2025-03-05 00:00:00 |
2025-064 |
16:53:27 |
Loaded version 4 of RTS225 which configures MPU3 and 4 for daytime Slow settings to +35 over night. They had been incorrectly set to +1000 over night in version 5 on Feb 28th. |
2025-03-04 00:00:00 |
2025-063 |
16:33:53 |
Loaded RTS243_v10 which contains MPU3 detector enables for all channels during day observations. |
2025-03-04 00:00:00 |
2025-063 |
16:30:53 |
Set MPU3 Ringer ticks to 2850 for all channels. |
2025-03-04 00:00:00 |
2025-063 |
16:28:18 |
Loaded RTS124_v01 which contains MPU3 forced trigger period of 200 during day observations. |
2025-03-04 00:00:00 |
2025-063 |
16:15:11 |
Ran revised table MPU3 slot 2 beginning at 25-063-16:15:11. |
2025-03-03 00:00:00 |
2025-062 |
21:14:06 |
Updated GPS EOPs and performed a GEONS Reset |
2025-02-28 00:00:00 |
2025-059 |
22:23:48 |
Created and uploaded RTS009_v02 which contains the following detector configurations for SCO_X1 observations: (affective 25-059-22:23:48)\n\n\n\n\n\n\n\n\n |
2025-02-28 00:00:00 |
2025-059 |
20:24:42 |
Created and uploaded RTS155_v03 which contains the following detector configurations for T_CrB observations: (affective 25-059-20:24:42)\n\n\n\n\n\n |
2025-02-28 00:00:00 |
2025-059 |
19:50:58 |
Loaded RTS225 version 5 which contained MPU3 and MPU 4 slow settings that are +1000 over night settings (this was on accident, sould have loaded v04) |
2025-02-28 00:00:00 |
2025-059 |
18:18:00 |
Created and uploaded RTS225_v06 which contained MPU3 threshold settings for night even during day during the MPU3 modified software load run. |
2025-02-28 00:00:00 |
2025-059 |
18:17:00 |
Created and uploaded RTS124_v01 which contained MPU3 forced trigger period of 200 during the MPU3 modified software load run. |
2025-02-28 00:00:00 |
2025-059 |
18:01:00 |
Loaded MPU revised table into MPU3 slot 2 and executed from 25-0-18:01:35 through 19:34:16. We then transitioned MPU 3 back to executing table from normal slot 1. |
2025-02-25 00:00:00 |
2025-056 |
19:56:40 |
Progress 89P undocked from SM Aft at 25-056-20:17:30. Load included commanding to point NICER away from 25-056-19:56:40 through 25-056-20:37:40. |
2025-02-24 00:00:00 |
2025-055 |
16:30:00 |
Debris in the area of the ISS reported to NICER by OC console today. Debris seen at 16:30 from nadir pointing camera on starboard truss. Debris moving from forward to aft. |
2025-02-20 00:00:00 |
2025-051 |
18:09:43 |
MPU7 powered off at 25-051-18:09:43, due to SEU. MPU 7 was powered on and fully configured for nominal science at 25-051-19:47:42 . |
2025-02-20 00:00:00 |
2025-051 |
05:54:00 |
Pointed NICER away from 89P Prop Purge at SM aft from 25-051-05:54:00 – 06:46:20 and then again from 07:40:00 – 08:31:00. Fuel: 06:15 - 06:28 & Ox: 07:59- 08:12 |
2025-02-19 00:00:00 |
2025-050 |
14:31:10 |
Uploaded version 2 of RTS 155 for T_CrB target with the following detector configuration for both day and night observations\n\n\n\n\n\n |
2025-02-14 00:00:00 |
2025-045 |
18:30:00 |
Uplinked Version 9 of the detector enable RTS (243) for daytime ops. Configuration for RTS 243 is now:\n\n\n\n\n\n |
2025-02-06 00:00:00 |
2025-037 |
19:53:28 |
Flash memory TMR checks performed. All images passed with no voting errors (save boot0 and boot1 whose CRCs were good) |
2025-02-04 00:00:00 |
2025-035 |
22:16:27 |
Made changes to the translate_pointing_tm.pl script that helps create the ATS loads to fix an issue with detectors being turned on in the daytime configuration at night for some slew cases. |
2025-02-03 00:00:00 |
2025-034 |
15:32:21 |
Updated GPS EOPs and performed a GEONS Reset |
2025-01-29 00:00:00 |
2025-029 |
17:08:09 |
Noticed (Keith did) and fixed an issue with the load builder tool that was not setting the correct detector enable RTS for the case where the target starts in the day and goes into the night. |
2025-01-28 00:00:00 |
2025-028 |
19:48:00 |
NICER commanded to look away from 90P thruster firings (docked at MRM2 Zenith) until 20:35. |
2025-01-28 00:00:00 |
2025-028 |
16:24:19 |
Built and loaded Version 08 of RTS 243. Used for daytime observations it commands the following detector configuration: (red are off)\n\n\n\n\n\n\n |
2025-01-28 00:00:00 |
2025-028 |
01:21:49 |
ATS load includes Increased Fast thrsholds for MPU1 during Menkent observations at 01:21:49 and 05:44:17 |
2025-01-27 00:00:00 |
