Disable for MT Translate WS6 3 (M22_234_A_03.UAF)
2022-08-19 2022-231 14:30:00 Cargo Dragon Undocking (SpX-25 from N2F) (M22_231_A_03.UAF)
2022-08-17 2022-229 10:50:00 RS EVA 54 (M22_229_A_05.UAF)
2022-08-15 2022-227 00:21:00 Thruster Disable for JEM RMS Ops (M22_227_A_03.UAF)
2022-08-12 2022-224 00:30:00 Thruster Disable for JEM RMS Ops (M22_224_A_03.UAF)
2022-08-10 2022-222 06:26:00 81P Reboost (H22_222_A_06.UAF)
2022-08-09 2022-221 08:29:00 Thruster Disable for close 80P hatch before EVA 54 (H22_221_A_05.UAF)
2022-08-08 2022-220 14:30:00 Thruster Disable for SPDM Ops MT Translate (M22_220_A_03.UAF)
2022-08-03 2022-215 13:45:00 Thruster Disable for SPDM Ops MT Translate MISSE (M22_215_A_05.UAF)
2022-08-03 2022-215 00:18:45 Deployed NICER Post-MISSE ROBO Ops Day 3
2022-08-02 2022-214 13:45:00 Thruster Disable for SPDM Ops MISSE (M22_214_A_03.UAF)
2022-08-02 2022-214 12:18:32 Stowed NICER for MISSE ROBO Operations Day 3
2022-08-02 2022-214 04:22:16 Deployed NICER Post-MISSE ROBO Ops Day 2.
2022-08-01 2022-213 13:45:00 Thruster Disable for SPDM Ops MISSE and 81P Clamps (M22_213_B_03.UAF)
2022-08-01 2022-213 12:20:20 Stowed NICER for MISSE ROBO Ops Day 2.
2022-08-01 2022-213 05:08:08 Deployed NICER post MISSE ROBO Ops Day 1
2022-07-31 2022-212 13:45:00 Thruster Disable for SPDM Ops MISSE (M22_212_B_03.UAF)
2022-07-31 2022-212 12:20:28 Stowed NICER for MISSE ROBO Ops Day 1
2022-07-30 2022-211 13:45:00 Thruster Disable for SPDM Ops MT Translate MISSE (M22_211_B_03.UAF)
2022-07-29 2022-210 08:32:00 Thruster Disable for ERA (H22_210_A_03.UAF)
2022-07-28 2022-209 08:30:00 Thruster Disable for ERA (H22_209_A_03.UAF)
2022-07-27 2022-208 14:30:00 Thruster Disable for SPDM Operations (MISSE) (M22_208_B_03.UAF)
2022-07-26 2022-207 23:30:00 Thruster Disable for JEMRMS Ops (M22_207_A_04.UAF)
2022-07-25 2022-206 20:55:00 Thruster Disable for JEMRMS Ops (M22_206_A_03.UAF)
2022-07-25 2022-206 10:30:00 Thruster Disable for open 81P hatch (H22_206_B_03.UAF)
2022-07-24 2022-205 13:45:00 Thruster Disable for SPDM ORU Ops (M22_205_A_05.UAF)
2022-07-23 2022-204 13:45:00 MT Translate WS6 to WS7 and SPDM Ops (M22_204_A_05.UAF)
2022-07-22 2022-203 13:45:00 Thruster Disable for SPDM ORU Ops and 80P Clamps (M22_203_B_03.UAF)
2022-07-22 2022-203 01:45:00 Thruster Disable for SPDM ORU Operations (M22_203_A_03.UAF)
2022-07-21 2022-202 11:30:00 RS EVA ESA (M22_202_A_05.UAF)
2022-07-20 2022-201 23:25:00 MT Translate WS7 to WS6 (M22_201_B_06.UAF)
2022-07-20 2022-201 04:40:00 CMG Maneuver to Stage TEA (M22_201_A_05.UAF)
2022-07-16 2022-197 13:25:00 Cargo Dragon Docking (SpX-25 to N2F) (M22_197_B_07.UAF)
2022-07-12 2022-193 15:20:00 Thruster Disable 80P Clamp Removal for ESA EVA (H22_193_A_03.UAF)
2022-07-11 2022-192 23:50:00 Thruster Disable for JEMRMS Ops (M22_192_B_03.UAF)
2022-07-11 2022-192 03:30:00 CMG Maneuver to High-Beta Yaw Bias Attitude (M22_192_A_07.UAF)
2022-07-07 2022-188 16:10:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_188_A_05.UAF)
2022-07-06 2022-187 14:30:00 SPDM ORU Ops RRM3 STPH5 (M22_187_A_05.UAF)
2022-07-05 2022-186 19:45:00 MT Translate WS6 to WS7 and SPDM Ops (M22_186_A_06.UAF)
2022-07-02 2022-183 20:38:00 Thruster Disable for NRAL Deploy (M22_183_A_07.UAF)
2022-07-01 2022-182 00:10:00 Thruster Disable for JEMRMS Ops (M22_182_B_03.UAF)
2022-06-30 2022-181 20:50:00 Dedicated Thruster Firing Test (M22_181_A_07.UAF)
2022-06-28 2022-179 07:35:00 Cygnus17 Release (M22_179_C_03.UAF)
2022-06-28 2022-179 05:49:00 Cygnus17 Unberth (M22_179_B_03.UAF)
2022-06-26 2022-177 07:15:00 US OPM to pXVV with Timeliner Profile 11 (M22_177_A_03.UAF)
2022-06-25 2022-176 03:23:00 US OPM to nXVV with Timeliner Profile 3 (M22_176_B_02.UAF)
2022-06-25 2022-176 16:12:00 Cygnus17 Reboost (M22_176_A_10.UAF)
2022-06-24 2022-175 14:30:00 Thruster Disable 81P Hatch Close (H22_175_B_07.UAF)
2022-06-22 2022-173 08:10:00 Thruster Disable ERA Ops (M22_173_A_03.UAF)
2022-06-21 2022-172 08:20:00 Thruster Disable ERA Ops (M22_172_A_07.UAF)
2022-06-21 2022-172 03:55:00 US OPM to pXVV with Timeliner Profile 11 (M22_172_B_05.UAF)
2022-06-20 2022-171 14:05:00 Cygnus17 Reboost (M22_171_B_05.UAF)
2022-06-19 2022-170 15:43:00 US OPM to nXVV with Timeliner Profile 3 (M22_170_B_03.UAF)
2022-06-16 2022-167 17:53:00 81P PDAM (M22_167_B_02.UAF)
2022-06-10 2022-161 14:45:55 Detector 5-4 looked out of family so we reset it
2022-06-09 2022-160 14:40:00 Thruster Disable for SPDM Ops RPCM R&R Cleanup (M22_160_C_02.UAF)
2022-06-08 2022-159 14:40:00 Thruster Disable for SPDM Ops RPCM R&R (M22_159_C_02.UAF)
2022-06-03 2022-154 19:00:00 Thruster Disable for SPDM Ops (M22_154_D_03.UAF)
2022-06-03 2022-154 11:11:00 81P Docking 2 orb (H22_154_A_08.UAF)
2022-06-03 2022-154 14:27:00 Thruster Disable for 81P hatch opening 2 Orbit (H22_154_B_03.UAF)
2022-06-01 2022-152 07:25:00 79P Undocking on CMG Control (M22_152_A_07.UAF)
2022-05-27 2022-147 08:00:00 79P Prop Purge on CMG Attitude Hold (M22_147_A_03.UAF)
2022-05-27 2022-147 19:10:48 Updated EOP and reset GEONS clock bias
2022-05-25 2022-145 17:30:00 CST-100 Undocking (OFT-2 on N2F) (M22_145_A_05.UAF)
2022-05-20 2022-140 20:00:00 CST-100 Docking (OFT-2 to N2F) (M22_140_A_05.UAF)
2022-05-20 2022-140 10:20:00 CMG Maneuver to Stage TEA (M22_140_B_05.UAF)
2022-05-19 2022-139 13:26:00 NICER Flash Image TMR checks and maintenance.
2022-05-19 2022-139 14:21:00 Thruster Disable for 79P before PrK Leak checks (H22_139_B_05.UAF)
2022-05-16 2022-136 23:05:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_136_A_03.UAF)
2022-05-14 2022-134 17:27:00 79P Reboost (H22_134_A_13.UAF)
2022-05-13 2022-133 09:30:00 Thruster Disable for ERA Operations (H22_133_B_06.UAF)
2022-05-13 2022-133 01:00:00 CMG Maneuver to High-Beta Yaw Bias Attitude (M22_133_A_08.UAF)
2022-05-09 2022-129 04:10:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_129_A_03.UAF)
2022-05-06 2022-126 13:20:00 Thruster Disable for MT Translate WS2 to WS6 (M22_126_A_05.UAF)
2022-05-05 2022-125 08:50:00 Thruster Disable for ERA Operations (H22_125_B_03.UAF)
2022-05-05 2022-125 04:37:00 Dragon Undocking (Crew-3 from N2F) (M22_125_D_02.UAF)
2022-05-05 2022-125 14:40:00 Thruster Disable for 79P Hatch Opening (H22_125_C_03.UAF)
2022-05-02 2022-122 13:10:00 Thruster Disable for 80P Hatch Opening (H22_122_A_06.UAF)
2022-04-28 2022-118 12:35:00 RS EVA 53 (M22_118_C_09.UAF)
2022-04-27 2022-117 22:25:00 Crew Dragon Docking (Crew-4 to N2Z) (M22_118_D_03.UAF)
2022-04-26 2022-116 05:05:00 ROBO Parked Post Translate in NICER FOV until 22-126-13:20
2022-04-26 2022-116 02:05:00 MT Translate WS4 to 2 (M22_116_A_03.UAF)
2022-04-25 2022-115 18:40:00 MT Translate WS6 to 4 (M22_115_C_03.UAF)
2022-04-25 2022-115 00:20:00 Dragon Undocking (Axiom-1 from N2Z) (M22_115_B_03.UAF)
2022-04-23 2022-113 12:15:00 Aft Progress PDAM/Reboost (M22_113_A_02.UAF)
2022-04-19 2022-109 15:56:00 Updated EOP and reset GEONS clock bias
2022-04-18 2022-108 12:05:00 RS EVA 52 (M22_108_A_11.UAF)
2022-04-16 2022-106 09:37:00 Thruster Disable for 79P hatch closing (M22_106_A_05.UAF)
2022-04-14 2022-104 19:00:00 Thruster Disable for MT Translate WS4 6 (M22_104_B_05.UAF)
2022-04-13 2022-103 14:20:00 Thruster Disable for MT Translate WS2 4 (M22_103_C_03.UAF)
2022-04-10 2022-100 09:45:00 Thruster Disable for 80P hatch closing (H22_100_A_05.UAF)
2022-04-09 2022-099 11:30:00 Added commanding to load to look starboard from 99-11:30 to 99-11:55 due to Axiom-1 docking at N2Z.
2022-04-09 2022-099 09:55:00 Dragon Docking (Axiom-1 to N2Z) (M22_099_B_03.UAF)
2022-04-05 2022-095 17:32:00 Science downtime between 22-095-17:32 and22-095-17:40 (8 minutes) due timing of the ATS switchover
2022-04-01 2022-091 08:15:00 Thruster Disable for open hatch 79P (H22_091_A_03.UAF)
2022-03-31 2022-090 23:40:00 ROBO Parked MT Translate Config until 22-103-15:20. Parked in NICER FOV.
2022-03-30 2022-089 06:20:00 65S Undocking with USTO mnvrs (M22_089_B_03.UAF)
2022-03-26 2022-085 12:35:00 65S Thruster test
2022-03-26 2022-085 19:00:00 Ops: MT Translate 6 to 2 - ROBO in FOV until 095-17:45
2022-03-26 2022-085 18:05:00 MT Translate WS6 2
2022-03-25 2022-084 01:16:00 GMT 084 Thruster Disable JEMRMS Ops
2022-03-24 2022-083 02:25:00 GMT 083 Thruster Disable JEMRMS Ops
2022-03-23 2022-082 08:53:00 US EVA RBVM Jumper Install
2022-03-19 2022-078 06:39:00 RS OPM to pXVV
2022-03-18 2022-077 18:39:00 67S Docking RSN 2 Orbit
2022-03-18 2022-077 05:51:00 RS OPM to -XVV
2022-03-16 2022-075 03:02:00 Thruster Disable for MT Translate 2 to 6
2022-03-15 2022-074 07:57:00 US EVA IROSA Prep 3A
2022-03-11 2022-070 23:17:58 Updated EOP and reset GEONS clock bias
2022-03-11 2022-070 18:25:00 79P Reboost
2022-03-10 2022-069 23:30:00 Thruster Disable JEMRMS Ops
2022-03-09 2022-068 16:10:00 Thruster Disable for MT Translate WS7 2
2022-03-08 2022-067 00:00:00 Thruster Disable JEMRMS Ops
2022-03-06 2022-065 22:50:00 Thruster Disable JEMRMS Ops
2022-03-03 2022-062 20:55:00 Thruster Disable JEMRMS Ops
2022-03-02 2022-061 15:40:00 Thruster Disable for SPDM RRM and POA
2022-03-01 2022-060 22:10:00 MT Translate WS4 7
2022-02-28 2022-059 23:38:00 Thruster Disable JEMRMS Ops
2022-02-26 2022-057 00:47:00 79P Reboost
2022-02-22 2022-053 10:30:00 Thruster Disable for 79P hatch closing
2022-02-21 2022-052 11:21:00 Cygnus17 Install
2022-02-21 2022-052 07:30:00 Cygnus17 Capture
2022-02-17 2022-048 09:25:00 Thruster Disable 80P Clamp Install
2022-02-17 2022-048 04:50:00 80P Docking to MRM2
2022-02-08 2022-039 07:06:00 79P Reboost
2022-02-07 2022-038 19:10:00 Thruster Disable MT WS2 to WS4
2022-02-07 2022-038 14:30:00 Ops: Walkoff to MBS3, Mnvr to translate config - ROBO in FOV until 038-18:30
2022-02-05 2022-036 21:58:00 MPU7 SEU caused all MPU7 detectors to be offline. Recovered at 036-23:23.
2022-02-04 2022-035 01:55:00 Thruster Disable for JEMRMS Ops (M22_035_A_03.UAF)
2022-02-03 2022-034 15:00:00 Thruster Disable SPDM BCDU MT WS7 to WS2 (M22_034_A_09.UAF)
2022-02-03 2022-034 03:15:00 Thruster Disable for JEMRMS Ops (M22_034_B_07.UAF)
2022-02-03 2022-034 15:00:00 Ops: MT Translate WS 7 to WS 2 - ROBO in FOV until 034-22:00
2022-02-02 2022-033 18:00:00 Thruster Disable SPDM MT WS7 to WS2 (MT Translate Cancelled) (M22_033_A_05.UAF)
2022-02-01 2022-032 18:00:00 Thruster Disable SPDM Ops (M22_032_A_08.UAF)
2022-02-01 2022-032 07:30:00 SM Thruster Test (H22_032_B_03.UAF)
2022-01-31 2022-031 18:00:00 Thruster Disable SPDM POA Inspection (M22_031_A_08.UAF)
2022-01-31 2022-031 13:26:14 Updated EOP and reset GEONS clock bias
2022-01-27 2022-027 15:40:00 X2R20 Day 3 GNC Transition to GNC R14 (M22_027_A_06.UAF)
2022-01-26 2022-026 03:05:00 Thruster Disable JEMRMS Ops (M22_026_A_03.UAF)
2022-01-24 2022-024 12:45:00 Thruster Disable for open hatch 79P (M22_024_B_03.UAF)
2022-01-23 2022-023 15:05:00 Dragon Undocking (SpX-24 from N2Z) (M22_023_A_03.UAF)
2022-01-20 2022-020 16:30:47 Pointed NICER starboard during SpX-24 Thruster Hot Fire Testing.  Science plan was stopped at  22-020-16:30:47z and resumed at 22-020-17:36:48
2022-01-20 2022-020 01:25:00 Thruster Disable JEMRMS (M22_020_A_03.UAF)
2022-01-19 2022-019 10:15:00 RS EVA 51 (H22_019_A_05.UAF)
2022-01-18 2022-018 14:50:00 Thruster Disable MT Translate WS4 to WS7 (M22_018_A_05.UAF)
2022-01-15 2022-015 16:00:00 Thruster Disable for 79P Hatch Closure (H22_015_B_05.UAF)
2022-01-15 2022-015 00:30:00 Thruster Disable MT Translate WS3 to WS4 (M22_015_A_03.UAF)
2022-01-14 2022-014 15:40:00 Ops: SPDM Stow, Triple Walkoff, MT translate 3 to 4. Impacts NICER FOV until 22-015-04:00
2022-01-12 2022-012 23:15:00 Thruster Disable JEMRMS (M22_012_B_07.UAF)
2022-01-12 2022-012 17:40:00 79P Reboost (H22_012_A_05.UAF)
2022-01-11 2022-011 19:40:00 ROBO Parked for SPX24 Day 3 in our FOV. Impacts until 22-014-15:40
2022-01-11 2022-011 12:10:00 Ops: SPX24 Day 3 STP-H7 Install. Impacts NICER FOV until 22-011-19:40
2022-01-10 2022-010 16:10:00 ROBO Parked for SPX24 Day 2 in our FOV. Impacts until 22-011-12:10
2022-01-10 2022-011 11:10:00 Thruster Disable SPDM Operations (M22_011_A_10.UAF)
2022-01-10 2022-010 10:25:00 Ops: SPX24 Day 2 ASIM Transfer. Impacts NICER FOV until 22-010-16:10
2022-01-08 2022-008 08:00:00 Ops: ASIM Relocate Setup. Impacts NICER FOV until 09:00
2022-01-08 2022-008 09:00:00 ROBO Parked for ASIM Relocate in our FOV. Impacts until 22-010-10:25
2022-01-07 2022-007 15:40:00 Thruster Disable SPDM JEM RMS and MT Translate WS5 to WS3 (M22_007_A_06.UAF)
2022-01-05 2022-005 14:55:00 Thruster Disable SPDM Ops and MT Translate WS7 to WS5 (M22_005_A_03.UAF)
2021-12-30 2021-364 00:45:00 Thruster Disable MISSE Cont and MT Trans WS2 to WS7
2021-12-29 2021-363 03:49:17 Performed FSW Target Manager App update to version 2.0.0 at 21-363-03:49:17z to support future OHMAN ToOs.
2021-12-28 2021-362 14:40:00 Thruster Disable SPDM MISSE Day3
2021-12-28 2021-362 13:05:00 Stowed NICER because of MISSE Ops Day 3. Configured for background measurements. Science resumed at 21-363-04:04:23
2021-12-27 2021-361 14:40:00 Thruster Disable SPDM MISSE Day2
2021-12-27 2021-361 12:42:22 Stowed NICER because of MISSE Ops Day 2. Configured for background measurements. Science resumed at 21-362-06:26:33
2021-12-26 2021-360 17:12:00 Thruster Disable SPDM MISSE Day1
2021-12-26 2021-360 12:45:13 Stowed NICER because of MISSE Ops Day 1. Configured for background measurements. Science resumed at 21-361-07:16:50.
2021-12-24 2021-358 07:52:00 RS OPM to pXVV
2021-12-24 2021-358 00:28:00 79P Deboost
2021-12-22 2021-356 21:43:00 PAO Undocking
2021-12-22 2021-356 06:54:00 Cargo Dragon Docking (SpX-24 to N2Z)
2021-12-20 2021-354 14:03:50 Updated EOP and reset GEONS clock bias
2021-12-19 2021-353 23:00:00 66S Undocking on CMG Control from MRM2
2021-12-17 2021-351 14:55:00 MT Translate WS4 to WS2 and SPDM
2021-12-16 2021-350 07:25:00 66S Thruster test
2021-12-16 2021-350 03:15:00 CMG Maneuver to Stage TEA
2021-12-11 2021-345 20:40:00 Yaw Bias Maneuver
2021-12-10 2021-344 15:10:00 MT Translate WS6 to WS4
2021-12-09 2021-343 14:30:00 MT Translate WS7 to WS6 and SPDM Ops
2021-12-09 2021-343 00:57:00 RS OPM to pXVV
2021-12-08 2021-342 13:12:00 66S Docking
2021-12-08 2021-342 01:24:00 RS OPM to nXVV
2021-12-06 2021-340 02:36:00 Thruster Disable JEMRMS Ops
2021-12-03 2021-337 06:48:00 79P 180 Degree PDAM
2021-12-03 2021-337 15:48:00 OPM to pXVV with Timeliner Profile 13
2021-12-02 2021-336 09:15:00 US EVA P1 SASA RnR
2021-12-01 2021-335 15:58:26 Reset the star tracker to clear stuck imaging that started at 21-334-22:38:46
2021-11-28 2021-332 16:50:00 MT Translate WS5 to WS7
2021-11-27 2021-331 03:02:00 RS OPM to pXVV
2021-11-26 2021-330 14:52:00 6R Docking MLM with Reduced RS Master Time
2021-11-26 2021-330 00:56:00 US OPM to nXVV with Timeliner Profile 6
2021-11-25 2021-329 10:25:00 78P Undocking with USTO mnvrs
2021-11-23 2021-327 22:42:00 Thruster Disable For SPDM
2021-11-22 2021-326 15:30:00 Thruster Disable SPDM and MT Translate WS7 to WS5
2021-11-21 2021-325 22:10:00 Thruster Disable MT Translate WS5 to WS7
2021-11-20 2021-324 13:30:00 Cygnus16 Release
2021-11-20 2021-324 11:55:00 Cygnus16 Unberth
2021-11-18 2021-322 16:25:00 Thruster Disable MT Translate WS6 to WS5
2021-11-17 2021-321 14:30:00 MT Translate WS7 to WS6 STPH6 Disposal
2021-11-16 2021-320 17:45:00 Thruster Disable MT Translate WS3 to WS7
2021-11-11 2021-315 22:00:00 Crew-3 Dragon Docking to N2F
2021-11-10 2021-314 19:05:00 PDAM Aft Progress MLM Roll
2021-11-09 2021-313 14:02:17 Updated EOP and reset GEONS clock bias
2021-11-08 2021-312 18:40:00 Dragon Undocking - physical sep at 19:05:00
2021-11-04 2021-308 16:35:00 Desat Enable
2021-11-03 2021-307 16:35:55 Stopped NICER science plan and pointed starboard for Crew-2 thruster fire test. Science plan resumed at 17:02:27
2021-11-03 2021-307 15:00:00 Crew-2 Thruster Test on US Control - thruster fire at 16:40
2021-10-29 2021-302 21:45:00 79P Docking Reduced RS Master Time to SM Aft
2021-10-27 2021-300 07:00:00 MLM Thruster Test on RS Control
2021-10-22 2021-295 00:55:00 78P Docking Reduced RS Master Time to MLM
2021-10-20 2021-293 22:30:00 78P Undocking with USTO mnvrs
2021-10-18 2021-291 04:42:00 78P Prop Purge in Momentum Management MRM2
2021-10-17 2021-290 00:40:00 64S Undocking
2021-10-15 2021-288 09:13:00 LoAC Response - High ISS attitude error leading to Loss of CMG Attitude Control and Loss of ISS Attitude Control\nAt 0913 we were in a declared LOAC that reached a max attitude of 58deg negative pitch @ 0924.\nADCO reported stationed returned to its correct attitude @ 0955.\nPOIC resumed normal operations @ 1007 with command enablement’s back in place by 1009.\nPossible SA obstructions until about 22:00
2021-10-15 2021-288 08:45:00 SW Thruster Disable for 64S Thruster Test Part 2 - NICER viewed the CRAB during this time. Attitude may be off nominal due to anomaly described in next row.
2021-10-13 2021-286 08:45:00 64S Thruster Test
2021-10-13 2021-286 01:15:00 Thruster Disable for JEMRMS Ops
2021-10-12 2021-285 06:18:00 SM Reboost
2021-10-12 2021-285 01:05:00 Thruster Disable for JEMRMS Deploy
2021-10-07 2021-280 18:25:00 Thruster Disable MT Translate WS2 5
2021-10-07 2021-280 01:57:00 Thruster Disable for JEMRMS Ops
2021-10-05 2021-278 23:25:00 Thruster Disable for JEMRMS Ops
2021-10-05 2021-278 11:03:00 65S Docking 2 orbit
2021-10-04 2021-277 15:30:00 Thruster Disable SPDM Ops
2021-10-04 2021-277 14:12:00 Updated EOP and reset GEONS clock bias
2021-09-30 2021-273 18:20:00 Thruster Disable SPDM Ops
2021-09-30 2021-273 12:24:00 Dragon Undocking (SpX-23 from N2F)
2021-09-30 2021-273 17:20:00 RMCT2 Stow, Manvr to RELL Setup - ROBO arm may be in and out of NICER FOV until 273-22:20
2021-09-29 2021-272 04:39:00 NICER team suspects ISS structure blockage for a minute around this time.
2021-09-29 2021-272 02:26:00 OPM to pXXV with Timeliner Profile 13
2021-09-29 2021-272 13:52:00 Thruster Disable for 78P Clamp Install
2021-09-29 2021-272 22:45:00 Thruster Disable for JEMRMS Ops
2021-09-28 2021-271 14:19:00 Thruster Disable for 64S Clamp Install
2021-09-28 2021-271 11:20:00 64S Relocate with USTO Maneuvers - HOSC turned off power to NICER preheaters during this activity
2021-09-27 2021-270 19:00:00 Thruster Disable for JEMRMS Ops
2021-09-25 2021-268 13:19:00 64S Thruster Test on MM
2021-09-24 2021-267 13:33:00 SM Deboost
2021-09-24 2021-267 06:13:00 OPM to nXVV with Timeliner Profile 6
2021-09-23 2021-266 14:35:00 Thruster Disable for 78P Clamp Removal
2021-09-23 2021-266 04:49:28 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-09-22 2021-265 05:23:15 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-09-22 2021-265 22:20:00 Thruster Disable for SPDM Ops
2021-09-22 2021-265 18:47:03 NICER STOW for ROBO/MISSE Ops -background data collection
2021-09-21 2021-264 18:43:00 NICER STOW for ROBO/MISSE Ops -background data collection
2021-09-21 2021-264 22:10:00 Thruster Disable for SPDM Ops
2021-09-20 2021-263 21:30:00 Thruster Disable for JEMRMS Ops EFU Transfer
2021-09-20 2021-263 10:30:00 Dedicated Thruster Firing Test
2021-09-20 2021-263 00:28:00 Thruster Disable for JEMRMS Ops SFA Unstow
2021-09-17 2021-260 19:30:00 Thruster Disable MT Translate WS7 to WS2 - ROBO arm may be in and out of NICER FOV until 261-00:00
2021-09-17 2021-260 02:50:00 Thruster Disable MMOD Strike Survey
2021-09-16 2021-259 23:12:00 NICER star tracker imaging stuck until ST reset commanded at 21-260-12:04:57
2021-09-14 2021-257 19:55:00 Thruster Disable ZCAM Stow and MT Translate WS5 to WS7
2021-09-13 2021-256 17:49:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-17:49 to 18:09
2021-09-13 2021-256 14:47:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-14:47 to 15:04
2021-09-12 2021-255 09:58:00 4A IROSA Prep EVA and 78P Hatch Open
2021-09-11 2021-254 17:50:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-17:50 to 18:11
2021-09-11 2021-254 16:36:07 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-16:36 to 16:47
2021-09-11 2021-254 18:08:00 SM Reboost
2021-09-10 2021-253 16:15:00 Thruster Disable ZCAM Extract and MT Translate WS7 WS5
2021-09-09 2021-252 16:18:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-252-16:18 to 16:46
2021-09-09 2021-252 13:15:00 RS EVA 50
2021-09-03 2021-246 12:50:00 RS EVA 49
2021-08-30 2021-242 12:55:00 Dragon Docking (SpX-23 to N2F)
2021-08-27 2021-239 04:32:00 NICER star tracker imaging stuck until ST reset commanded at 12:02:07
2021-08-26 2021-238 19:45:00 MT Translate and SPDM Ops
2021-08-26 2021-238 06:35:00 Thruster Disable for RS EVA 49 Prep
2021-08-23 2021-235 22:33:46 Updated EOP and Reset GEONS Clock Bias
2021-08-21 2021-233 03:14:00 SM Reboost
2021-08-21 2021-233 13:34:00 Thruster Disable MT Translate WS7 WS5 and SPDM Operations
2021-08-20 2021-232 16:30:00 Thruster Disable ZCAM Extract
2021-08-16 2021-228 22:48:00 Thruster Disable MT Translate WS4 WS7
2021-08-12 2021-224 12:04:00 Cygnus16 Install
2021-08-12 2021-224 08:05:00 Cygnus16 Capture (M21_224_A_03.UAF)
2021-08-11 2021-223 16:22:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-16:22:14 to 21-223-21:32. After this 16:22 attempt, NICER was misconfigured (GCE motors at their soft stops), so targetting was not happening until 21:32 when it was corrected.
2021-08-11 2021-223 11:42:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-11:43:06 to 11:59:41
2021-08-10 2021-222 21:47:27 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-21:47:27 to 22:05:43
2021-08-10 2021-222 12:27:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-12:28:03 to 12:54:16
2021-08-09 2021-221 13:36:00 Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-221-13:13:10 to 13:38:03.
2021-08-08 2021-220 09:46:06 MPU 5 powered off after AP#127(No data received) tripped during passage through SAA. MPU 5 recovery complete at 220-10:40:39
2021-08-06 2021-218 19:10:00 GMT218Thruster Disable MT Translate WS6 WS4
2021-07-30 2021-211 03:00:00 OPM to pXVV with Timeliner Profile 13
2021-07-30 2021-211 15:20:00 MLM Vent on RS Control
2021-07-29 2021-210 16:34:00 LoAC Contingency Response - High ISS attitude rates due to anomlous MLM thurster firings
2021-07-29 2021-210 11:05:00 MLM Docking with USTO Maneuver
2021-07-29 2021-210 16:49:00 Recover on RS thrusters
2021-07-29 2021-210 16:49:01 "-XVV +ZLV TEA"
2021-07-29 2021-210 17:28:00 ISS back to planned attitude
2021-07-28 2021-209 14:20:00 Thruster Disable MT Translate WS7 WS6
2021-07-26 2021-207 09:47:00 77P Undocking with DC-1 on RS control
2021-07-22 2021-203 15:27:51 Updated EOP and Reset GEONS Clock Bias
2021-07-22 2021-203 15:21:11 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to nominal detector config.
2021-07-22 2021-203 07:30:00 OPM to nXVV with Timeliner Profile 1
2021-07-21 2021-202 10:10:00 Crew-2 Port Relocate N2F to N2Z
2021-07-20 2021-201 09:40:00 Thruster Disable MT Translate WS4 to WS7
2021-07-20 2021-201 07:00:00 CMG Mnvr to Stage TEA
2021-07-19 2021-200 21:34:44 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,1-5,1-6,1-7,2-1,2-3,2-4,2-5,2-6,2-7,2-8,3-2,3-4,3-5,3-6,3-7,3-8,4-1,4-2,4-3,4-5,4-6,4-7,4-8,5-1,5-2,5-3,5-4,5-5,5-6,5-7,6-1,6-2,6-3,6-4,6-5,6-6,6-7,7-2,7-3,7-4,7-5,7-6,7-7,7-8.
2021-07-18 2021-199 16:41:00 OPM to pXVV with Timeliner Profile 7
2021-07-18 2021-199 14:30:00 CMG Mnvr to nXVV Stage TEA
2021-07-18 2021-199 22:00:00 CMG Mnvr pXVV Yaw Bias
2021-07-11 2021-192 09:00:00 CMG Mnvr nXVV Yaw Bias
2021-07-11 2021-192 03:01:00 OPM to nXVV with Timeliner Profile 2
2021-07-10 2021-191 16:25:00 CMG Mnvr to Stage TEA
2021-07-09 2021-190 15:18:00 CMG Mnvr pXVV Yaw Bias
2021-07-08 2021-189 14:30:00 NICER commanded to joint target mode to look away from planned Dragin departure. NICER back on science targeting at 14:56:00
2021-07-08 2021-189 14:00:00 Dragon Undocking (SpX-22 from PMA-3)
2021-07-08 2021-189 08:00:00 78P Zenith Progress Thruster Test
2021-07-07 2021-188 08:50:00 78P Zenith Progress Thruster test
2021-07-06 2021-187 14:09:30 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,2-1,2-3,2-5,2-6,3-2,3-5,3-6,3-7,4-1,4-2,4-3,4-6,5-1,5-2,5-3,5-7,6-1,6-2,6-3,6-4,7-2,7-3,7-6,7-7.