2025-027 |
23:29:28 |
Increased Fast thrsholds for MPU1 during TOO commanded of Menkent ( /MPU1_SET_THRESHOLDS FSALLT_0=1231+3000 FSALLT_1=1221+3000 FSALLT_2=1248+3000 FSALLT_3=1279+3000 FSALLT_4=1265+3000 FSALLT_5=1270+3000 FSALLT_6=1254+3000 FSALLT_7=1242+)3000 SSALLT_0=1184+35 SSALLT_1=1205+35 SSALLT_2=1204+35 SSALLT_3=1183+35 SSALLT_4=1183+35 SSALLT_5=1224+35 SSALLT_6=1215+35 SSALLT_7=1144+35 |
2025-01-24 00:00:00 |
2025-024 |
22:54:46 |
Loaded the first version of RTS 120 (v00) and RTS 124(v00). RTS 120 will set the forced trigger period for all channels of all MPUs to 200ms at night. RTS 124 will set the forced trigger period for all channels of all MPUs to 10000ms at day.\nChanged the make_ats_tmp_tm.pl to include in the loads calling RTS 120 at night and RTS 124 in day.\nRebuilt the load according to the AGS7 that was already loaded and running to include the new day/night RTS calls. Switched to this load (A) at 25-024-22:54:46.600. |
2025-01-24 00:00:00 |
2025-024 |
20:27:55 |
Loaded Version 4 of RTS 224 - 227. This takes the MPU back to the pre-repair fast and slow threshold numbers. Settings were changed at 25-024-20:27:55. |
2025-01-21 00:00:00 |
2025-021 |
20:51:08 |
Tested using MEB Mode #5 - Send Photons and Overshoots. for MPU 1-4 then later 5-7 at 21:16 |
2025-01-21 00:00:00 |
2025-021 |
20:50:40 |
Tested adjusting thresholds for ffsalt and ssalt. - 35, 35 |
2025-01-20 00:00:00 |
2025-020 |
17:37:47 |
Commanded the forced trigger period to 10,000ms between triggers. |
2025-01-20 00:00:00 |
2025-020 |
17:28:00 |
Commanded the forced trigger period to 10,000ms between triggers. |
2025-01-20 00:00:00 |
2025-020 |
17:36:42 |
Commanded the forced trigger period to 200ms between triggers. |
2025-01-20 00:00:00 |
2025-020 |
17:41:05 |
Commanded the slow shaper thresholds to 1000+ nominal. |
2025-01-20 00:00:00 |
2025-020 |
18:44:38 |
Built and uplinked version 5 of RTS 224-227 to update the ssallt thresholds to 1000+nominal. New ssallt parameters took affect on PSR_J1311-3430 at 18:45z, about half way through the duration of the target. |
2025-01-19 00:00:00 |
2025-019 |
21:26:00 |
FEDS1 got into a strange state sometime after 019-21:26 where is was sending on APID 603, and 611 but not 904. Rebooted the FEDS and it fixed the issue. |
2025-01-17 00:00:00 |
2025-017 |
16:57:47 |
Tested adjusting the HV Bias on MPU1-5 to 3020 |
2025-01-17 00:00:00 |
2025-017 |
16:36:18 |
Tested adjusting the HV Bias on MPU1-5 to 3000 |
2025-01-17 00:00:00 |
2025-017 |
16:46:27 |
Tested adjusting the HV Bias on MPU1-5 to 3020 |
2025-01-17 00:00:00 |
2025-017 |
16:47:38 |
Tested adjusting the HV Bias on MPU1-5 to 3000 |
2025-01-17 00:00:00 |
2025-017 |
16:48:30 |
Tested adjusting the HV Bias on MPU1-5 to 2900 |
2025-01-17 00:00:00 |
2025-017 |
16:49:20 |
Tested adjusting the HV Bias on MPU1-5 to 2800 |
2025-01-17 00:00:00 |
2025-017 |
16:50:13 |
Tested adjusting the HV Bias on MPU1-5 to 2700 |
2025-01-17 00:00:00 |
2025-017 |
16:51:45 |
Tested adjusting the HV Bias on MPU1-5 to 2600 |
2025-01-17 00:00:00 |
2025-017 |
16:55:48 |
Tested adjusting the HV Bias on MPU1-5 to 2400 |
2025-01-17 00:00:00 |
2025-017 |
16:56:24 |
Tested adjusting the HV Bias on MPU1-5 to 2300 |
2025-01-17 00:00:00 |
2025-017 |
16:57:02 |
Tested adjusting the HV Bias on MPU1-5 to 2000 |
2025-01-17 00:00:00 |
2025-017 |
16:53:41 |
Tested adjusting the HV Bias on MPU1-5 to 2500 |
2025-01-17 00:00:00 |
2025-017 |
20:19:58 |
Commanded happy pill for detector 1-1 |
2025-01-17 00:00:00 |
2025-017 |
20:23:33 |
Commanded happy pill for detector 1-7 |
2025-01-17 00:00:00 |
2025-017 |
20:20:21 |
Commanded happy pill for detector 1-2 |
2025-01-17 00:00:00 |
2025-017 |
20:24:59 |
Commanded happy pill for detector 7-4 |
2025-01-17 00:00:00 |
2025-017 |
20:24:19 |
Commanded happy pill for detector 7-2 |
2025-01-17 00:00:00 |
2025-017 |
20:23:56 |
Commanded happy pill for detector 4-2 |
2025-01-17 00:00:00 |
2025-017 |
20:25:32 |
Commanded happy pill for detector 7-8 |
2025-01-17 00:00:00 |
2025-017 |
20:23:10 |
Commanded happy pill for detector 1-6 |
2025-01-17 00:00:00 |
2025-017 |
20:21:32 |
Commanded happy pill for detector 1-5 |
2025-01-17 00:00:00 |
2025-017 |
20:20:42 |
Commanded happy pill for detector 1-4 |
2025-01-16 00:00:00 |
2025-016 |
19:05:25 |
Enabled all detectors via RTS 204 |