2021-07-06 2021-187 14:57:00 NICER commanded to joint target mode to look away from planned Dragin departure. Departure delayed until DOY 189. NICER back on science targeting at 15:13:39
2021-07-02 2021-183 03:20:00 Thruster Disable after 78P Docking Clamp Install
2021-07-02 2021-183 01:02:16 78P Docking (M21_183_A_08.UAF)
2021-07-02 2021-183 05:35:00 Mom Mgmt Mnvr to 78P post dock TEA
2021-07-02 2021-183 11:18:00 OPM to pXVV with Timeliner Profile 7
2021-07-01 2021-182 15:10:00 OPM to nXVV with Timeliner Profile 1
2021-06-30 2021-181 19:30:00 Thruster Disable for IPA Stow in Dragon
2021-06-29 2021-180 16:25:00 Cygnus-15 Release (M21_180_B_03.UAF)
2021-06-29 2021-180 11:56:00 Cygnus-15 Unberth (M21_180_A_03.UAF)
2021-06-26 2021-177 13:55:00 Thruster Disable MT Trans and IPA Stow POA
2021-06-25 2021-176 06:42:18 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6.
2021-06-25 2021-176 04:01:58 NICER Safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-176-05:55:32
2021-06-25 2021-176 01:59:00 IROSA P6 EVA 3
2021-06-24 2021-174 01:35:00 77P Reboost
2021-06-24 2021-174 23:16:30 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to enabling all nominal detectors
2021-06-23 2021-174 01:55:00 Thruster Disable JEM RMS SSOD Xfer Day2
2021-06-22 2021-173 17:15:27 Updated EOP and Reset GEONS Clock Bias.
2021-06-22 2021-173 14:51:24 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6.
2021-06-22 2021-173 02:30:00 Thruster Disable JEM RMS SSOD Xfer Day1
2021-06-20 2021-171 02:55:00 IROSA P6 EVA 2
2021-06-16 2021-167 14:05:23 Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,2-1,2-3,3-2,3-4,4-1,4-2,5-1,5-2,6-1,6-2,7-2,7-3.
2021-06-16 2021-167 04:23:00 IROSA P6 EVA 1
2021-06-15 2021-166 01:25:00 Thruster Disable JEM RMS NRCSD Xfer Day2
2021-06-14 2021-165 20:57:20 Science plan modified detector config for TARGETID=5220 to 1-3,2-4,3-5,4-2,5-2,6-3,7-3 enabled
2021-06-14 2021-165 15:08:58 Science plan modified detector config for TARGETID=5220 to that in use with RTS08
2021-06-14 2021-165 13:05:00 Thruster Disable for IPA Unstow MT Translate WS4 to WS8
2021-06-12 2021-163 22:55:32 Science plan modified detector config for TARGETID=5220 to 1-1,1-2,1-3,2-1,2-3,2-4,3-2,3-4,3-5,4-1,4-2,4-3,5-1,5-2,5-3,5-8,6-1,6-2,6-3,6-8,7-2,7-3,7-4,7-8 enabled
2021-06-12 2021-163 04:15:00 Science plan modified detector config for TARGETID=5220 to that in use with RTS08
2021-06-11 2021-162 22:10:00 Possible NICER FOV Obstruction due to ROBO activity 21-162-22:10- 21-163-02:10
2021-06-11 2021-162 19:40:00 Thruster Disable for IPA POA Install
2021-06-10 2021-161 18:45:00 Thruster Disable for IPA Extract
2021-06-08 2021-159 13:26:00 Thruster Disable for MT Translate WS2 to WS4
2021-06-07 2021-158 14:30:00 Possible NICER FOV Obstruction due to ROBO activity 21-158-14:30 - 21-153-21:30
2021-06-07 2021-158 14:30:00 Thruster Disable for SPDM Stow
2021-06-05 2021-156 07:24:00 Dragon Docking (SpX-22 to PMA-3)
2021-06-02 2021-153 03:35:00 RS EVA 48
2021-05-28 2021-148 13:30:00 Thruster Disable RPCM R&R SPDM Ops
2021-05-27 2021-147 18:25:00 Thruster Disable RMCT Unstow SPDM Ops
2021-05-27 2021-147 13:50:00 Possible NICER FOV Obstruction due to ROBO activity 21-147-18:25 - 21-147-23:35
2021-05-24 2021-144 18:45:00 Possible NICER FOV Obstruction due to ROBO activity 21-144-18:45 - 21-144-22:00
2021-05-24 2021-144 17:46:00 Thruster Disable MT Translate WS4-2
2021-05-23 2021-143 00:00:00 Possible NICER FOV Obstruction due to ROBO activity, times unknown.
2021-05-20 2021-140 16:10:00 77P Reboost (H21_140_A_03.UAF)
2021-05-20 2021-140 14:15:00 CMG Maneuver to Stage TEA (M21_140_C_03.UAF)
2021-05-19 2021-139 13:30:00 Updated EOP and Reset GEONS Clock Bias.
2021-05-18 2021-138 00:20:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_138_A_03.UAF)
2021-05-17 2021-137 14:10:00 NICER detector TECs commanded to max temp setpoints. Ops team had forgotten to do this after MISSE operations in April. TECs cooled to nominal setpoints from April 25th to today.
2021-05-17 2021-137 00:21:00 NICER safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-137-13:51:15
2021-05-13 2021-133 21:30:00 CMG Maneuver to High-Beta Yaw Bias Attitude
2021-05-10 2021-130 23:50:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude
2021-05-07 2021-127 19:52:00 Thruster Disable MAC MT Translate WS3-4
2021-05-07 2021-127 13:15:00 Reset star tracker after imaging got stuck a while ago
2021-05-04 2021-124 14:30:00 Thruster Disable MT Translate WS2-3 and SPDM Ops
2021-05-03 2021-123 15:00:00 Thruster Disable MT Translate WS7-2 and SPDM Ops
2021-05-03 2021-123 14:30:00 Possible NICER FOV Obstruction due to ROBO activity 21-123-14:30 - 21-123-21:30
2021-05-02 2021-122 00:00:00 Dragon Undocking (Crew-1 from PMA-3) - physical sep at 00:35
2021-04-29 2021-119 14:30:00 Possible NICER FOV Obstruction due to ROBO activity 21-119-14:30 - 21-119-20:30
2021-04-28 2021-118 13:23:00 Reset star tracker after imaging got stuck a while ago
2021-04-27 2021-117 22:40:00 75P Undocking on CMG Control from SM Aft
2021-04-26 2021-116 14:30:00 Thruster Disable for MISSE Stow
2021-04-25 2021-115 09:03:38 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-04-25 2021-115 19:16:00 75P Prop Purge on CMG Attitude Hold
2021-04-24 2021-114 21:30:00 Possible NICER FOV Obstruction due to ROBO activity 21-114-21:30 - 21-115-00:30
2021-04-24 2021-114 14:43:00 Software Thruster Disable MISSE Transfer MT WS2 to WS7
2021-04-24 2021-114 13:05:34 NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed
2021-04-24 2021-114 07:35:00 Dragon Docking (Crew-2 to PMA-2)
2021-04-24 2021-114 01:04:22 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-04-23 2021-113 01:03:06 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-04-23 2021-113 21:30:00 Possible NICER FOV Obstruction due to ROBO activity 21-113-21:30 - 21-114-14:30
2021-04-23 2021-113 14:30:00 Software Thruster Disable MISSE Transfer Hinge Closure
2021-04-23 2021-113 13:14:11 NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed
2021-04-22 2021-112 13:04:05 NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed
2021-04-22 2021-112 09:10:00 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-04-22 2021-112 14:30:00 Software Thruster Disable MTT Flip and MISSE Transfer
2021-04-21 2021-111 14:30:00 Software Thruster Disable MISSE Transfer
2021-04-21 2021-111 13:21:58 NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed
2021-04-21 2021-111 06:30:00 Dedicated Thruster Firing Test (M21_111_B_03.UAF)
2021-04-20 2021-110 10:59:28 NICER re-deploy post-ROBO/MISSE Operations - science resumed
2021-04-20 2021-110 05:15:22 NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed
2021-04-20 2021-110 03:00:00 Possible NICER FOV Obstruction due to ROBO activity 21-110-03:00 - 21-110-05:00
2021-04-19 2021-109 14:00:00 Software Thruster Disable MISSE Ops
2021-04-19 2021-109 08:45:00 Thruster Disable for 75P hatch close
2021-04-17 2021-107 01:30:00 63S Undocking on CMG Control from MRM2
2021-04-13 2021-103 09:00:00 Thruster Test 63S
2021-04-13 2021-103 17:00:00 Thruster Disable for MT Translate WS6 to WS4
2021-04-12 2021-102 13:30:00 Thruster Disable for MT Translate WS2 to WS6
2021-04-09 2021-099 10:43:00 64S Docking 2 orbit
2021-04-09 2021-099 13:53:00 Updated EOP and reset GEONS Clock Bias
2021-04-07 2021-097 11:10:00 75P Clamp Install Thruster Disable
2021-04-06 2021-096 21:55:00 Thruster Disable for JEMRMS Ops SFA Stow
2021-04-05 2021-095 09:55:00 Crew-1 Port Relocate N2F to N2Z
2021-04-02 2021-092 11:39:00 75P Reboost
2021-03-31 2021-090 19:55:00 Thruster Disable for JEMRMS Ops EFU Transfer
2021-03-27 2021-086 22:20:00 Thruster Disable for JEMRMS Ops EFU Transfer
2021-03-25 2021-084 00:17:00 Thruster Disable for JEMRMS Ops SFA Unstow
2021-03-23 2021-083 17:00:00 Thruster Disable for MT Translate WS5 WS2
2021-03-23 2021-082 18:00:00 Possible NICER FOV Obstruction due to ROBO activity 21-082-18:00 - 21-083-00:00
2021-03-23 2021-082 01:55:00 Thruster Disable for JEMRMS Ops
2021-03-22 2021-081 01:30:00 Thruster Disable for JEMRMS Ops
2021-03-20 2021-079 03:46:00 RS OPM to pXVV
2021-03-19 2021-078 16:03:00 63S Relocate MRM1 to MRM2
2021-03-19 2021-078 02:52:00 RS OPM to nXVV
2021-03-16 2021-075 15:05:00 Thruster Disable 63S Thruster Test
2021-03-15 2021-074 02:30:00 Thruster Disable for JEMRMS Ops
2021-03-14 2021-073 05:03:00 Thruster Disable for JEMRMS Ops
2021-03-13 2021-072 09:38:00 ISS Upgrades EVA 3.5
2021-03-12 2021-071 18:29:00 75P Reboost
2021-03-11 2021-070 13:20:00 EP9 Jettison MCS Configuration
2021-03-11 2021-070 01:30:00 Thruster Disable for SPDM Ops EP Unstow
2021-03-10 2021-069 20:13:00 Thruster Disable for MT Translate WS7 to WS5
2021-03-05 2021-064 10:10:00 ISS Upgrades III EVA
2021-03-05 2021-064 18:18:00 HOSC removed power to J3AB which is NICER's survival heater power circuit to support EVA for ISS power upgrades
2021-03-02 2021-061 18:18:00 Updated EOP and reset GEONS Clock Bias
2021-03-01 2021-060 18:30:00 Thruster Disable for SPDM (MT translate aborted)
2021-02-28 2021-059 07:56:00 IROSA Prep EVA
2021-02-27 2021-058 20:23:00 Thruster Disable for MT Translate WS3 to WS7
2021-02-22 2021-053 11:44:00 Cygnus15 Install (M21_053_A_03.UAF)
2021-02-22 2021-053 09:40:00 Cygnus15 Capture (M21_052_A_07.UAF)
2021-02-19 2021-050 15:06:00 Commanded TOO of the Crab for alignment checks
2021-02-17 2021-048 06:20:00 77P Docking 34orbit (H21_048_A_07.UAF)
2021-02-16 2021-047 16:58:00 Commanded all MPU TEC temperature setpoints to max setpoint
2021-02-15 2021-046 21:30:00 CMG Maneuver to Stage TEA (M21_046_A_03.UAF)
2021-02-12 2021-043 09:06:00 Commanded MPU4 and MPU1 all detectors to max TEC temp setpoint
2021-02-12 2021-043 14:15:00 Commanded MPU4 detectors temp setpoints to nominal values
2021-02-12 2021-043 11:45:00 Commanded MPU1 all detectors to nominal TEC temp setpoint
2021-02-09 2021-040 05:21:00 76P Undocking with USTO Mnvrs (M21_040_A_11.UAF)
2021-02-09 2021-040 04:20:00 76P departure maneauver to +ZVV 21-040-04:20:01 - 21-040-04:40:00, Undocking 21-040-05:18 - 21-040-05:22:10, maneuaver to +XVV 21-040-05:28:01 - 21-040-05:58:00
2021-02-09 2021-040 09:30:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_040_B_03.UAF)
2021-02-09 2021-040 07:30:00 HOSC ISS APS anomaly resulting in corrupt NICER data being sent to the SPOCC. Data outage lasts until the end of the DOY. Also, DOY 041 data was very ratty due to same anomaly. Data unrecoverable.
2021-02-02 2021-033 16:00:00 Thruster Disable MT Translate WS2 toWS3 (M21_033_A_07.UAF)
2021-02-02 2021-033 14:20:00 MPU 4-5 detector annealing completed
2021-02-01 2021-032 16:08:00 Updated EOP and reset GEONS Clock Bias
2021-02-01 2021-032 09:25:00 ISS Upgrades II EVA (M21_032_A_05.UAF)
2021-01-31 2021-031 08:30:00 Possible NICER FOV Obstruction due to ROBO activity 21-031-08:30 - 21-031-18:30
2021-01-31 2021-031 06:15:00 Thruster Disable for SPDM and MT Translate WS7 to WS2 (M21_031_A_09.UAF)
2021-01-30 2021-030 10:55:00 Thruster Disable for SPDM 4A3 Robotics (M21_030_A_05.UAF)
2021-01-29 2021-029 16:40:00 Thruster Disable for SPDM and MT Translate WS2 to WS7 (M21_029_A_07.UAF)
2021-01-29 2021-029 16:25:00 Possible NICER FOV Obstruction due to ROBO activity 21-029-16:25 - 21-030-02:40
2021-01-28 2021-028 22:30:00 Thruster Disable for MT Translate WS3 to WS2 (M21_028_A_07.UAF)
2021-01-28 2021-028 14:40:00 Possible NICER FOV Obstruction due to ROBO activity 21-028-14:30 - 21-029-02:30
2021-01-27 2021-027 10:06:00 COL Upgrades EVA (M21_027_A_05.UAF)
2021-01-26 2021-026 14:22:00 MPU 4-5 detector annealing started
2021-01-21 2021-021 15:25:00 75P Reboost (H21_021_A_07.UAF)
2021-01-21 2021-021 02:45:00 Thruster Disable for JEMRMS Ops (M21_021_C_05.UAF)
2021-01-19 2021-019 23:00:00 Thruster Disable for JEMRMS Ops (M21_019_B_03.UAF)
2021-01-18 2021-018 14:15:00 Thruster Disable for MT Translate WS2 to WS3 (M21_018_A_03.UAF)
2021-01-12 2021-012 22:00:00 Thruster Disable for JEMRMS Ops (M21_012_A_07.UAF)
2021-01-12 2021-012 13:40:00 Dragon Undocking (SpX-21 to PMA-3) (M21_012_B_02.UAF)
2021-01-11 2021-011 13:55:00 Aborted SpaceX-21 Undocking (M21_011_B_02.UAF)
2021-01-10 2021-010 14:15:00 Dragon Thruster Test on RS control (SpX-21 to PMA-3) (M21_010_A_03.UAF)
2021-01-08 2021-008 18:10:00 Thruster Disable for MT Translate WS5 to WS2 (M21_008_A_05.UAF)
2021-01-08 2021-008 14:40:00 Possible NICER FOV Obstruction due to SpaceX-21 undock setup 21-008-14:30 - 21-008-23:05
2021-01-06 2021-006 15:10:00 Cygnus-14 Release (M21_006_B_03.UAF)
2021-01-06 2021-006 10:48:00 Cygnus-14 Unberth (M21_006_A_03.UAF)
2021-01-05 2021-005 18:54:00 Observed the crab for calibration purposes. Modified PC parameters table to adjust the star tracker to instrument boresight alignment matrix
2020-12-29 2020-364 20:02:00 75P Hatch Open/Close Thruster Disable
2020-12-28 2020-363 23:00:00 Thruster Disable for JEMRMS Ops
2020-12-28 2020-363 02:46:55 NICER MPU 4 anomalous power off while in SAA
2020-12-26 2020-361 19:24:00 75P Hatch Closure Thruster Disable
2020-12-23 2020-358 18:00:00 NICER activated and redeployed. Science resumed at 22:30:19
2020-12-19 2020-354 22:35:00 GMT354 Nanoracks Airlock Extraction and Install
2020-12-19 2020-354 18:36:00 CMG Maneuver to Stage TEA
2020-12-19 2020-354 04:15:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude
2020-12-18 2020-352 00:36:47 NICER activation after ISS circuit 4B recovery, but immediately powered off when SPARTAN reported issues still with circuit 4B.
2020-12-13 2020-348 23:00:00 Thruster Disable for JEMRMS Ops
2020-12-13 2020-348 17:25:00 NICER activated, stowed and deactivated via ISS power circuit 4A until circuit 4B anomaly can be figured out
2020-12-12 2020-347 09:40:00 ISS 4B power circuit failure on the ISS which powered off NICER
2020-12-11 2020-346 05:10:00 CMG Maneuver to High Beta Yaw Bias Attitude
2020-12-10 2020-345 02:35:00 CMG Maneuver to Mid-Beta Yaw Bias Attitude
2020-12-09 2020-344 14:35:00 Thruster Disable for MT Trans WS7 to WS5
2020-12-08 2020-343 19:20:00 Thruster Disable for SPDM
2020-12-07 2020-342 19:49:00 MPU 4-5 detector annealing completed
2020-12-07 2020-342 17:43:00 Stopped science plan and pointed NICER starboard to avoid any contamination that could come from the docking Dragon thruster plumes. Science plan resumed at 18:45:12
2020-12-07 2020-342 16:55:00 Dragon Docking (SpX-21 to PMA-3)
2020-12-07 2020-342 19:53:00 MPU 2-7 detector annealing started
2020-12-04 2020-339 09:12:00 63S Thruster test
2020-12-03 2020-338 17:01:00 Updated GPS GEONS EOP and reset
2020-12-03 2020-338 00:55:00 Thruster Disable for JEMRMS Ops
2020-11-29 2020-334 16:00:00 Thruster Disable for MISSE Ops Day5
2020-11-28 2020-333 02:54:45 NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed
2020-11-27 2020-332 15:30:00 Thruster Disable for MISSE Ops Day4
2020-11-27 2020-332 14:06:48 NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed
2020-11-26 2020-331 07:12:01 NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed
2020-11-25 2020-330 00:10:13 NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed
2020-11-24 2020-329 18:35:00 Thruster Disable for MISSE Ops Day1-3
2020-11-23 2020-328 16:39:00 MPU 2-8 detector annealing completed
2020-11-23 2020-328 11:12:00 Thruster Disable for 75P Clamp Install and Hatch Open
2020-11-23 2020-328 16:42:00 MPU 4-5 detector annealing started
2020-11-21 2020-326 07:49:34 NICER processor reset based on exception in task tXbdServiceat. SEU in SAA. Science resumed at 326-10:28:06
2020-11-19 2020-324 21:03:00 Thruster Disable for MISSE Ops Setup
2020-11-18 2020-323 12:45:00 Russian EVA 47
2020-11-16 2020-321 14:24:00 MPU 2-8 detector annealing started
2020-11-16 2020-321 14:24:00 MPU 1-1 detector annealing completed
2020-11-16 2020-321 14:17:00 NICER Star Tracker reset from ground after imaging got stuck
2020-11-16 2020-321 02:25:00 Dragon Docking (Crew-1 to PMA-2)
2020-11-12 2020-317 18:45:00 75P Reboost
2020-11-10 2020-315 16:12:00 Updated GPS GEONS EOP and reset
2020-11-09 2020-314 17:15:00 63S Thruster Test on MM
2020-11-09 2020-314 16:28:00 MPU 1-1 detector annealing started
2020-11-09 2020-314 16:24:00 MPU 1-2 detector annealing completed
2020-11-07 2020-312 03:52:02 NICER Star Tracker reset from ground after imaging got stuck
2020-11-06 2020-311 01:50:00 Thruster Disable JEMRMS NRCSD Stow
2020-11-05 2020-310 01:01:00 Thruster Disable JEMRMS NRCSD Deploy
2020-11-04 2020-309 00:25:00 Thruster Disable JEM RMS SFA Stow
2020-11-02 2020-307 13:49:00 MPU 1-2 detector annealing started
2020-11-02 2020-307 13:47:00 MPU 1-3 detector annealing completed
2020-10-30 2020-304 12:49:00 NICER Safe Mode due to GCE Overcurrent trip, near SAA
2020-10-30 2020-304 01:35:00 Thruster Disable JEM RMS HXP Transfer
2020-10-27 2020-301 21:55:00 Thruster Disable for SPDM Checkout
2020-10-26 2020-300 14:29:00 MPU 1-3 detector annealing started
2020-10-26 2020-300 14:27:00 MPU 1-4 detector annealing completed
2020-10-22 2020-296 07:30:00 SPDM Ops RRM Day3 and JEM RMS Ops
2020-10-22 2020-296 03:35:00 63S Thruster Test on MM
2020-10-21 2020-295 23:32:00 62S Undocking on US Control
2020-10-20 2020-294 13:55:00 SPDM Ops RRM Day2
2020-10-19 2020-293 14:40:00 SPDM Ops RRM Day1
2020-10-19 2020-293 00:25:00 Thruster Disable for JEM RMS SFA Unstow
2020-10-19 2020-293 16:47:00 MPU 1-5 detector annealing completed
2020-10-19 2020-293 16:55:00 MPU 1-4 detector annealing started
2020-10-17 2020-291 07:45:00 62S Thruster test
2020-10-15 2020-289 02:35:00 NICER Safe Mode due to GCE Overcurrent trip, near SAA
2020-10-14 2020-288 08:52:27 63S Docking with Reduced RS Master Timeline
2020-10-12 2020-286 15:46:00 MPU 1-5 detector annealing started
2020-10-12 2020-286 15:45:00 MPU 1-6 detector annealing completed
2020-10-08 2020-282 03:40:00 MT Translate WS3 to WS7
2020-10-07 2020-281 11:02:00 OPM to pXVV with Timeliner Profile 7
2020-10-07 2020-281 08:26:00 75P Deboost
2020-10-06 2020-280 21:05:00 OPM to nXVV with Timeliner Profile 2
2020-10-05 2020-279 16:08:00 MPU 1-7 detector annealing completed
2020-10-05 2020-279 09:20:00 Cygnus-14 Capture
2020-10-05 2020-279 11:08:00 Cygnus-14 Install
2020-10-05 2020-279 16:12:00 MPU 1-6 detector annealing started
2020-10-02 2020-275 14:31:00 Updated GPS GEONS EOP and reset
2020-10-01 2020-275 13:40:00 Thruster Disable for 75P Hatch Closing
2020-09-28 2020-272 13:58:00 MPU 1-7 detector annealing started
2020-09-28 2020-272 13:49:00 MPU 1-8 detector annealing completed
2020-09-22 2020-266 21:19:00 PDAM Aft Progress Prog Roll
2020-09-21 2020-265 17:40:00 MT Translate WS5 to WS3
2020-09-21 2020-265 16:12:00 MPU 1-8 detector annealing started
2020-09-21 2020-265 16:03:00 MPU 5-5 detector annealing completed
2020-09-18 2020-262 18:42:00 MT Translate WS2 to WS5
2020-09-18 2020-262 13:15:00 Possible NICER FOV Obstruction due to ROBO activity 20-262-13:15 - 20-262-20:40
2020-09-16 2020-260 15:02:00 SPDM Ops RELL Install
2020-09-14 2020-258 14:40:00 SPDM Ops RELL Unstow
2020-09-14 2020-258 16:28:00 MPU 5-6 detector annealing completed
2020-09-14 2020-258 16:38:00 MPU 5-5 detector annealing started
2020-09-11 2020-255 16:20:00 Thruster Disable for SPDM MISSE Cleanup
2020-09-11 2020-255 14:00:00 Possible NICER FOV Obstruction due to ROBO activity 20-255-14:00 - 20-255-23:50
2020-09-10 2020-254 19:46:00 75P Reboost
2020-09-04 2020-248 20:26:00 MPU 5-6 detector annealing started
2020-09-04 2020-248 01:45:00 Thruster Disable for JEMRMS NREP Transfer
2020-09-03 2020-247 21:49:00 NICER Star Tracker reset from ground after imaging got stuck
2020-09-03 2020-247 21:36:00 NICER Deploy post-SPDM MISSE Ops Day 3 - Science Resumed
2020-09-03 2020-247 13:55:00 Thruster Disable for SPDM MISSE Ops Day 3
2020-09-02 2020-246 23:53:00 NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed
2020-09-02 2020-246 13:55:00 Thruster Disable for SPDM MISSE Ops Day 2
2020-09-02 2020-246 12:29:00 NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed
2020-09-02 2020-247 12:17:00 NICER Stow for SPDM MISSE Ops Day 3 - Detectors being annealed
2020-09-01 2020-245 03:30:00 Thruster Disable for JEMRMS NREP Transfer
2020-09-01 2020-245 14:40:00 Thruster Disable for SPDM MISSE Ops Day 1
2020-09-01 2020-245 12:23:00 NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed
2020-09-01 2020-245 22:43:00 NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed
2020-09-01 2020-245 22:28:00 Updated GPS GEONS EOP and reset
2020-08-28 2020-241 15:31:00 MPU 5-7 detector annealing started
2020-08-28 2020-241 15:15:00 MPU 5-8 detector annealing completed
2020-08-24 2020-237 14:00:00 MT Translate WS5 to WS2 and SPDM Unstow RMCT2
2020-08-21 2020-234 14:40:00 MPU 5-8 detector annealing started
2020-08-21 2020-234 14:30:00 MPU 5-1 detector annealing completed
2020-08-21 2020-234 13:25:00 MT Translate WS3 to WS5
2020-08-18 2020-231 14:25:00 HTV9 Release
2020-08-18 2020-231 13:00:00 HTV9 Unberth
2020-08-14 2020-227 15:02:00 MPU 5-1 detector annealing started
2020-08-14 2020-227 14:57:00 MPU 5-4 detector annealing completed
2020-08-07 2020-220 12:34:00 MPU 5-2 detector annealing completed
2020-08-07 2020-220 13:25:00 MPU 5-4 detector annealing started
2020-08-06 2020-219 13:21:00 Modified RTS 241 to include disabling detectors 4-5 and 5-4 at low sun angles
2020-08-04 2020-217 14:23:00 Modified RTS 243 to disable detector 5-4 at low sun angles
2020-08-01 2020-214 23:00:00 Dragon Undocking
2020-07-31 2020-213 20:19:00 MPU 5-2 detector annealing started
2020-07-31 2020-213 19:14:00 MPU 5-3 detector annealing complete
2020-07-31 2020-213 00:55:00 Thruster Disable for JEM RMS SA Stow
2020-07-30 2020-211 17:30:00 Thruster Disbale for MT Translate WS5 to WS3
2020-07-29 2020-211 23:05:00 Thruster Disable for JEM RMS HXP Transfer
2020-07-29 2020-211 12:36:00 75P Reboost
2020-07-29 2020-211 01:10:00 Thruster Disable for JEM RMS SFA
2020-07-27 2020-209 12:57:00 MPU 5-4 detector annealing completed
2020-07-27 2020-209 16:30:00 MPU 5-3 detector annealing started
2020-07-24 2020-206 05:36:00 OPM to +XVV with Timeliner Profile 9
2020-07-23 2020-205 20:29:00 MPU 5-4 detector annealing started
2020-07-23 2020-205 17:47:52 76P Docking 2 orbit with Reduced RS Master Timeline
2020-07-23 2020-205 17:22:00 MPU 5-4 detector annealing completed
2020-07-23 2020-205 06:22:00 OPM to -XVV with Timeliner Profile 5
2020-07-22 2020-204 17:21:00 MPU 5-4 detector annealing started
2020-07-22 2020-204 14:10:00 Possible NICER FOV Obstruction due to ROBO activity 20-204-14:10 - 20-204-17:10
2020-07-22 2020-204 14:10:00 Thruster Disable for SSRMS and MT Translate WS1 to WS5
2020-07-21 2020-203 09:45:00 S6 EVA 3B 2
2020-07-21 2020-203 04:00:00 CMG Maneuver to Stage TEA
2020-07-20 2020-202 14:37:00 MPU 5-4 detector was misbehaving at low SUn anlges. Turned it off a few times. Updated RTS 243 to disable MPU 5-4 at low sun angles
2020-07-18 2020-200 12:45:00 CMG Maneuver to mid-Beta Yam Bias Attitude
2020-07-16 2020-198 09:45:00 S6 Battery EVA 3B 1
2020-07-14 2020-196 03:25:00 Thruster Disable for NRCSD Day 2
2020-07-13 2020-195 08:00:00 Thruster Disable for NRCSD Day 1
2020-07-13 2020-195 04:10:00 CMG Manuever to high-Beta Yaw Bias Attitude
2020-07-12 2020-194 04:21:00 CMG Manuever to mid-Beta Yaw Bias Attitude
2020-07-12 2020-194 02:01:00 OPM to +XVV with Timeliner Profile 10
2020-07-11 2020-193 18:25:00 75P Deboost
2020-07-11 2020-193 08:58:00 OPM to -XVV with Timeliner Profile 5
2020-07-11 2020-193 06:55:00 CMG Maneuver to Stage TEA
2020-07-10 2020-192 19:00:00 CMG Manuever to mid-Beta Yaw Bias Attitude
2020-07-10 2020-192 14:30:00 Possible NICER FOV Obstruction due to ROBO activity 20-192-14:30 - 20-192-18:00
2020-07-10 2020-192 12:30:00 RPCM P32B A MT Translate WS5 to WS1 and SPDM Ops
2020-07-08 2020-190 18:23:30 74P Undocking with USTO Mnvrs (+XVV)
2020-07-08 2020-190 21:00:00 RPCM P32B A R&R MT Translate WS7 to WS5
2020-07-07 2020-189 16:00:00 Thruster Disable for 74P Clamp Removal and SPDM Ops
2020-07-06 2020-188 13:54:00 Thruster Disable MT Translate WS1 to WS5
2020-07-06 2020-188 14:00:00 Possible NICER FOV Obstruction due to ROBO activity 20-188-14:00 - 20-188-17:00
2020-07-06 2020-188 23:13:00 Thruster Disable MT Translate WS5 to WS7
2020-07-03 2020-185 14:35:00 PDAM - 75P Aft Progress- Prog Roll
2020-07-01 2020-183 09:20:00 S6 Battery EVA 1B 2
2020-06-26 2020-178 09:45:00 S6 Battery EVA 1B 1
2020-06-24 2020-176 15:00:00 Possible NICER FOV Obstruction due to ROBO activity 20-176-15:00 - 20-176-19:30
2020-06-24 2020-176 14:03:00 MT Translate WS5 to WS1 and EP Unstow
2020-06-23 2020-175 16:00:00 Thruster Disable for SPDM Red Eye Deploy with MT Translate WS7 to WS5
2020-06-22 2020-174 18:40:00 Thruster Disable for SPDM Ops
2020-06-17 2020-169 13:25:00 Thruster Disable for SPDM Red Eye Deploy
2020-06-12 2020-164 00:55:00 Thruster Disable for JEMRMS Ops
2020-06-11 2020-163 02:20:00 Thruster Disable for JEMRMS Ops
2020-06-08 2020-160 18:52:00 Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters
2020-06-04 2020-156 18:40:00 SPDM Battery Bolt Ops Day 1
2020-06-03 2020-155 21:10:00 MT Translate WS5 to WS7
2020-06-02 2020-154 23:55:00 Thruster Disable for EFU Adapter Transfer
2020-06-01 2020-153 20:40:00 EP Swap Day 2 and SFA Unstow
2020-05-31 2020-152 18:24:00 MT Translate WS7 to WS5 and EP Swap Day 1
2020-05-31 2020-152 14:29:56 Dragon Docking to PMA2
2020-05-26 2020-147 00:35:00 Thruster Disable for JEMRMS Ops
2020-05-25 2020-146 17:32:00 MT Translate WS5 to WS7
2020-05-25 2020-146 14:09:00 HTV9 Install
2020-05-25 2020-146 12:15:00 HTV9 Capture
2020-05-21 2020-142 23:00:00 CMG Maneuver to Stage TEA
2020-05-18 2020-139 20:55:00 CMG Maneuver to Yaw Bias Attitude
2020-05-14 2020-135 19:14:00 CMG Maneuver to Yaw Bias Attitude
2020-05-11 2020-132 15:15:00 Cygnus 13 Release
2020-05-11 2020-132 11:45:00 Cygnus 13 Unberth
2020-05-11 2020-132 21:20:00 CMG Maneuver to Yaw Bias Attitude
2020-05-08 2020-129 14:10:00 MT Translate WS6 to WS5
2020-05-08 2020-129 02:10:00 Thruster Disable for JEMRMS Ops
2020-05-07 2020-128 14:35:00 HDEV Transfer to NG13
2020-05-06 2020-127 21:03:32 NICER Safe mode due to invalid GPS signals (Science downtime from 20-127-21:03:32 - 21:27:37.