2025-01-16 00:00:00 |
2025-016 |
08:56:44 |
Science plan stopped to command NICER heads-down for NICER Repair EVA\nNICER heads-down complete at 25-016-09:33:51.\n\n~14:30 - EV1(Nick Hague) translates to NICER\n~14:40 - EV1 Starts NICER survey\n~14:53 - Patch #1 installed\n~15:00 - Patch #6 installed\n~15:08 - All patches installed including two additional, F-5-3 and C-5-5. No patches stored.\n~15:10 - EV1 taking final pictures - hand-held\n~15:33 - NICER is go for deploy\n25-016-15:41:20 - NICER commanded to heads-up (180, 90) |
2025-01-16 00:00:00 |
2025-016 |
16:05:16 |
Commanded the detector thresholds to daytime via RTS 224 |
2025-01-16 00:00:00 |
2025-016 |
16:20:16 |
Commanded nominal detector thresholds via RTS 220 |
2025-01-16 00:00:00 |
2025-016 |
16:54:29 |
Commanded NICER to the pre-repair ATS (B) |
2025-01-16 00:00:00 |
2025-016 |
17:09:46 |
Switched back to Post-repair checkout ATS |
2025-01-16 00:00:00 |
2025-016 |
17:16:22 |
Loaded and started NICER pre-repair science ATS |
2025-01-16 00:00:00 |
2025-016 |
17:29:49 |
Commanded NICER daytime detector config on via RTS 242 |
2025-01-16 00:00:00 |
2025-016 |
18:28:28 |
start mpu_threshold_adjust(150,150) |
2025-01-16 00:00:00 |
2025-016 |
18:38:04 |
start mpu_threshold_adjust(100,100) |
2025-01-16 00:00:00 |
2025-016 |
18:49:17 |
start mpu_threshold_adjust(150,150) |
2025-01-16 00:00:00 |
2025-016 |
17:29:04 |
Commanded NICER detectors for pre-repair thresholds via RTS 224 |
2025-01-16 00:00:00 |
2025-016 |
19:10:19 |
Disabled all detectors |
2025-01-16 00:00:00 |
2025-016 |
20:11:42 |
Enabled detectors via RTS 204 |
2025-01-16 00:00:00 |
2025-016 |
22:34:49 |
Imaging complete. Commanded return to ATS load pre-repair science |
2025-01-16 00:00:00 |
2025-016 |
21:38:03 |
Stopped the ATS and commanded NICER to the EHDC1 lab starboard camera while CRONUS took images of NICER |
2025-01-16 00:00:00 |
2025-016 |
21:01:54 |
Enabled all detectors |
2025-01-16 00:00:00 |
2025-016 |
21:01:10 |
Commanded NICER detectors to nominal thresholds |
2025-01-16 00:00:00 |
2025-016 |
19:15:23 |
Cycled the HV on all detectors |
2025-01-16 00:00:00 |
2025-016 |
19:52:04 |
start mpu_threshold_adjust(200,200) |
2025-01-16 00:00:00 |
2025-016 |
19:39:00 |
Commanded happy pill for detector 1-3 |
2025-01-16 00:00:00 |
2025-016 |
19:30:43 |
Set detector thresholds to nominal thresholds |
2025-01-16 00:00:00 |
2025-016 |
19:21:43 |
Enabled all the detectors |
2025-01-10 00:00:00 |
2025-010 |
19:46:54 |
Ran Happy Pill on detector 5-6 (Angry Bird) |
2025-01-09 00:00:00 |
2025-009 |
17:27:57 |
Ran Happy Pill on detector 5-6 (Angry Bird) |
2025-01-08 00:00:00 |
2025-008 |
18:31:45 |
Ran Happy Pill on detector 5-6 (Angry Bird) |
2025-01-08 00:00:00 |
2025-008 |
17:21:24 |
Simulated the checkout targeting portion of the NICER detector repair. Checkout targets were in the ATS load and at orbit noon we slewed to view the ISS EHDC1 (P1 Upper Outboard) camera, this is the MISSE camera with the gold ball in the way. (Camera was not really on NICER but we wanted to see how long the process took (6 minutes) Science Plan interrupted from 25-008-17:21:24 to 25-008-17:26:53. |
2025-01-06 00:00:00 |
2025-006 |
21:26:05 |
Reset the star tracker after it got stuck imaging from 25-006-21:26:05.760 - 25-006-22:13:19. |
2024-12-27 00:00:00 |
2024-362 |
14:08:01 |
Updated EOPs and Reset clock bias |
2024-12-24 00:00:00 |
2024-359 |
13:04:50 |
Pointed NICER at MRM-2 window while Nick photographed NICER. Science plan interrupted from 24-359-13:04:50 through 24-359-14:07:48. |
2024-12-19 00:00:00 |
2024-354 |
13:35:00 |
Russian EVA 63 on US Control |
2024-12-19 00:00:00 |
2024-354 |
05:43:49 |
Star tracker imaging got stuck at 24-354-05:43:49. Reset the star tracker at 24-354-06:08:11. |
2024-12-19 00:00:00 |
2024-354 |
15:55:00 |