2020-05-05 2020-126 22:03:00 Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters
2020-05-05 2020-126 14:25:00 MT Translate WS3 to WS6
2020-04-29 2020-120 01:20:00 Thruster Disable for JEMRMS JSSOD Deploy
2020-04-28 2020-119 02:20:00 Thruster Disable for JEMRMS JSSOD Deploy
2020-04-25 2020-116 04:46:00 75P Docking 2 orbit
2020-04-25 2020-116 16:10:00 OPM to +XVV with Timeliner Profile 7
2020-04-25 2020-116 06:40:00 Thruster Disable for 75P Clamp Install
2020-04-24 2020-115 20:00:39 OPM to -XVV with Timeliner Profile 2
2020-04-19 2020-110 08:18:00 OPM to +XVV with Timeliner Profile 7
2020-04-19 2020-110 04:55:00 NICER Safe mode due to invalid GPS signals (Science downtime from 20-110-04:55 - 05:24.
2020-04-19 2020-110 04:10:00 -XVV SM Deboost
2020-04-18 2020-109 18:20:00 OPM to -XVV with Timeliner Profile 2
2020-04-17 2020-108 01:23:00 61S Undocking on CMG Control from SM Aft (physical sep at 01:53:30)
2020-04-10 2020-101 01:00:00 US OPM to +XVV with Profile 7
2020-04-09 2020-100 12:11:00 62S Docking MRM2
2020-04-09 2020-100 03:18:00 US OPM to -XVV with Profile 1
2020-04-07 2020-098 09:35:00 SpaceX-20 Unberth
2020-04-07 2020-098 11:23:00 SpaceX-20 Release (Release at 13:05:00)
2020-04-02 2020-093 11:50:00 74P Reboost
2020-04-01 2020-092 19:55:00 Thruster Disable SPDM Ops (Bart Install)
2020-03-31 2020-091 14:35:00 Thruster Disable SPDM and MT Translate WS6 to WS3 (Bart Setup and Fit Check)
2020-03-25 2020-085 12:45:28 Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters
2020-03-24 2020-084 20:30:00 Thruster Disable for Bart Extract
2020-03-23 2020-083 14:40:00 Thruster Disable for MISSE Cleanup
2020-03-20 2020-080 22:10:00 MT Translate WS2 to WS6 MTT Install
2020-03-20 2020-080 06:42:36 NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #4
2020-03-20 2020-080 06:02:12 Background Data Collection ended for re-deploy
2020-03-19 2020-079 20:25:00 Thruster Disable for MSC Transfers
2020-03-19 2020-079 19:34:36 Background Data Collection started
2020-03-19 2020-079 19:02:25 NICER stowed for Day #4 of MISSE ROBO Ops
2020-03-19 2020-079 16:24:00 74P Reboost
2020-03-19 2020-079 06:14:37 NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #3
2020-03-19 2020-079 05:36:28 Background Data Collection ended for re-deploy
2020-03-18 2020-078 06:36:13 NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #2
2020-03-18 2020-078 05:54:50 Background Data Collection ended for re-deploy
2020-03-18 2020-078 13:07:35 Stowed NICER for MISSE ROBO Ops Day #3
2020-03-18 2020-078 13:36:23 Background Data Collection started
2020-03-18 2020-078 13:55:00 Thruster Disable for MSC transfers
2020-03-17 2020-077 13:55:00 Thruster Disable for MSC transfers
2020-03-17 2020-077 13:20:57 Background Data Collection started
2020-03-17 2020-077 12:37:40 NICER stowed for Day #2 of MISSE ROBO Ops
2020-03-17 2020-077 06:51:47 NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #1
2020-03-17 2020-077 06:12:04 Background Data Collection ended for re-deploy
2020-03-16 2020-076 13:50:00 Thruster Disable for MSC transfers
2020-03-16 2020-076 13:13:03 Background Data Collection started
2020-03-16 2020-076 12:35:01 Stowed NICER for MISSE ROBO Ops
2020-03-13 2020-073 18:30:00 Thruster Disable for MISSE reconfig MT Translate
2020-03-12 2020-072 23:00:00 Thruster Disable for MTT Extract
2020-03-11 2020-071 22:31:00 Thruster disable for MISSE Setup
2020-03-09 2020-069 11:00:00 SpaceX-20 Capture and Install
2020-03-06 2020-066 06:50:57 NICER safe mode due to invalid GPS signals. Science was resumed at 2020-066-07:28:40.
2020-03-04 2020-064 06:46:16 NICER safe mode due to invalid GPS signals. Science was resumed at 2020-064-12:56:54.
2020-02-21 2020-052 14:30:00 ICS Jettison Robotics
2020-02-21 2020-052 01:50:00 JEMRMS Ops ICS Transfer
2020-02-20 2020-051 00:59:00 NRCSD to JEM AL
2020-02-19 2020-050 00:10:00 NRCSD to Deploy
2020-02-18 2020-049 17:00:00 Noticed on ISS camera feed that there is some peeling of the silver teflon on the Star tracker baffle. Looking through archival off ISS photos it looks like this began sometime between Feb and May 2019.
2020-02-18 2020-049 09:05:00 Cygnus 13 Capture and Install
2020-02-13 2020-044 14:31:55 Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters
2020-02-06 2020-037 05:50:30 59S Undocking on CMG Control from MRM2
2020-02-03 2020-034 12:20:00 59S Thruster Test on MM
2020-02-03 2020-034 14:45:00 SPDM Ops and Double MT Translate 4-6-7
2020-02-03 2020-034 16:25:00 NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings.  16:25:25 - 16:57:35 and 17:59:17 - 18:16:11 and 19:30:21 - 19:50:25 and 21:06:01 - 21:23:20
2020-01-31 2020-031 20:50:00 MT Translate WS6 - 4
2020-01-31 2020-031 18:48:06 NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings.  18:48:06 - 19:05:13 and 20:19:16 - 20:34:49.
2020-01-31 2020-031 13:00:00 Cygnus NG-12 Release (Release at 14:35)
2020-01-31 2020-031 10:20:00 Cygnus NG-12 Unberth
2020-01-30 2020-030 23:25:00 SFA Stow
2020-01-30 2020-030 00:58:00 Cyclops Install to JEM AL
2020-01-28 2020-028 22:45:00 Cyclops Deploy Maneuver and STPSat4 Deploy
2020-01-28 2020-028 01:22:00 SFA Extract
2020-01-27 2020-027 16:00:00 MT Translate WS2 - 6
2020-01-26 2020-026 05:18:51 MPU 4 powered off due to Limit Check Action Point 126 trip (IM reported data from MPU4 not received for 8 seconds)
2020-01-25 2020-025 10:05:32 NICER Stow for AMS EVA #4 - background data collection begins at 10:44:18
2020-01-25 2020-025 08:54:00 AMS EVA 4
2020-01-25 2020-025 19:23:19 NICER Re-deploy after AMS EVA #4. Background collection stopped at 18:48:45
2020-01-23 2020-023 13:40:00 74P Double Reboost
2020-01-22 2020-022 18:25:00 MT Translate WS7 to 2
2020-01-21 2020-021 16:25:00 MT Translate WS8 to WS7 and EP Stow
2020-01-20 2020-020 08:50:00 P6 Battery EVA 4
2020-01-15 2020-015 16:38:00 Pointed NICER in the direction of the astronaut EVA until 16:55.
2020-01-15 2020-015 08:50:00 P6 Battery EVA 3
2020-01-14 2020-014 15:40:00 EP Unstow with MT WS7-8 and NTEA Mnvr
2020-01-14 2020-014 14:45:00 NICER in Safemode after manual reset of the star tracker. The ST attitude was invalid due to an incorrect AGS7 load earlier at 14:31 which didn't account for ISS structure obstruction so some observations (namely PSR_J0437-4715_opt1) were obstructed until the load was replaced at 21:40. NICER left safe mode at 15:30.
2020-01-13 2020-013 19:52:00 MT Translate WS6-7
2020-01-13 2020-013 19:38:14 Attempted to track NGC_4151 rising through Earth's limb. Science plan resumed at 19:51:56.
2020-01-11 2020-011 14:10:00 X2R18 Day 3 GNC and S3P3 Transitions
2020-01-10 2020-010 18:39:00 Interrupted science timeline to view NGC 4151 as it rose behind the Earth.  Also, attempted to track Crab Pulsar as it set, but it was slightly out of Azimuth range. Science plan resumed at 19:25:01.
2020-01-07 2020-007 04:35:00 SpaceX-19 Unberth
2020-01-07 2020-007 06:36:00 SpaceX-19 Release
2020-01-06 2020-006 20:14:00 Reset the star tracker to clear up issue with storing images
2020-01-04 2020-004 14:45:00 NG12 Solar Transfer
2020-01-03 2020-003 18:13:24 Reset GEONS clock bias which includes updated Earth Orientation Parameters
2020-01-03 2020-003 15:25:00 NG12 SDS Transfer
2019-12-31 2019-365 10:28:00 RS OPM DTO to +XVV
2019-12-30 2019-364 08:25:00 RS OPM DTO to -XVV
2019-12-27 2019-361 00:36:00 74P Nadir Progress Double Reboost
2019-12-23 2019-357 17:24:55 Interrupted science timeline to view Herc_X1 as it rose behind the Earth, but ISS arrays were obstructing the view. Science plan resumed at 17:39:35
2019-12-22 2019-356 17:00:00 SpaceX-19 Cargo Day 5
2019-12-21 2019-355 06:21:00 CMG Maneuver to Stage TEA
2019-12-18 2019-352 02:10:00 JEMRMS NREP Transfer Day 1
2019-12-18 2019-354 03:00:00 JEMRMS NREP Transfer Day 2
2019-12-17 2019-351 13:50:00 CMG Maneuver to Stage TEA
2019-12-17 2019-351 05:15:00 CMG Maneuver to Yaw Bias Attitude
2019-12-17 2019-351 16:30:00 SpaceX-19 Cargo Day 4 MT Translate WS2 to WS6
2019-12-17 2019-351 23:35:00 CMG Maneuver to Yaw Bias Attitude
2019-12-16 2019-350 16:10:00 SpaceX-19 Cargo Day 3 MT Translate WS6 to WS2
2019-12-16 2019-350 13:30:00 CMG Maneuver to Stage TEA
2019-12-13 2019-347 08:16:00 CMG Maneuver to Yaw Bias Attitude
2019-12-12 2019-346 21:30:00 SpaceX-19 Cargo Day 2
2019-12-11 2019-345 22:00:00 SpaceX-19 Cargo Day 1 and JEMRMS Ops
2019-12-10 2019-344 23:42:00 SpaceX-19 Cargo Setup MT Translate WS2 to WS6
2019-12-09 2019-343 10:35:13 74P Docking on DC-1 49 orbit
2019-12-08 2019-342 10:30:00 SpaceX-19 Capture
2019-12-03 2019-337 17:00:00 Double MT Translate 2-6-2
2019-12-02 2019-336 10:10:56 Stowed NICER for AMS EVA #3. Background data colletion begins.
2019-12-02 2019-336 19:01:27 Redeploy and science plan resumed after AMS Cooling System Repair EVA #3. Background data collection halted.
2019-11-29 2019-333 10:25:30 73P Undocking with USTO Mnvrs
2019-11-26 2019-330 14:11:59 Earth Limb Crab Observations attempted throughout the day
2019-11-22 2019-326 18:38:31 Redeploy and science plan resumed after AMS Cooling System Repair EVA #2. Background data collection halted.
2019-11-22 2019-326 10:26:45 Stowed NICER for AMS EVA #2. Background data colletion begins.
2019-11-21 2019-325 14:41:00 Dedicated Thruster Firing Test
2019-11-20 2019-324 18:38:22 Reset GEONS clock bias which includes updated Earth Orientation Parameters
2019-11-18 2019-322 16:48:01 Switched to GEONS for GPS. It had been using SPS since after the EVA.
2019-11-15 2019-319 19:24:21 Redeploy and science plan resumed after AMS Cooling System Repair EVA #1. Background data collection halted.
2019-11-15 2019-319 10:41:02 Stowed NICER for AMS EVA #1. Background data colletion begins.
2019-11-13 2019-317 15:40:00 Stow RMCT2 MT Translate WS6-2
2019-11-12 2019-316 15:50:00 MT Translate WS2-6 with MTT Install
2019-11-12 2019-316 00:23:18 Redeploy and science plan resumed after ROBO Ops Day 4 for MISSE conclude for the day. Background data collection halted.
2019-11-12 2019-316 02:30:01 NICER Limit checker action point 48 (DI:ST|GPS reports data invalid) failed putting NICER is safe mode (AZ=0, EL=-90).  Further analysis showed GPS SPS was invalid for more than 5 minutes.  +Z antenna had 4 GPS signals but -Z antenna had none.  This was most likely due to blockage due to ROBO Dextre arm being parked close to NICER after MISSE MSC extract/install operations.
2019-11-11 2019-315 12:09:38 Stow for MISSE MSC Transfer Operations by ROBO Day 4 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins.
2019-11-10 2019-314 06:40:24 Redeploy and science plan resumed after ROBO Ops Day 2 for MISSE conclude for the day. Background data collection halted.
2019-11-10 2019-314 12:17:48 Stow for MISSE MSC Transfer Operations by ROBO Day 3 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins.
2019-11-10 2019-314 22:15:01 Redeploy and science plan resumed after ROBO Ops Day 3 for MISSE conclude for the day. Background data collection halted.
2019-11-09 2019-313 12:17:01 Stow for MISSE MSC Transfer Operations by ROBO Day 2 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins.
2019-11-09 2019-313 07:58:14 Redeploy and science plan resumed after ROBO Ops for MISSE conclude for the day.  Background data collection halted.
2019-11-08 2019-312 12:47:59 Stow for MISSE MSC Transfer Operations by ROBO - Note: ROBO was in their MSC Transfer Park Position since 311/22:40 which obscured many NICER observations.  Background data collection begins.