Russian EVA FOD Release:\nReleases (approximate times/durations):\n~15:55 – one disk shaped item, roughly the size of a CD. Moving retrograde away from Station\n~1615 – first release of FOD/particulate, large release at first and then release rate slowed down ~2 minutes. Direction was retrograde and away from station. Crew was located on MRM. \n~1749 – Second FOD release, intermittent. Smaller in quantity than 16:15 occurrence. First indication that it was potentially tied to EVA crew manipulating orange covers. Direction was retrograde away from Station, crew looked to be on the Service Module. \n~18:59 – Third FOD release, smaller in quantity than 17:49 occurrence. Direction still retrograde and away from station. Crew appeared to be on Service Module. \nOne final FOD release was observed during today’s EVA. Around 22:18 GMT, a small, shiny object comparable to the one seen at 15:55 GMT was seen floating away from the Russian airlock in the retrograde (aft) direction while crew were working in the vicinity. |
2024-12-17 00:00:00 |
2024-352 |
14:26:00 |
NICER Photo shoot scheduled today with Don Pettit was cancelled at the last minute. Russian EVA items were staged too near the MRM-2 window for Don to get near to take the images.\nIn order to get some images today, we asked if CRONUS could take images using the external cameras. We were able to get HD photos of NICER pointing to EHDC7(lab starboard) camera and ISS EHDC1 (P1 Upper Outboard, this is the MISSE camera with the gold ball in the way) camera.\nNICER Photo shoot from MRM-2 with Don is rescheduled for Christmas Eve.\nScience was interrupted for NICER photos from 24-352-14:26:00 through 24-352-15:04:18. Science interrupted again from 24-352-15:21:06 to 24-352-15:48:12. |
2024-12-17 00:00:00 |
2024-352 |
18:25:00 |
Maneuver to Corrected TEA |
2024-12-16 00:00:00 |
2024-351 |
15:45:02 |
Look away commanding for SpX-31 undock from N2F port. Science plan interrupted from 24-351-15:45:02 through 24-351-16:25:00. |
2024-12-16 00:00:00 |
2024-351 |
15:30:00 |
Cargo Dragon Undocking (SpX-31 from N2F) |
2024-12-12 00:00:00 |
2024-347 |
11:10:00 |
Momentum Management Maneuver to Stage TEA |
2024-12-11 00:00:00 |
2024-346 |
18:10:00 |
Looked away from SpX-31 Pre-departure Thruster Test. Pointed NICER away from N2F from 24-346-18:10:00 through 024-346-19:42:40. |
2024-12-06 00:00:00 |
2024-341 |
20:02:09 |
Updated EOPs and Reset clock bias |
2024-12-06 00:00:00 |
2024-341 |
20:45:00 |
Momentum Management Maneuver to Yaw Bias Attitude |
2024-11-25 00:00:00 |
2024-330 |
08:39:00 |
PDAM 89P MLM Roll |
2024-11-24 00:00:00 |
2024-329 |
02:00:00 |
RS OPM mnvr to pXVV Profile 13 |
2024-11-23 00:00:00 |
2024-328 |
14:16:53 |
Looked away from 90P docking scheduled for MRM-2 at 328/14:36:51. Science interrupted from 2024-328-14:16:53 - 2024-328-14:30:19 and again from 24-328-14:31:35 - 24-328-14:37:52. From 14:30:19 to 14:31:35 - we slewed to a target from the load, by accident. I forgot to remove that target from the load. |
2024-11-23 00:00:00 |
2024-328 |
14:03:00 |
90P Docking Reduced RS Master Time (90P to MRM-2) |
2024-11-23 00:00:00 |
2024-328 |
01:22:00 |
RS OPM mnvr to nXVV Profile 5 |
2024-11-21 00:00:00 |
2024-326 |
13:00:00 |
ROBO Ops: MISSE Day 5, MT Xlate 2>7, JEMAL Insert, Mnvr Park. Arm could be in FOV until 327-03:00 |
2024-11-21 00:00:00 |
2024-326 |
06:05:50 |
Deployed NICER post ROBO MISSE Ops Day #4. Science plan resumed at 24-326-06:05:50. |
2024-11-20 00:00:00 |
2024-325 |
03:03:17 |
Stowed NICER for ROBO MISSE Ops Day #4. Science plan stopped at 24-325-03:03:17. - Background collection enabled. |
2024-11-19 00:00:00 |
2024-324 |
06:03:49 |
Deployed NICER after ROBO MISSE Ops Day #3. Science plan resumed at 24-324-06:03:49. Had been stowed at 24-323-11:34:02. |
2024-11-19 00:00:00 |
2024-324 |
12:32:00 |
Looked away for 88P (at MRM-2) undock. Science interrupted from 2024-324-12:32:00 through 2024-324-13:15:22. |
2024-11-19 00:00:00 |
2024-324 |
12:10:00 |
88P Undocking with USTO mnvrs (88P from MRM-2) |
2024-11-19 00:00:00 |
2024-324 |
18:59:00 |
PDAM 89P with MLM Roll |
2024-11-18 00:00:00 |
2024-323 |
11:34:02 |
Stowed NICER for ROBO MISSE Ops Day #3. Science plan stopped at 24-323-11:34:02. - Background collection enabled. |
2024-11-18 00:00:00 |
2024-323 |
06:18:05 |
Deployed NICER after ROBO MISSE Ops Day #2. Science plan resumed at 24-323-06:18:05. Had been stowed at 24-322-11:45:51. |
2024-11-17 00:00:00 |
2024-322 |
11:45:51 |
Stowed NICER for ROBO MISSE Ops Day #2. Science plan stopped at 24-322-11:45:51. - Background collection enabled. |
2024-11-17 00:00:00 |
2024-322 |
06:10:02 |
Deployed NICER after ROBO MISSE Ops Day #1. Science plan resumed at 24-322-06:10:02. Had been stowed at 24-321-21:19:38. |
2024-11-16 00:00:00 |
2024-321 |
21:19:38 |
Stowed for ROBO MISSE Ops Day #1. Science plan stopped at 24-321-21:19:38. - Detectors not enabled for entire stow. |
2024-11-12 00:00:00 |
2024-317 |
11:52:19 |
88P Propellant purges scheduled for 317-12:10:00 - 13:53:20. Look away commanded from 2024-317-11:52:19 through 24-317-14:09:45. Fuel purge was from 12:20z to 12:33z. OX Line purge started at 13:50z |
2024-11-09 00:00:00 |
2024-314 |
00:04:00 |
OPM to pXVV |
2024-11-08 00:00:00 |
2024-313 |
17:20:00 |
SpX-31 Dragon Reboost |
2024-11-08 00:00:00 |
2024-313 |
03:57:00 |
OPM to nXVV |
2024-11-08 00:00:00 |
2024-313 |
17:35:00 |
Commanded look-away during SpX-31 Reboost. Science interrupted from 24-313-17:35:00 through 24-313-18:21:04. |
2024-11-07 00:00:00 |
2024-312 |
19:45:00 |
Commanded look-away during SpX-31 Prop Checkout Thruster Firing. Science interrupted from 24-31-19:45:00 - 24-312-20:48:12. |
2024-11-07 00:00:00 |
2024-312 |
16:19:38 |
Updated EOPs and Reset clock bias |
2024-11-06 00:00:00 |
2024-311 |
19:43:32 |
I overheard on the flight loop that SpX-31 was getting ready to fire thrusters as part of a prop checkout. We had received no email communications about this. Immediately commanded a look-away as they said firing was starting in 10 minutes. Hailed PRO who also said that their group was not informed over normal channels. The activity was on the timeline, however. Ultimately, flight moved checkout to tomorrow since communication was so poor. Science interrupted for look-away from 24-311-19:43:32 - 24-311-20:33:13. No thruster firing occurred from SpX-31 today. |
2024-11-05 00:00:00 |
2024-310 |
14:56:27 |
NICER Flash Memory TMR checks performed. No voting errors. |
2024-11-05 00:00:00 |
2024-310 |
14:40:01 |
SpX-31 Docked at N2F. Soft capture at ~14:54. NICER looked away from 2024-310-14:40:01 - 24-310-15:13:42. |
2024-11-05 00:00:00 |
2024-310 |
13:00:00 |
Cargo Dragon Docking (SpX-31 to N2F) (M24_310_A_03.UAF) |
2024-11-03 00:00:00 |
2024-308 |
10:50:00 |
Dragon Port Relocate Crew-9 from N2F to N2Z (M24_308_A_03.UAF) |
2024-11-03 00:00:00 |
2024-308 |
11:14:02 |
Look away from the Crew-9 relocate (N2F to N2Z) from 2024-308-11:14:02 to 2024-308-12:29:00. |
2024-11-01 00:00:00 |
2024-306 |
21:51:01 |
Looked away from Crew-9 Thruster Test from 2024-306-21:51:01 -2024-306-22:15:17. And then again from 24-306-22:30:04 - 2024-306-23:07:00. |
2024-10-23 00:00:00 |
2024-297 |
20:45:03 |
Commanded NICER to look away from Crew-8 undock. Science plan interrupted from 24-297-20:45:03 through 2024-297-21:26:20. |
2024-10-23 00:00:00 |
2024-297 |
20:30:00 |
GMT 297 Crew Dragon Undocking (Crew-8 from N2Z) (M24_297_B_08.UAF) |
2024-10-17 00:00:00 |
2024-291 |
09:13:34 |
Reset the star tracker. Imaging was stuck from 24-291-09:13:34.004 to 24-291-09:36:35. |
2024-10-12 00:00:00 |
2024-286 |
07:50:00 |
Crew-8 thruster firing test. Look-away commanded (science interrupted) from 24-286-07:50:00 - 24-286-08:54:30. |
2024-10-07 00:00:00 |
2024-281 |
13:58:09 |
Updated EOPs and Reset clock bias |
2024-10-02 00:00:00 |
2024-276 |
17:53:30 |
Star tracking imaging stuck from 24-276-17:53:30.661 – 24-276-18:54:05. Reset the star tracker to clear. |
2024-09-29 00:00:00 |
2024-273 |
21:06:55 |
Commanded NICER to look aft of starboard for Crew 9 docking. Science interrupted from 24-273-21:06:55 – 24-273-21:36:26. |
2024-09-29 00:00:00 |
2024-273 |
20:25:00 |
Dragon Docking (Crew-9 to N2F) (M24_273_A_03.UAF) Soft Capture at 21:30 |
2024-09-23 00:00:00 |
2024-267 |
08:06:00 |
71S Undocking from RS Node CMG Control (M24_267_A_07.UAF) Physical Separation at 08:36:30 |
2024-09-12 00:00:00 |
2024-256 |
06:15:00 |
RS OPM to pXVV Profile 11 (M24_256_A_07.UAF) |
2024-09-11 00:00:00 |
2024-255 |
10:13:00 |
72S Docking to MRM1 (H24_255_A_07.UAF) Docking at 19:33:40 |
2024-09-11 00:00:00 |
2024-255 |
06:16:00 |
RS OPM to nXVV Profile 3 (H24_255_B_05.UAF) |
2024-09-09 00:00:00 |
2024-253 |
21:25:00 |
Inertia Data Collection Actual ISS attitude may vary by up to 3 degrees in each axis (normal Momentum Management performance) based on day-of mass properties. See Chit 24429 for more details. Chit 24429: From 02:30-04:03 GMT, ISS will oscillate +/- 0.1 deg about the natural TEA. Oscillations are not shown in the ATL. |
2024-09-06 00:00:00 |
2024-250 |
21:45:02 |
Pointed NICER aft of starboard for the Starliner CST100 undock. Science plan interrupted from 2024-250-21:45:02 through 24-250-22:23:26.601z. |