2019-11-07 2019-311 23:55:00 MTT Extract with MT Translate WS6-2
2019-11-07 2019-311 21:45:00 Reboost Nadir Progress 73P
2019-11-06 2019-310 18:10:00 MT Translate WS3 to WS6
2019-11-04 2019-308 09:10:00 Cygnus12 Capture
2019-11-01 2019-305 12:45:00 HTV-8 Unberth and release(17:20:00)
2019-10-29 2019-302 14:20:00 MT Translate WS7 to WS3
2019-10-19 2019-292 17:13:00 Reactivation and Redeploy. Back on Science Plan
2019-10-18 2019-291 NaN Battery Charge/Discharge Unit EVA
2019-10-13 2019-286 03:15:00 Turned on NICER Pre-heaters in prep for extended power off
2019-10-13 2019-286 11:19:00 Stopped Science Plan for Stow and Deactivation for RPCM R&R and Battery EVA
2019-10-11 2019-284 NaN P6 Battery EVA 2
2019-10-09 2019-282 12:26:00 Returned to Target Pointing
2019-10-09 2019-282 11:45:00 Went to Joint Angle Mode to point away from Freon Venting
2019-10-06 2019-279 NaN P6 Battery EVA 1
2019-10-03 2019-276 07:37:30 58S Undocking from MRM1
2019-09-30 2019-273 19:35:00 GMT 273-275 MT Translate WS5-7 JEM RMS and Battery Get Ahead Day 1
2019-09-30 2019-273 09:35:00 EP Swap Day 2
2019-09-29 2019-272 07:55:00 EP Swap Day 1 and 58S Thruster Test
2019-09-28 2019-271 11:15:00 HTV-8 Capture
2019-09-26 2019-269 08:06:00 OPM to +XVV with Profile 7
2019-09-25 2019-268 08:53:00 OPM to -XVV with Profile 2
2019-09-25 2019-268 17:45:00 61S Docking 4 orbit
2019-09-24 2019-267 00:51:00 ISS POR took out power to ELC-2 and ELC-4 and MISSE. NICER was completely powered off - Science downtime from 2019-267-00:51:45 - 2019-267-04:38:51
2019-09-24 2019-267 23:00:00 Thruster Disable forJEMRMS Ops
2019-09-23 2019-266 01:25:00 Thruster Disable for JEMRMS Ops
2019-09-20 2019-263 10:54:00 NICER MEB Processor Reset (during SAA passage) Induced Safe Mode - Science downtime 2019-263-10:54:55 to 2019-263-15:06:10
2019-09-14 2019-257 18:01:00 SM Reboost
2019-09-09 2019-252 17:36:00 Reset the Star Tracker because imaging was stuck
2019-09-06 2019-249 22:16:00 MT Translate WS3 to WS5
2019-09-06 2019-249 17:45:00 60S Undock on CMG Control
2019-09-05 2019-248 18:20:00 Thruster Disable 60S Clamp Removal
2019-09-05 2019-248 20:10:00 60S Depress
2019-09-04 2019-247 19:30:00 SPDM Operations
2019-09-03 2019-246 17:40:00 SPDM Ops and MT Translate WS7 to WS3
2019-09-01 2019-244 21:43:00 60S Thruster Test on MM
2019-08-31 2019-243 15:00:00 Solar Array Test
2019-08-30 2019-242 19:30:00 MT Translate WS2-7 SPM Ops Translate WS3-7
2019-08-29 2019-241 19:30:00 MT Translate WS2-7 and SPDM Ops
2019-08-29 2019-241 04:07:55 NICER background data collection ended and NICER re-deployed after ROBO MBSU IFM Ops. Since Plan resumed at 241-05:00:47
2019-08-28 2019-240 11:15:00 SPDM ORU Ops
2019-08-28 2019-240 09:08:25 NICER science plan stopped, background data collection started and NICER STOW operations performed for ROBO Ops for MBSU IFM.
2019-08-27 2019-239 14:42:00 Dragon-18 Release
2019-08-27 2019-239 11:25:00 Dragon-18 Unberth
2019-08-27 2019-239 03:11:54 60S Docking
2019-08-27 2019-239 22:15:00 MT Translate WS6 to WS2
2019-08-27 2019-239 04:20:00 Thruster Disable ater 60S Docking
2019-08-26 2019-238 03:35:30 59S Relocate
2019-08-25 2019-237 05:40:00 59S Thruster Test on MM
2019-08-23 2019-235 05:01:00 OPM to -XVV with Profile 1 - Soyuz 60S docking at 2019-236-05:30 was aborted due to (presumed) issue with the KURS docking system amplifier onboard ISS in the RS segment.\n\nSoyuz placed at a safe trajectory from the ISS until further attempt is made to dock again. ISS currently flying in -XVV TEA orientation and no additional maneuvering is expected until re planning has happened.\n\nNICER plan was updated since the ISS maneuver after the docking was not performed to account for the non-change in attitude of the ISS. Also, AP 66 and 67 (solar exclusion) were disabled until maneuvering is completed in coming days.
2019-08-22 2019-234 01:00:00 Thruster Disable for JEM RMS Ops
2019-08-21 2019-233 09:30:00 IDA3 EVA
2019-08-19 2019-231 23:30:00 IDA3 Extraction from Dragon Trunk
2019-08-19 2019-231 02:05:00 Thruster Disable for JEM RMS Ops
2019-08-16 2019-228 00:55:00 RRM3 Deconfig MT Translate WS7 to WS6
2019-08-15 2019-227 16:34:01 NICER performed several Crab Pulsar observations during Night to Day transitions
2019-08-15 2019-227 15:25:48 Reset GEONS clock bias which includes updated Earth Orientation Parameters
2019-08-15 2019-227 05:53:00 73P Double Reboost
2019-08-13 2019-225 19:30:00 RRM3 Tech Demo
2019-08-12 2019-224 21:41:00 RRM3 Setup Robotics MT Translate WS6 to WS7
2019-08-07 2019-219 13:30:00 MT Translate WS7 WS6
2019-08-06 2019-218 12:13:00 Cygnus-11 Unberth
2019-08-06 2019-218 07:05:00 Thruster Disable for JEM RMS Ops
2019-08-06 2019-218 16:15:00 Cygnus-11 Release
2019-08-04 2019-216 23:46:00 Thruster Disable for JEM RMS Ops
2019-08-01 2019-213 03:25:01 OPM to +XVV with Profile 6
2019-07-31 2019-212 16:35:00 Thruster Disable for 73P Clamp Install
2019-07-31 2019-212 15:35:18 73P Docking 2 orbit
2019-07-31 2019-212 05:46:01 OPM to -XVV with Profile 2
2019-07-29 2019-210 10:00:00 72P Undocking with UTSO Mnvrs - Sep at 10:44:30
2019-07-28 2019-209 12:24:00 Thruster Disable for 72P Clamp Removal
2019-07-27 2019-208 15:21:00 SpaceX-18 Install Thruster Disable
2019-07-27 2019-208 14:00:00 Dragon-18 Capture
2019-07-23 2019-204 21:11:27 Power cycled MPU-2 to clear an timestamping issue seen in science data
2019-07-23 2019-204 07:30:00 CMG Maneuver to +XVV TEA
2019-07-22 2019-203 04:00:00 CMG Maneuver to +XVV Yaw Bias Attitude
2019-07-22 2019-203 01:12:17 NICER enters Pointing Control Safe Mode (AZ=0, EL=90). Due to ISS manuever from -XVV to +XVV, GPS SPS went invalid for greater than 5 minutes, triggering AP 48 calling RTS 30 to safe NICER.
2019-07-22 2019-203 00:27:01 OPM to +XVV
2019-07-20 2019-201 22:50:58 59S Docking
2019-07-20 2019-201 16:00:00 CMG Maneuver to -XVV TEA
2019-07-14 2019-195 06:20:00 CMG Maneuver to -XVV Yaw Bias Attitude
2019-07-14 2019-195 01:45:00 OPM to -XVV with Profile 1
2019-07-13 2019-194 19:30:00 CMG Maneuver to +XVV TEA
2019-07-12 2019-193 18:10:00 CMG Maneuver to Yaw Bias Attitude
2019-07-09 2019-190 19:40:00 Thruster Disable FMS Characterization
2019-07-08 2019-189 14:18:00 MPU-2 time-stamping corrupt due to stuck bit.
2019-07-08 2019-189 19:40:00 Thruster Disable FMS Characterization
2019-07-04 2019-185 03:30:00 Thruster Disable for JEMRMS Ops
2019-07-03 2019-184 03:59:00 Thruster Disable for JEMRMS Ops
2019-07-02 2019-183 23:13:00 SM Reboost
2019-06-27 2019-178 16:10:00 Thruster Disable for SPDM Ops
2019-06-24 2019-175 23:25:30 57S Undocking with USTO Maneuvers
2019-06-20 2019-171 07:42:00 57S Thruster Test on MM
2019-06-19 2019-170 12:50:00 Thruster Disable for SPDM and MT Translate WS2 to WS7
2019-06-19 2019-170 05:58:24 Background Data Collection Ends and NICER Re-deploy started
2019-06-18 2019-169 12:36:23 Background Science Data Collection Begins
2019-06-18 2019-169 13:45:00 Thruster Disable for MISSE Robotics
2019-06-18 2019-169 01:00:00 Thruster Disable for JERMRMS Ops
2019-06-18 2019-169 11:47:49 NICER Science Plan stopped and Stow begins for ROBO Ops and MISSE troubleshooting. About 20% of targets were obscured prior to stopping the plan due to ROBO parked in our way over night 168-169.
2019-06-17 2019-168 18:30:00 Thruster Disable for MISSE Robotics
2019-06-17 2019-168 01:38:00 Thruser Disable for JEMRMS Ops
2019-06-16 2019-167 00:15:00 Thruster Disable for SPDM and MT Translate WS7 to WS2
2019-06-14 2019-165 19:15:00 Thruster Disable for SPDM and MT Translate WS2 to WS7
2019-06-13 2019-164 11:52:10 NICER STOW Complete and Background Data Collection begun
2019-06-13 2019-164 17:53:57 NICER background data collection stopped and Unstow Begun
2019-06-13 2019-164 12:15:00 Thruster Disable for SPDM Ops - FRAM Swaps
2019-06-13 2019-164 11:00:05 NICER STOW for ROBO Ops Started
2019-06-13 2019-164 18:44:00 NICER science data collection begins
2019-06-12 2019-163 19:25:00 Thruster Disable for MT Translate WS3 to WS2
2019-06-12 2019-163 01:00:00 Thruster Disable for JEMRMS Ops
2019-06-07 2019-158 01:55:00 Thruster Disable for JEMRMS Ops
2019-06-05 2019-156 00:30:00 Thruster Disable for JEMRMS Ops
2019-06-04 2019-155 08:40:30 71P Undocking on CMG Control
2019-06-03 2019-154 16:00:00 SpX-17 Release
2019-06-03 2019-154 09:40:00 Thruster Disable for 72P Hatch Open and SpX-17 Unberth
2019-06-01 2019-152 09:43:00 71P Aft Progress Prop Purge on CMG Attitude Hold
2019-05-30 2019-150 01:10:00 Thruser Disable for JEMRMS Ops
2019-05-29 2019-149 13:35:00 RS EVA 46 on US Control
2019-05-28 2019-148 13:25:00 MT Translate WS6 to WS3
2019-05-27 2019-147 13:20:00 MT Translate WS7 to WS6
2019-05-26 2019-146 12:10:00 Thruster Disable for 71P Hatch Closing
2019-05-24 2019-144 06:20:00 CMG MM Maneuver from Yaw Bias to Stage TEA
2019-05-23 2019-143 18:50:00 CMG MM Maneuver to Yaw Bias
2019-05-23 2019-143 16:08:00 71P Reboost
2019-05-23 2019-143 11:45:00 CMG MM Maneuver from Yaw Bias to Stage TEA
2019-05-21 2019-141 15:30:00 CMG MM Maneuver to Yaw Bias
2019-05-21 2019-141 14:45:00 Thruster Disable for 72P Hatch Closing
2019-05-20 2019-140 23:05:00 Thruster Disable JEMRMS SFA Ops Part 2
2019-05-20 2019-140 21:00:00 ISS Beta Gimbal Assembly on Solar Array 2B on the Port SARJ is stuck and will likely be parked overnight
2019-05-20 2019-140 02:30:00 Thruster Disable JEMRMS SFA Ops
2019-05-17 2019-137 05:30:00 CMG MM Maneuver from Yaw Bias to Stage TEA
2019-05-16 2019-136 17:55:21 NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 18:03:28.
2019-05-16 2019-136 03:40:00 CMG MM Maneuver to Yaw Bias
2019-05-15 2019-135 17:50:00 Thruster Disable BCDU Relocate
2019-05-15 2019-135 03:26:00 Thruster Disable BCDU Relocate Setup
2019-05-14 2019-134 02:12:00 SpX Trunk Ops Thruster Disable Day 5
2019-05-14 2019-134 16:28:35 NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 16:37:40.
2019-05-12 2019-132 19:30:00 SpX Trunk Ops Thruster Disable Day 4
2019-05-09 2019-129 21:40:00 SpX Trunk Ops Thruster Disable Days 1 to 3
2019-05-07 2019-127 15:35:00 Thruster Disable SpaceX Cargo Robotics Setup
2019-05-06 2019-126 12:55:00 SpaceX-17 Install Thruster Disable
2019-05-06 2019-126 11:00:00 SpaceX-17 Capture
2019-05-03 2019-123 12:30:00 MT Translate WS6 to WS3 SpX17 Robotic Setup
2019-05-02 2019-122 12:59:53 NICER survival heater service is powered back on by HOSC
2019-05-01 2019-121 13:00:00 MT Translate WS3 to WS6 MBSU3 R&R Setup
2019-04-29 2019-119 20:51:00 NICER pre-heaters turned on
2019-04-29 2019-119 17:35:00 NICER pre-heaters turned off
2019-04-29 2019-119 12:00:00 ISS testing caused NICER survival heater service power off
2019-04-29 2019-119 15:13:00 NICER pre-heaters turned on
2019-04-29 2019-119 22:13:00 NICER pre-heaters turned off
2019-04-27 2019-117 13:05:00 Thruster Disable for MISSE Transfer Ops Day 5
2019-04-26 2019-116 23:59:26 NICER science targetting resumed
2019-04-26 2019-116 20:00:11 NICER powered on
2019-04-26 2019-116 13:10:00 Thruster Disable for MISSE Transfer Ops Day 4
2019-04-25 2019-115 13:10:00 Thruster Disable for MISSE Transfer Ops Day 3
2019-04-24 2019-114 13:26:44 NICER Science targetting stopped for stowage for ROBO MISSE Ops.
2019-04-24 2019-114 14:52:00 NICER powered off
2019-04-24 2019-114 12:25:00 Thruster Disable for MISSE Transfer Ops Day 2
2019-04-23 2019-113 12:40:00 Thruster Disable for MISSE Transfer Ops Day 1
2019-04-19 2019-109 10:48:00 Cygnus 11 Install
2019-04-19 2019-109 09:30:00 Cygnus 11 Capture
2019-04-12 2019-102 22:35:00 RRM3 Install and MT Translate WS7 to WS3 - ending DOY 103
2019-04-11 2019-101 12:42:46 RRM3 at ELC-1 had a burst disk rupture venting gas and ice. Solar arrays were locked in a position to minimize impact. Venting induced an ISS roll of 1.3 degrees which was corrected at 12:44. Ice buildup on the exterior of the payload continued to break away at 14:03.
2019-04-10 2019-100 16:26:00 SPDM NiH R&R Operations
2019-04-09 2019-099 16:04:00 Thruster Disable for SPDM Unstow
2019-04-08 2019-098 20:30:00 NICER Science targetting resumed
2019-04-08 2019-098 17:55:00 NICER MEB Powered on
2019-04-08 2019-098 11:10:00 NICER Stowed and powered off
2019-04-08 2019-098 10:19:00 US EVA Truss Jumper
2019-04-08 2019-098 09:47:00 NICER Science targetting stopped for stowage
2019-04-05 2019-095 17:23:00 SPDM NiH R&R Operations
2019-04-05 2019-095 02:15:00 RS OPM to +XVV (Yaw back to +356)
2019-04-04 2019-094 04:41:00 OPM (Pitch to +359.7)
2019-04-04 2019-094 03:04:00 OPM to -XVV (Yaw to +177, Pitch to +0.1)
2019-04-04 2019-094 14:24:50 72P Docking to DC1
2019-04-04 2019-094 15:55:00 Thruster disable for 72P clamp install
2019-04-02 2019-092 12:05:00 SPDM BCDU R&R Ops
2019-03-30 2019-089 14:00:00 LIB ROBO Cleanup
2019-03-29 2019-088 09:54:00 US EVA 2A LIB
2019-03-28 2019-087 05:44:00 2A Robotic Battery Operations Ends
2019-03-26 2019-085 05:00:00 2A Robotic Battery Operations Begins
2019-03-23 2019-082 13:22:00 71P Reboost
2019-03-22 2019-081 10:06:00 4A LIB EVA
2019-03-20 2019-079 18:06:00 Robotics Ops CH4A ends
2019-03-18 2019-077 19:00:00 Robotics Ops CH4A begins
2019-03-16 2019-075 22:37:00 MT Translate from WS6 to WS7 EOTP Rotate
2019-03-16 2019-075 10:00:00 MT Translate from WS3 to WS6
2019-03-15 2019-074 11:22:01 OPM to +XVV (back to +356 Yaw)
2019-03-15 2019-074 01:02:00 58S Docking to MRM1
2019-03-15 2019-074 01:10:00 ISS Maneuver to Post Docking (Pitch +359)
2019-03-14 2019-073 16:53:01 ISS Maneuver to TEA +.4 Pitch)
2019-03-14 2019-073 15:51:01 OPM to -XVV (Yaw +356to +177 for Soyuz Docking)
2019-03-08 2019-067 07:31:04 SpaceX Demo-1 Dragon Undocking
2019-03-03 2019-062 11:00:00 SpaceX Demo-1 Dragon docking to PMA2
2019-02-26 2019-057 02:21:00 Progress 71P Reboost
2019-02-22 2019-053 19:08:00 Thruster Disable for RMCT Stow
2019-02-22 2019-053 10:50:00 NICER back on Science plan.