2024-09-06 00:00:00 |
2024-250 |
20:53:00 |
CST100 Undock (CFT from PMA2) Physical sep at 22:04:00 |
2024-09-06 00:00:00 |
2024-250 |
15:15:00 |
Performed an OHMAN software restart at ~ 15:15z. (JAXA had notified us that OHMAN should have acted on a MAXI alert earlier in the week, which it did not.) |
2024-09-05 00:00:00 |
2024-249 |
19:10:00 |
89P Reboost |
2024-08-28 00:00:00 |
2024-241 |
00:41:00 |
89P Reboost |
2024-08-28 00:00:00 |
2024-241 |
17:51:31 |
Uploaded RTS25 V02 to change it from a noop to detector disable 6-6 and 7-4 for annealing. After Processor Reset (2024-154) we loaded the wrong version of this RTS. |
2024-08-23 00:00:00 |
2024-236 |
00:42:00 |
US OPM to pXVV with Timeliner Profile 12 |
2024-08-22 00:00:00 |
2024-235 |
03:01:00 |
US OPM to nXVV with Timeliner Profile 4 |
2024-08-22 00:00:00 |
2024-235 |
16:05:00 |
Cygnus21 Reboost |
2024-08-21 00:00:00 |
2024-234 |
01:32:47 |
Removed the special detector config for TARGETID=5324 in building the load switched to at 24-234-01:32:47.601. |
2024-08-17 00:00:00 |
2024-230 |
03:55:00 |
89P Docking SM Aft |
2024-08-16 00:00:00 |
2024-229 |
18:09:42 |
Reset the star tracker at 24-229-18:19:28z. Imaging was stuck from 18:09:42z until 24-229-18:19:28z. |
2024-08-14 00:00:00 |
2024-227 |
20:33:00 |
Created and uplinked RTS 154 and 155 (version 1) for special detector configuration for TargetID 5423\nThe following detectors are disabled for these targets:\n5-8, 6-8, 3-8, 4-8, 2-8, 1-8, 1-7, 4-7, 2-1, 2-4, 2-6, 5-3, 4-5, 5-4, 5-5, 6-6, 7-4, 7-7, 2-7, 6-7 |
2024-08-14 00:00:00 |
2024-227 |
18:28:00 |
Created and uplinked RTS 154 and 155 (version 0) for special detector configuration for TargetID 5423\nThe following detectors are disabled for these targets:\n5-8, 6-8, 3-8, 4-8, 2-8, 1-8, 1-7, 4-7, 2-1, 2-4, 2-6, 5-3, 4-5, 5-4, 5-5, 6-6, 7-4, 7-7 |
2024-08-07 00:00:00 |
2024-220 |
14:11:47 |
Updated EOPs and Reset clock bias |
2024-08-07 00:00:00 |
2024-220 |
15:19:39 |
Performed TMR checks on Flash memory boot files. Boot7 had voting errors and was replaced by boot6. |
2024-08-05 00:00:00 |
2024-218 |
15:30:00 |
OHMAN laptop recovered. Re-enabled TOOs from OHMAN on NICER |
2024-08-02 00:00:00 |
2024-215 |
03:45:33 |
Reset the Star Tracker at 09:44. Imaging was stuck from 24-215-03:45:33 to 24-215-09:44:28. |
2024-07-27 00:00:00 |
2024-209 |
14:20:00 |
Performed Lookaway for CST Thruster test between 14:20- 19:16z. There were many delays in getting the thruster test started.\nScience Downtimes: 24-209-14:20 to 16:05 z and 24-209:16:35 to 19:19z |
2024-07-17 00:00:00 |
2024-199 |
01:38:49 |
Reset the star tracker. Imaging stuck from 24-199-01:38:49 to 24-199-14:57:33. |
2024-07-13 00:00:00 |
2024-195 |
14:00:00 |
PRO called and said that crew checked connections for OHMAN and all looked good.\nTried again to restart the software.\nUSB dongle moved from port 6 to port 8 per PRO OHMAN_CAP window snap\nTried fixing it in the OHMAN config. OHMAN cal tries to connect to port 8 and dies after a few attempts, which is an indication of either no MAXI data (mirror on JEM HUB not enabled or some unknown error.\nCould be issue with the Ethernet cabling between laptop and JEM HUB. |
2024-07-13 00:00:00 |
2024-195 |
06:00:00 |
CMG Maneuver to Stage TEA (M24_195_A_07.UAF) |
2024-07-12 00:00:00 |
2024-194 |
14:10:00 |
CANSEI reported that due to a crew activity today that the transfer of MAXI data to OHMAN was down approximately from 14:10 to 15:03 GMT.\nWe weren't seeing any counts from MAXI after being notified by PRO of this at about 19:30. So, we decided to ask for a restart.\nRestart performed by PRO at about 4:30pm\nPRO also had JAXA recycle the mirror port. - No Joy. No telemetry seen from MAXI. PRO advised us to regroup and try again tomorrow. |
2024-07-12 00:00:00 |
2024-194 |
12:21:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M24_194_D_03.UAF) |
2024-07-12 00:00:00 |
2024-194 |
04:20:00 |
CMG Maneuver to Stage TEA (M24_194_C_03.UAF) |
2024-07-07 00:00:00 |
2024-189 |
10:10:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M24_189_A_05.UAF) |
2024-07-05 00:00:00 |
2024-187 |
21:32:57 |
Updated EOPs and Reset clock bias |
2024-06-21 00:00:00 |
2024-173 |
21:06:00 |
Re-enabled TOOs from OHMAN |
2024-06-18 00:00:00 |
2024-170 |
21:18:00 |
HOSC maintenance turned off our GSE and H&S packets for a bit around 21:18 |
2024-06-15 00:00:00 |
2024-167 |
14:13:12 |
Commanded look-away from CST-100 thruster hot fire testing from 24-167-14:13:12 through 2024-167-15:57:09. |
2024-06-11 00:00:00 |
2024-163 |
00:37:16 |
Star tracker imaging was stuck from 24-163-00:37:16.642 through 24-163-01:00:27. Reset the star tracker at 24-163-01:00:27. |
2024-06-08 00:00:00 |
2024-160 |
23:05:00 |
US OPM to pXVV with Timeliner Profile 12 (M24_160_B_03.UAF) |
2024-06-07 00:00:00 |
2024-159 |
23:52:00 |
US OPM to nXVV with Timeliner Profile 4 (M24_159_D_03.UAF) |
2024-06-06 00:00:00 |
2024-158 |
13:35:00 |
CST100 Docking (CFT to PMA2) (M24_158_A_05.UAF) |
2024-06-06 00:00:00 |
2024-158 |
16:58:09 |
Commanded NICER to AZ=-45deg and EL=90deg for CST100 docking from 24-158-16:58:09 through 2024-158-17:51:00\nPerformed Flash Memory TMR checks. boot2.bin had voting errors and was replaced with a fresh copy.\nUpdated EOPs and Reset clock bias at 18:08:54 |
2024-06-02 00:00:00 |
2024-154 |
01:34:14 |
A NICER processor reset was detected at 24-154-01:34:14.000z based on an exception in VxWorks task tXbdService.\nThe HOSC confirmed and reported a dropout (01:35:37- 01:37:25) in our Health & Status consistent with NICER PAR NICER-SW-0001.\nTotal Science Downtime: 24-154-01:34:14.000z to 24-154-03:56:28z. (2.37 hours) |
2024-06-01 00:00:00 |
2024-153 |
23:44:00 |
RS OPM pXVV Profile 11 (M24_153_B_06.UAF) |
2024-05-31 00:00:00 |
2024-152 |
23:00:00 |
RS OPM nXVV Profile 2 (M24_152_A_06.UAF) |
2024-05-25 00:00:00 |
2024-146 |
06:11:00 |
OPM to pXVV with Timeliner Profile 11 (M24_146_A_05.UAF) |
2024-05-24 00:00:00 |
2024-145 |
00:47:00 |
OPM to nXVV with Timeliner Profile 3 (M24_144_A_05.UAF) |
2024-05-13 00:00:00 |
2024-134 |
01:00:00 |
CMG Maneuver to Stage TEA (M24_134_A_05.UAF) |
2024-05-09 00:00:00 |
2024-130 |
19:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M24_130_A_06.UAF) |
2024-05-08 00:00:00 |
2024-129 |
09:37:10 |
Star tracker imaging got stuck at 24-129-09:37:10. Reset star tracker at 24-129-13:04:30. |
2024-05-05 00:00:00 |
2024-125 |
23:03:14 |
Reset the Star tracker – imaging stuck since 24-125-23:03:14.679. ST recovered at 24-126-21:38:54. |
2024-05-05 00:00:00 |
2024-125 |
23:45:00 |
GEONS diverged at 24-125-23:45:04.000. Updated EOPs and Reset GEONS clock state bias. GEONS converged at 24-126-21:39:57.000. |
2024-05-03 00:00:00 |
2024-124 |
00:45:00 |
ROBO Ops: WO Lab until 124-03:45 |
2024-05-03 00:00:00 |
2024-124 |
10:02:00 |
Updated EOPs and Reset GEONS Clock Bias twice because GEONS not happy - update and reset at 15:13:33 and 20:47:36 |
2024-05-02 00:00:00 |
2024-123 |
12:29:00 |
Dragon Port Relocate Crew-8 from N2F to N2Z |
2024-05-02 00:00:00 |
2024-123 |
11:20:01 |
Crew-8 Relocation originally scheduled at 24-123-11:40 slipped until 12:30. As a result of the slipping, science plan interrupted from 2024-123-11:20:01 through 24-123-11:31:18, at which time we resumed the science plan while waiting for the slip.\nScience plan paused and look-away started at 2024-123-12:39:59.\nCrew-8 undocked N2F at 24-123-12:57.\nCrew-8 docked at N2Z at 24-123-13:38.\nScience plan was resumed at 24-123-14:01. |
2024-05-02 00:00:00 |
2024-123 |
21:45:00 |
ROBO Ops: MT Xlate WS2>WS4 until 124-00:45 |
2024-04-29 00:00:00 |
2024-120 |
15:50:00 |
ROBO: Parked: TBD\nMT - WS 2, SSRMS B on MBS 3\nSR = +180.0, +2.0, -105.0, -70.0, -90.0, +90.0, -55.0 = WR\nSPDM on MBS 2: BR = +60.0, EOTP = -90, body holding Stow\nSR1 = -50.00, -40.00, +80.00, +30.00, -80.00, -120.00, -50.00 = WR1\nSR2 = -120.00, -40.00, -80.00, -60.00, +40.00, -120.00, -20.00 = WR2\nuntil 123-21:45 |
2024-04-29 00:00:00 |
2024-120 |
14:50:00 |
ROBO Ops: Ops: I71 MNVR Crew-8 Relocate LIDAR Clear until 120-15:50 |
2024-04-28 00:00:00 |
2024-119 |
16:40:00 |
NICER commanded via load to look a little aft of starboard for the SpX-30 undock which occurred at 119:17:00. Science plan interrupted from 2024-119-16:40:00 through 2024-119-17:22:00. |
2024-04-28 00:00:00 |
2024-119 |
16:30:00 |
Cargo Dragon Undocking (SpX-30 from N2Z) (M24_119_A_03.UAF) |
2024-04-25 00:00:00 |
2024-116 |
21:20:01 |
NICER commanded to look a little aft of starboard for the SpX-30 and Crew 8 thruster testing which occurred from 21:30 through 23:00. Science plan interrupted from 24-116-21:20:01 to 2024-116-22:49:40. |