2019-02-22 2019-053 06:57:00 NICER powered back on after MISSE Ops complete
2019-02-21 2019-052 16:28:00 NICER stowed ad powered off for ROBO ops
2019-02-21 2019-052 15:09:33 NICER Targeting stopped for ROBO Ops to troubleshoot MISSE
2019-02-21 2019-052 18:18:00 Thruster Disable for MISSE Ops (troubleshooting with ROBO involved)
2019-02-20 2019-051 20:55:00 Thruster Disable for RMCT Unstow
2019-02-15 2019-046 15:25:00 Reset GEONS as part of clock bias reset (NICER was using SPS during 15:27 to 15:32)
2019-02-15 2019-046 12:05:00 SM Thruster Test
2019-02-08 2019-039 16:10:00 Cygnus 10 Release
2019-02-08 2019-039 12:35:00 Cygnus 10 Unberth
2019-02-06 2019-037 19:04:32 Updated GEONS EOP per Day 036.
2019-02-06 2019-037 18:25:00 FSW Flash Images 5, 6 and 7 TMR checks
2019-02-04 2019-035 14:15:01 Reset the Star Tracker because imaging was stuck
2019-02-01 2019-032 01:25:00 Thruster disable for JEMRMS NRCSD Stow
2019-01-31 2019-031 03:05:00 Thruster disable for JEMRMS NRCSD Deploy
2019-01-28 2019-028 ?? PRO performed a cold reset of the ELC coldfire processor for mISSE troubleshooting which resulted in a brief interruption of 1553 traffic for NICER
2019-01-25 2019-025 12:55:30 Progress 70P Undocking from DC1
2019-01-24 2019-024 14:45:00 Progress 70P Clamp Removal
2019-01-22 2019-022 12:21:00 Progress 70P Prop Purge in Momentum Management
2019-01-18 2019-018 18:01:00 Progress 71P Reboost
2019-01-13 2019-013 23:30:00 SpaceX 16 Release
2019-01-13 2019-013 18:50:00 SpaceX 16 Unberth
2019-01-04 2019-004 06:38:00 NICER Powered back on after ROBO Ops complete
2019-01-04 2019-004 09:59:00 NICER back on Science plan.
2019-01-03 2019-003 01:56:00 NICER Powered off for ROBO Ops.
2019-01-03 2019-003 00:56:00 NICER background data collection stopped.
2019-01-02 2019-002 23:45:00 NICER stowed and collecting background data
2019-01-02 2019-002 22:30:00 NICER Targeting stopped for ROBO Ops to install MSCs to MISSE.
2018-12-21 2018-355 20:39:00 XNAV App configuration update
2018-12-20 2018-354 01:40:00 Soyuz 55S Undocking on CMG Control from MRM1
2018-12-19 2018-353 20:20:00 ISS Maneuver to TEA
2018-12-19 2018-353 22:01:00 XNAV App configuration update and restart
2018-12-18 2018-352 15:56:00 GEONS EOP Updated
2018-12-18 2018-352 10:30:00 ISS Manuever to Yaw Bias Attitude
2018-12-17 2018-351 16:16:00 XNAV App configuration update and restart
2018-12-16 2018-350 09:48:00 55S Thruster Test on MM (Soyuz on MRM-1)
2018-12-13 2018-347 16:59:00 XNAV App configuration update
2018-12-11 2018-345 18:15:00 Russian EVA 45A on Soyuz Module (they hacked the thing to pieces, debris everywhere!) Messed up our tracking. NICER off targetting plan from 345-18:57 - 23:58.
2018-12-08 2018-342 12:45:00 ISS Manuever to Dragon Berthed TEA
2018-12-08 2018-342 12:21:00 SpaceX-16 Dragon Capture
2018-12-08 2018-342 08:25:00 ISS Manuever to Dragon Capture Attitude
2018-12-07 2018-341 21:25:00 XNAV App configuration update and restart
2018-12-04 2018-338 04:07:00 ISS Manuever to +XVV using OPM
2018-12-04 2018-338 02:45:00 ISS Maneuver to -XVV OPM Starting Attitude
2018-12-04 2018-338 18:19:00 XNAV App configuration update and restart
2018-12-03 2018-337 15:40:00 ISS Maneuver to 57S Docking Attitude
2018-12-03 2018-337 17:36:00 Soyuz 57 Docking at MRM2
2018-12-03 2018-337 06:30:00 ISS Maneuver to -XVV using OPM for Soyuz docking
2018-12-03 2018-337 17:42:00 ISS Maneuver to Post-Docking LVLH TEA
2018-12-03 2018-337 19:01:00 XNAV App configuration update and restart
2018-11-29 2018-333 21:42:00 XNAV App configuration update and restart
2018-11-26 2018-330 17:12:00 XNAV App configuration update and restart
2018-11-19 2018-323 14:49:00 NICER payload rebooted by HOSC in error (Science outage of 3 hours and 26 minutes) recovery complete at 323-18:11:58
2018-11-19 2018-323 10:57:00 ISS Manuever to Cygnus Berthed TEA
2018-11-19 2018-323 10:20:00 Cygnus 10 Capture
2018-11-19 2018-323 08:20:00 ISS Maneuver to Cygnus Capture Attitude
2018-11-18 2018-322 19:30:00 Progress 71P Docking without NG10
2018-11-15 2018-319 21:35:00 XNAV App configuration update and restart in Calibration Mode
2018-11-13 2018-317 17:54:00 XNAV App restart
2018-11-09 2018-313 22:01:00 XNAV App configuration update and restart
2018-11-07 2018-311 16:50:00 HTV-7 Release
2018-11-07 2018-311 14:20:00 XNAV App restart
2018-11-05 2018-309 15:29:00 XNAV App configuration update and restart
2018-11-03 2018-307 12:24:00 MEB Processor Reset Induced Safe Mode Downtime 12:24:55 to 17:22:02z
2018-11-01 2018-305 20:07:00 XNAV App configuration update
2018-10-26 2018-299 14:53:00 XNAV App configuration update
2018-10-22 2018-295 17:35:00 Resumed nominal science targeting and photo shoot concludes
2018-10-22 2018-295 16:01:00 Suspended nominal science targeting and maneuvered NICER for high-def photo opportunities with CRONUS NICER also took pictures of ELC-3 area using star tracker.
2018-10-22 2018-295 16:48:00 XNAV App restart
2018-10-22 2018-295 15:49:00 XNAV App configuration update
2018-10-22 2018-295 17:59:00 XNAV App restart
2018-10-18 2018-291 18:01:00 XNAV App restart
2018-10-18 2018-291 18:10:00 Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters
2018-10-16 2018-289 19:53:00 XNAV App configuration update and restart
2018-10-15 2018-288 17:16:00 XNAV App configuration update and restart
2018-10-12 2018-285 14:38:00 XNAV App configuration update
2018-10-12 2018-285 23:02:00 ISS maneuvers to +XVV using OPM
2018-10-11 2018-284 02:13:00 ISS maneuvers to -XVV
2018-10-05 2018-278 19:25:00 XNAV App configuration update
2018-10-04 2018-277 07:57:00 54S Undocking on CMG Control from MRM2
2018-10-02 2018-275 17:22:00 XNAV App configuration update and restart
2018-10-01 2018-274 15:58:00 XNAV App restart
2018-09-27 2018-270 12:00:00 HTV-7 Capture
2018-09-25 2018-268 17:49:00 XNAV App restart
2018-09-24 2018-267 14:52:00 XNAV App configuration update and restart
2018-09-20 2018-263 17:25:00 SM Reboost
2018-09-15 2018-260 19:21:00 XNAV App restart
2018-09-14 2018-257 21:50:00 XNAV App configuration update and restart
2018-09-11 2018-254 17:39:00 XNAV App configuration update and restart
2018-09-06 2018-249 14:54:00 XNAV App configuration update and restart
2018-09-05 2018-248 23:55:00 SM Reboost
2018-09-05 2018-248 17:13:00 XNAV App restart
2018-09-04 2018-247 21:18:00 XNAV App configuration update and restart
2018-09-04 2018-247 14:45:00 Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters
2018-08-30 2018-242 15:02:00 XNAV App configuration update and restart
2018-08-30 2018-242 09:45:00 Leak in Soyuz 55 module "fixed"
2018-08-29 2018-241 09:45:00 Leak in Soyuz 55 module. Attitude (pitch) divergences.
2018-08-24 2018-236 19:44:00 XNAV App configuration update and restart
2018-08-23 2018-235 02:16:00 69P Undocking on CMG Control from SM Aft
2018-08-21 2018-233 13:56:00 Updated Earth Orientation Parameters
2018-08-21 2018-233 14:17:00 XNAV App configuration update
2018-08-21 2018-233 14:19:00 XNAV App restart
2018-08-21 2018-233 14:36:00 Performed Flash Memory TMR checks.
2018-08-20 2018-232 03:25:00 69P Prop Purge on CMG AH
2018-08-17 2018-229 19:17:00 XNAV App configuration update and restart
2018-08-16 2018-228 12:58:00 Dedicated Thruster Firing Test (free drift)
2018-08-15 2018-227 14:10:00 RS EVA 45 on US Control
2018-08-09 2018-221 18:50:00 XNAV App configuration update and restart
2018-08-03 2018-215 16:37:00 Space-X CRC-15 Dragon released from ISS
2018-08-01 2018-213 20:13:00 XNAV App configuration update
2018-07-30 2018-211 13:38:00 Performed maintenance on flash memory partition
2018-07-27 2018-208 21:19:00 XNAV App restart, now running in CAL mode
2018-07-27 2018-208 21:17:00 XNAV App configuration update
2018-07-27 2018-208 21:20:00 Performed Flash Memory TMR checks. Boot6.bin had TMR errors as did several of the spares.
2018-07-26 2018-207 17:38:00 XNAV App configuration update and restart
2018-07-26 2018-207 16:10:00 69P at SM Aft reboost
2018-07-24 2018-205 20:21:00 Reset GEONS and GEONS Clock bias and updated EOP. GEONS had diverged at 18:14
2018-07-23 2018-204 01:45:00 Yaw Bias Manuever
2018-07-21 2018-202 NaN ISS DCSU 3A Power on Reset, disrupting power service to J3AB (NICER survival heater and Op heater power service). POIC powered NICER pre-heaters in response. J3AB down for 8+ hours, minimal impact to NICER)
2018-07-20 2018-201 20:40:00 XNAV App restart, now running in CAL mode
2018-07-20 2018-201 20:38:00 XNAV App configuration update
2018-07-18 2018-199 13:00:00 Maneuver to TEA
2018-07-17 2018-198 19:35:00 XNAV App configuration update
2018-07-17 2018-198 22:04:00 XNAV App restart
2018-07-15 2018-196 12:35:00 Cygnus-9 Unberth and Release
2018-07-15 2018-196 17:00:00 Yaw Bias Manuever
2018-07-13 2018-194 18:56:00 XNAV App configuration update and restart
2018-07-11 2018-192 02:09:00 OPM to +XVV
2018-07-10 2018-191 19:25:00 Cygnus Reboost Maneuver
2018-07-10 2018-191 20:45:00 Cygnus Reboost Maneuver to -XVV TEA
2018-07-10 2018-191 01:39:00 70P Progress 2-Orbit Docking to DC-1 Nadir
2018-07-10 2018-191 02:04:00 ISS Maneuver to Post-Docking LVLH TEA
2018-07-09 2018-190 23:29:00 ISS Yaw and Pitch Maneuver (+180 Yaw and +90 Pitch)
2018-07-09 2018-190 02:16:00 OPM to -XVV (Yaw +354 to +175 for Progress Docking)
2018-07-09 2018-190 04:05:00 ISS Pitch Maneuver (+359 to +0.5)
2018-07-09 2018-190 17:21:00 XNAV App configuration update
2018-07-03 2018-184 22:01:00 XNAV App configuration update
2018-07-02 2018-183 15:02:00 XNAV App restart
2018-07-02 2018-183 10:57:00 SpaceX-15 Capture
2018-06-29 2018-180 20:54:00 XNAV App restart
2018-06-29 2018-180 19:32:00 XNAV App configuration update
2018-06-29 2018-180 13:55:00 Performed TMR checks on Flash image 6 and 7 - no errors found
2018-06-29 2018-180 13:42:00 Reset GEONS and GEONS Clock bias and updated EOP
2018-06-26 2018-177 16:00:00 XNAV App restart
2018-06-26 2018-177 15:54:00 XNAV App configuration update
2018-06-25 2018-176 13:45:00 NICER PC Safe due to FDC
2018-06-25 2018-176 14:31:00 NICER PC commanded back to Ops Mode
2018-06-25 2018-176 14:35:00 NICER back in Science Mode
2018-06-23 2018-174 08:15:00 69P Reboost
2018-06-21 2018-172 14:56:00 XNAV App configuration update and restart
2018-06-15 2018-166 18:50:00 XNAV App configuration update
2018-06-15 2018-166 17:30:00 XNAV App restart
2018-06-14 2018-165 09:32:00 N2 EWC EVA
2018-06-12 2018-163 17:13:00 XNAV App configuration update and restart
2018-06-08 2018-159 15:30:00 XNAV App configuration update and restart
2018-06-08 2018-159 13:07:00 55S Soyuz Docking on MRM-1
2018-06-06 2018-157 15:18:00 XNAV App restart
2018-06-04 2018-155 17:34:00 XNAV App configuration update and restart
2018-06-03 2018-154 09:29:00 Manevuer to post-53S undocking attitude
2018-06-03 2018-154 09:16:00 53S Soyuz undocking
2018-06-01 2018-152 20:56:00 XNAV App restart
2018-05-30 2018-150 17:04:00 XNAV App configuration update and restart
2018-05-24 2018-144 18:45:00 XNAV App configuration update and restart
2018-05-24 2018-144 09:20:00 OA9 Cygnus Capture (attitude man at 07:20)
2018-05-22 2018-142 15:52:00 XNAV App restart
2018-05-21 2018-141 14:32:00 XNAV App configuration update and restart
2018-05-17 2018-137 14:15:00 XNAV App configuration update and restart
2018-05-16 2018-136 14:21:00 NICER Powered off
2018-05-16 2018-136 18:40:00 NICER Powered on
2018-05-16 2018-136/137 NaN PFCS EVA
2018-05-16 2018-136 09:02:00 NICER targeting stopped
2018-05-16 2018-136 10:15:00 NICER Stow complete
2018-05-16 2018-136 17:30:00 PFCS EVA complete
2018-05-16 2018-136 21:50:00 NICER Deloyed
2018-05-16 2018-136 22:56:00 NICER resumes targeting
2018-05-16 2018-136 22:57:00 XNAV App Restarted
2018-05-14 2018-134 15:27:00 XNAV App configuration update and restart
2018-05-12 2018-132 22:07:00 69P Reboost
2018-05-09 2018-128 17:20:00 XNAV App configuration update and restart
2018-05-08 2018-128 20:47:00 FSW Flash Images 6 and 7 TMR checks (none found)
2018-05-07 2018-127 17:51:00 Updated GPS EOP
2018-05-05 2018-125 13:24:00 SpaceX 14 Release
2018-05-04 2018-124 23:17:00 SpaceX 14 Unberth Maneuver
2018-05-04 2018-124 20:17:00 Updated XNAV app config and restarted
2018-05-01 2018-121 15:26:00 Updated XNAV app config and restarted
2018-04-27 2018-117 NaN MISSE Robotics Day 7
2018-04-26 2018-116 18:56:00 XNAV App configuration update and restart
2018-04-26 2018-116 18:42:00 XNAV App configuration update
2018-04-26 2018-116 NaN MISSE Robotics Day 6
2018-04-24 2018-114 14:52:00 Employing new RTSs to allow modified detector configuration for SCO-X1 observations starting at 15:14.
2018-04-24 2018-114 17:36:00 XNAV App configuration update
2018-04-23 2018-113 21:46:00 Reset XNAV app
2018-04-23 2018-113 14:12:00 Reset XNAV app
2018-04-20 2018-110 18:26:00 Updated XNAV app config and restarted
2018-04-19 2018-110 03:20:00 XNAV App reconfigured and running. Reset performed at 04:02.
2018-04-19 2018-109 23:06:00 NICER Reactivated and Redeployed after MISSE MSC installation. MEB on at 109-23:20. Began NICER observations at 110-02:00.
2018-04-19 2018-109 NaN MISSE Robotics Day 5
2018-04-18 2018-108 06:12:00 NICER powered on after MISSE activities complete to collect background data. NICER still stowed. - MEB back on at 06:23. MPUs back on at 07:14.
2018-04-18 2018-108 NaN MISSE Robotics Day 4
2018-04-18 2018-108 10:50:00 69P Reboost
2018-04-18 2018-108 16:50:00 NICER powered off for MISSE MSC activities. MPUs off at 16:58. MEB off at 17:02.
2018-04-17 2018-107 17:09:00 NICER powered off for MISSE MSC installation activities - MPUs off at 17:14, MEB off at 17:25
2018-04-17 2018-107 13:40:00 Science observations suspended. Begin to stow for MISSE MSC installation activities. ROBO arm blocking NICER FOV hours before this.
2018-04-17 2018-107 NaN MISSE Robotics Day 3
2018-04-16 2018-106 NaN MISSE Robotics Day 2
2018-04-15 2018-105 NaN MISSE Robotics Day 1
2018-04-13 2018-103 21:28:00 Performed a TMR check of current FSW images in FLASH. No TMR errors.
2018-04-13 2018-103 20:00:00 Reset XNAV app
2018-04-12 2018-102 15:37:00 Reset XNAV app
2018-04-10 2018-100 18:35:00 Updated XNAV app config and restarted
2018-04-09 2018-099 08:33:00 XNAV App started
2018-04-09 2018-099 07:40:00 NICER began science observations after MISSE-FF installation
2018-04-09 2018-099 04:47:00 NICER powered on
2018-04-08 2018-098 15:50:00 Terminated NICER science observations and began stow and deactivation for MISSE-FF installation
2018-04-08 2018-098 18:11:00 NICER powered off
2018-04-04 2018-094 14:47:00 SpaceX-14 Berth
2018-04-04 2018-094 11:00:00 SpaceX-14 Capture
2018-04-03 2018-093 16:18:00 Updated XNAV app config and restarted
2018-03-30 2018-089 17:56:00 Performed a TMR check of current FSW images in FLASH. No TMR errors.
2018-03-29 2018-088 11:10:00 N3 EWC EVA
2018-03-28 2018-087 15:33:00 Updated GPS GEONS EOP
2018-03-28 2018-087 13:50:30 Progress Vehicle (68P) undocking from DC-1
2018-03-27 2018-086 NaN Began SEXTANT-driven operations for NICER
2018-03-26 2018-085 14:21:00 Updated XNAV app config and restarted
2018-03-26 2018-085 17:19:00 Reset XNAV app
2018-03-26 2018-085 16:03:00 Unexpected ISS Ku-Comm unit reset causing a permanent NICER data loss from 16:17 - 16:42.
2018-03-25 2018-084 13:15:00 Manuever to SARJ Parked TEA for 68P Prop Purge
2018-03-24 2018-083 06:10:00 Manuever OPM to +XVV
2018-03-23 2018-082 19:32 to 19:43 Series of commanded NICER ST resets which left PC in safe mode. Safe mode exited at 19:43.
2018-03-23 2018-082 19:40:00 54S Docking
2018-03-23 2018-082 07:10:00 Maneuver OPM to -XXV for 54S Docking
2018-03-22 2018-081 18:59:00 Updated XNAV app config and restarted
2018-03-19 2018-078 18:20:00 Updated XNAV app config and restarted
2018-03-14 2018-073 14:44:00 Reset XNAV app
2018-03-13 2018-072 21:27:00 Updated XNAV app config and restarted
2018-03-13 2018-072 20:45:00 69P Reboost
2018-03-12 2018-071 20:43:00 Reset XNAV app
2018-03-09 2018-068 21:09:00 Updated XNAV app config and restarted
2018-03-06 2018-065 NaN XNAV App ran in opportunistic mode observing PSR_B1937+21
2018-03-05 2018-064 19:59:00 MPU-5 Powered off due to overcurrent trip on PDB board. MPU recovery complete at ~ 22:30.
2018-02-27 2018-058 23:08:00 52S Undocking from MRM2
2018-02-22 2018-053 19:14:00 Reset star tracker since it was stuck in mode where it would not store images.
2018-02-22 2018-053 08:52:00 52S Thruster Test on MM
2018-02-16 2018-047 19:11:00 Restarted XNAV app after halting it in December 2017
2018-02-16 2018-047 NaN POA LEE Swap US EVA
2018-02-15 2018-046 10:43:00 69P Docking to SM-Aft
2018-02-13 2018-044 17:56:00 Reset GEONS and clock bias
2018-02-02 2018-033 NaN RS EVA 44
2018-01-30 2018-030 14:40:00 SM Reboost
2018-01-30 2018-030 17:11:00 Performed a TMR check of current FSW images in FLASH. No TMR errors.
2018-01-23 2018-023 NaN LEE B R&R US EVA
2018-01-18 2018-018 15:19:00 Reset star tracker since it was stuck in mode where it would not store images.
2018-01-17 2018-017 20:15:00 SM Main Engine Reboost
2018-01-13 2018-013 10:00:00 SpX-13 Unberth from N2-Nadir
2018-01-09 2018-009 17:35:00 Reset star tracker since it was stuck in mode where it would not store images.
2018-01-02 2018-002 17:05:00 TSIS at ELC-3 vented 1.5L of Argon from 17:05:38 to 17:10:00.
2017-12-28 2017-362 01:03:00 67P Undocking from SM-Aft
2017-12-27 2017-361 21:04:00 GEONS diverged (likely due to manuever on DOY 360 for Progress docking) Recovered GEONS at 361-21:37.
2017-12-19 2017-353 08:43:00 53S Docking to MRM1
2017-12-17 2017-351 11:00:00 SpaceX-13 Capture N2-Nadir
2017-12-15 2017-349 21:58:00 GEONS diverged (likely due to DOY 349 for Soyuz undocking) Recovered GEONS at 349-22:23
2017-12-14 2017-348 05:14:00 51S Undocking from MRM1
2017-12-12 2017-346 05:20:00 67P Prop Purge
2017-12-08 2017-342 10:17:00 51S Thruster Test
2017-12-06 2017-340 17:17:00 Reset star tracker since it was stuck in mode where it would not store images.
2017-12-06 2017-340 13:12:00 OA8 Release from N1-Nadir
2017-12-01 2017-335 21:12:00 Halted XNAV App
2017-11-29 2017-333 15:50:00 67P Reboost
2017-11-28 2017-332 18:31:00 XNAV App Restart
2017-11-28 2017-332 18:29:00 XNAV App configuration update
2017-11-22 2017-326 17:51:00 51S Thruster Test
2017-11-22 2017-326 17:15:00 XNAV App configuration update
2017-11-20 2017-324 20:49:00 Reset star tracker since it was stuck in mode where it would not store images.
2017-11-20 2017-324 20:31:00 XNAV App Restart
2017-11-20 2017-324 20:29:00 XNAV App configuration update
2017-11-20 2017-324 19:16:00 Reset GEONS and GEONS Clock bias and updated EOP
2017-11-20 2017-324 17:52:00 51S Thruster Test
2017-11-16 2017-320 18:11:00 51S Thruster Test
2017-11-14 2017-318 10:04:00 OA8 Capture at N1-Nadir
2017-11-10 2017-314 20:10:00 51S Thruster Test
2017-11-05 2017-309 01:59:00 NICER leaves PC Safe and returns to nominal operations.
2017-11-04 2017-308 13:56:00 NICER Star Tracker Reset (likely due to SEU) causes NICER PC Safe
2017-11-02 2017-306 18:37:00 MPU Detector thresholds for the Day 306 through 310 LMC-X1 targets were adjusted to be Nominal + 190 as follows:\n2017-306-18:37:20 | /FSW_SC_STARTRTS RTSID=228\n2017-306-23:19:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-02:24:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-07:04:00 | /FSW_SC_STARTRTS RTSID=228\n2017-307-10:10:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-11:43:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-17:56:40 | /FSW_SC_STARTRTS RTSID=228\n2017-308-00:10:47 | /FSW_SC_STARTRTS RTSID=228\n2017-308-01:40:38 | /FSW_SC_STARTRTS RTSID=228\n2017-308-03:13:22 | /FSW_SC_STARTRTS RTSID=228\n2017-308-04:46:02 | /FSW_SC_STARTRTS RTSID=228\n2017-308-09:32:54 | /FSW_SC_STARTRTS RTSID=228\n2017-308-12:33:49 | /FSW_SC_STARTRTS RTSID=228\n2017-308-21:54:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-00:59:54 | /FSW_SC_STARTRTS RTSID=228\n2017-309-02:28:41 | /FSW_SC_STARTRTS RTSID=228\n2017-309-04:02:18 | /FSW_SC_STARTRTS RTSID=228\n2017-309-07:10:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-08:43:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-13:21:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-14:53:37 | /FSW_SC_STARTRTS RTSID=228\n2017-310-00:09:54 | /FSW_SC_STARTRTS RTSID=228\n2017-310-01:42:34 | /FSW_SC_STARTRTS RTSID=228\n2017-310-03:16:35 | /FSW_SC_STARTRTS RTSID=228\n2017-310-07:53:14 | /FSW_SC_STARTRTS RTSID=228\n2017-310-11:01:55 | /FSW_SC_STARTRTS RTSID=228
2017-11-02 2017-306 03:15:00 67P Reboost
2017-10-20 2017-293 NaN EVA 46
2017-10-16 2017-289 11:04:00 68P Docking to DC-1 Nadir
2017-10-10 2017-283 NaN EVA CP9 R&R LEE Lube
2017-10-05 2017-278 NaN EVA LEE A R&R
2017-09-27 2017-270 16:50:00 67P Reboost
2017-09-17 2017-260 08:40:00 SpaceX-12 Dragon Unberth
2017-09-13 2017-256 14:46:00 Yaw Maneuver to +XVV (~90 minutes) for 52S
2017-09-13 2017-256 02:55:00 Soyuz (52S) Docking to MRM2
2017-09-12 2017-255 17:08:00 Yaw Maneuver to -XVV (~90 minutes) for 52S
2017-09-07 2017-250 14:20:00 Switched PPS source to GEONS
2017-09-06 2017-249 18:46:00 Switched PPS source to SPS (due to Earth Orientation Parameters update)
2017-09-02 2017-245 21:58:00 Soyuz (50S) Undocking from MRM2
2017-07-31 2017-212 17:21:00 Switched PPS source to GEONS
2017-07-31 2017-212 15:40:00 GEONS Reset (to reset GEONS clock bias) - had to repeat several times
2017-07-31 2017-212 16:51:00 Switched PPS source to SPS
2017-07-31 2017-226 14:46:00 SpaceX-12 Dragon Berth
2017-07-31 2017-212 17:25:00 Rebooted the Star Tracker (MIRU quaternion was corrupted due to geons reset)
2017-07-29 2017-210 09:44:00 Yaw Maneuver to +XVV (~90 minutes) for 51S
2017-07-28 2017-209 21:54:00 Soyuz (51S) Docking to MRM1
2017-07-28 2017-209 13:39:00 Yaw Maneuver to -XVV (~90 minutes) for 51S
2017-07-21 2017-202 13:49:00 Switched PPS source to GEONS
2017-07-20 2017-201 17:46:00 Progress Vehicle (66P) Undocking from DC1-Nadir
2017-07-20 2017-201 19:59:00 Switched PPS source to SPS
2017-07-18 2017-199 21:01:00 MPU-3 back in science mode
2017-07-18 2017-199 20:40:00 MPU-3 was powered off due to likely SEU
2017-07-02 2017-183 15:46:00 SpaceX-11 Dragon Unberth
2017-07-01 2017-182 13:26:00 Switched to Science Mode 7 (photons and resets) all the time
2017-06-28 2017-179 16:54:00 Switched PPS source to GEONS
2017-06-28 2017-179 16:25:00 Switched PPS source to SPS
2017-06-24 2017-175 23:09:00 Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing.
2017-06-23 2017-174 21:52:00 Switched PPS source to GEONS
2017-06-22 2017-173 18:37:00 Switched to Science Mode 1 (only photons) for Orbit Day and Mode 7 (photons and resets) for Orbit Night
2017-06-21 2017-172 17:44:00 Tightened deadbands to 0.5 degrees on heaters for detector and concentrator plates (maintain at +5 deg C)
2017-06-19 2019-170 06:45:12 NICER Re-deploy complete and Science Data Collection Begins (ROBO is parked in the NICER FOV until later today which will affect 20% of the targets)
2017-06-18 2017-169 23:09:00 Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. Actually started making adjustments at 11:52z.
2017-06-18 2017-169 08:25:00 First intentional X-rays received from Scorpious-X1
2017-06-17 2017-168 12:34:00 Updated on-board sequence to keep the 4 known bad detectors disabled.
2017-06-17 2017-167 11:50:00 Set the MPUs to Science Mode 1 (photons only)
2017-06-16 2017-167 07:32:00 End of Dual threshold scan
2017-06-16 2017-167 14:05:00 End of Dual threshold scan, run #2
2017-06-16 2017-167 00:02:00 Power-on ST
2017-06-16 2017-167 00:06:00 Start of Dual threshold scan - stowed
2017-06-16 2017-167 20:07:00 Range of Motion Completed
2017-06-16 2017-167 11:42:00 Progress Vehicle (67P) Docking at SM-Aft
2017-06-16 2017-167 13:15:00 Power-on GCE, prep for deployment
2017-06-16 2017-167 10:01:00 Start of Dual threshold scan, run #2 - stowed
2017-06-16 2017-167 14:10:00 Start of Deployment sequence
2017-06-16 2017-167 14:30:00 First significant Deployment motion
2017-06-16 2017-167 14:50:00 Deployment to heads down complete
2017-06-16 2017-167 15:47:00 Deployment to heads up complete
2017-06-16 2017-167 16:01:00 Range of Motion Started
2017-06-15 2017-166 05:32:00 Frangibolt 2 released
2017-06-15 2017-166 23:45:00 Enable Science (mode 7 - photons and resets) - stowed
2017-06-15 2017-166 22:33:00 Power-on MPUs
2017-06-15 2017-166 22:29:00 Power-on GPS
2017-06-15 2017-166 21:37:00 Set Conc temp settings and Det temp setting to nominal (5 deg C), cooling down to operational temp
2017-06-15 2017-166 04:12:00 Frangibolt 3 released
2017-06-15 2017-166 20:19:00 Frangibolt 4 released
2017-06-14 2017-165 08:13:00 NICER Activation/Power-on GCE
2017-06-14 2017-165 08:26:00 Power-off GCE
2017-06-14 2017-165 08:19:00 Latch
2017-06-14 2017-165 14:16:00 Start Frangibolt release process
2017-06-14 2017-165 08:06:00 NICER Activation/Enable science (mode 7 - phtons and resets) - Stowed
2017-06-14 2017-165 06:38:00 NICER Activation/Power-on all MPUs
2017-06-14 2017-165 06:32:00 NICER Activation/Power-on Star Tracker
2017-06-14 2017-165 13:02:00 Power-off MPUs, prep for deployment
2017-06-14 2017-165 04:28:00 NICER Activation/Power-on MEB
2017-06-14 2017-165 16:00:00 Power-on GCE to check for frangibolt release
2017-06-14 2017-165 16:07:00 Frangibolt 1 released
2017-06-14 2017-165 22:00:00 Discretes 1 and 2 disabled to turn on pre-heaters
2017-06-14 2017-165 22:42:00 Set Conc temp settings to 30 and Det temp setting to 20, warming up to actuate frangibolts again
2017-06-14 2017-165 22:51:00 Power-off GCE
2017-06-14 2017-165 22:52:00 Power-off ST
2017-06-14 2017-165 22:53:00 Power-off GPS
2017-06-14 2017-165 21:34:00 Discretes 1 and 2 enabled to turn off pre-heaters
2017-06-14 2017-165 06:20:00 NICER Activation/Power-on GPS
2017-06-13 2017-165 03:53:00 NICER Installation
2017-06-11 2017-162 22:36:00 NICER Extraction
2017-06-05 2017-156 17:46:00 SpaceX-11 Berth
2017-06-03 2017-154 21:07:00 SpaceX-11 Launch
NaT 2018-183,186-189 NaN Space-X Robotics
NaT NaN NaN NaN