2024-04-25 00:00:00 |
2024-116 |
13:10:00 |
RS EVA 62 on US Control (M24_116_A_03.UAF) |
2024-04-23 00:00:00 |
2024-114 |
13:05:00 |
ROBO Ops: Maneuver to SpX30 Undock Clear until 19:30 |
2024-04-23 00:00:00 |
2024-114 |
13:05:00 |
ROBO Ops: DWO N2, Xlate 4>2 until 114:23:55 |
2024-04-19 00:00:00 |
2024-110 |
12:20:07 |
NICER safe due to low number of GPS signals. Science plan interrupted from 24-110-12:20:07 - 24-110-12:30:03.\nAfter this second safe, we set Action Point 49 to PASSIVE, so that it would complain about failure but not trigger the RTS to Safe. |
2024-04-19 00:00:00 |
2024-110 |
04:41:49 |
NICER safe due to low number of GPS signals. Science plan interrupted from 24-110-04:41:49 - 24-110-07:08:10. |
2024-04-18 00:00:00 |
2024-109 |
00:20:00 |
ROBO Parked: TPS Inspection - Starboard Overnight Park\nMT - WS 4, SSRMS B on MBS 3\nSR = +229.9, +101.2, -74.2, -113.2, -105.8, +6.0, -151.5 = WR\nSPDM on MBS 2: BR = +60.0, EOTP = -90, body holding Stow\nSR1 = -50.00, -40.00, +80.00, +30.00, -80.00, -120.00, -50.00 = WR1\nSR2 = -120.00, -40.00, -80.00, -60.00, +40.00, -120.00, -20.00 = WR2 until 109-13:20 |
2024-04-18 00:00:00 |
2024-109 |
16:30:28 |
Updated EOPs and Reset GEONS Clock Bias |
2024-04-17 00:00:00 |
2024-108 |
13:55:00 |
ROBO Ops: SPDM Stow, Xlate 2>4, TPS Inspection Day 1 (FS) until 109-00:20 |
2024-04-16 00:00:00 |
2024-107 |
12:50:00 |
ROBO Ops: Xlate 3>2, RELL Setup, RELL Checkout until 108-4:00 |
2024-04-06 00:00:00 |
2024-097 |
03:21:00 |
Soyuz Undocking on CMG Control (70S from MRM1) (M24_097_A_05.UAF) |
2024-04-03 00:00:00 |
2024-094 |
12:50:00 |
ROBO: Ops: Xlate 7>3, RMCT Unstow, STP-H7 Setup Until 094-23:30 |
2024-04-02 00:00:00 |
2024-093 |
13:45:00 |
ROBO Ops MISSE Day 4 Until 094-01:00 |
2024-04-02 00:00:00 |
2024-093 |
00:51:37 |
Re-deployed NICER post ROBO MISSE Ops Day 4\nBackground data collection stopped at 24-093-00:27:35 z.\nScience plan started at 24-093-00:51:37z. |
2024-04-01 00:00:00 |
2024-092 |
13:30:00 |
ROBO Ops MISSE Day 3 Until 093-06:10 |
2024-04-01 00:00:00 |
2024-092 |
12:10:11 |
Stowed NICER for ROBO MISSE Ops Day 4\nScience plan stopped at 24-092-12:10:11z.\nBackground data collection started at 24-092-13:13:45z. |
2024-04-01 00:00:00 |
2024-092 |
08:45:00 |
70S Thruster Test on MM (M24_092_B_03.UAF) |
2024-03-31 00:00:00 |
2024-091 |
11:23:00 |
Re-deployed NICER after ROBO MISSE Ops (SpX-30) Day 1/2/3.\nBackground data collection stopped at 24-091-10:33:34z.\nScience resumed at 24-091-11:23:00z. |
2024-03-29 00:00:00 |
2024-089 |
13:30:00 |
ROBO Ops MISSE Day 1/2 Until 091-13:05 |
2024-03-29 00:00:00 |
2024-089 |
12:11:40 |
Stowed NICER for ROBO MISSE Ops Day 1/2/3 JOTI Extrct, Translate to WS2, Xfers)\nScience plan stopped at 24-089-12:11:40z.\nBackground data collection started at 24-089-12:56:28z. |
2024-03-28 00:00:00 |
2024-088 |
13:20:00 |
ROBO Ops MISSE Setup until 088-19:20 |
2024-03-27 00:00:00 |
2024-087 |
02:37:15 |
Re-deployed NICER after ROBO Ops: SpX-30 Day 3 (MBSU FSE Stow ELC-2 Site 4, PM Unstow N2Z Dragon Trunk)\nBackground data collection stopped at 24-087-02:14:24z.\nScience plan resumed at 24-087-02:37:15z. |
2024-03-26 00:00:00 |
2024-086 |
11:20:00 |
ROBO Ops SpX-30 Day 3 Until 087-05:50 |
2024-03-26 00:00:00 |
2024-086 |
09:58:01 |
Stowed NICER for ROBO Ops: SpX-30 Day 3 (MBSU FSE Stow ELC-2 Site 4, PM Unstow N2Z Dragon Trunk)\nScience plan stopped at 24-086-09:58:01.\nBackground data collection started at 24-086-10:33:53. |
2024-03-26 00:00:00 |
2024-086 |
02:35:00 |
RS OPM to pXVV Profile 12 (H24_086_B_03.UAF) |
2024-03-25 00:00:00 |
2024-085 |
01:58:00 |
RS OPM to nXVV Profile 5 (H24_084_A_03.UAF) |
2024-03-25 00:00:00 |
2024-085 |
10:13:00 |
71S 34orbit Docking to RSNode nadir (H24_085_B_03.UAF) |
2024-03-23 00:00:00 |
2024-083 |
09:35:00 |
Cargo Dragon Docking (SpX-30 to N2Z) (M24_083_A_08.UAF) |
2024-03-23 00:00:00 |
2024-083 |
10:56:01 |
Look-away commanding included in load for 2024-083-10:56:01 - 2024-083-11:36:01 for SpX-30 docking. Science plan interrupted during this time. |
2024-03-22 00:00:00 |
2024-082 |
04:00:00 |
RS OPM to pXVV Profile 14 (H24_082_A_13.UAF) |
2024-03-21 00:00:00 |
2024-081 |
03:26:00 |
RS OPM to nXVV Profile 6 (H24_081_B_07.UAF) |
2024-03-20 00:00:00 |
2024-080 |
15:56:08 |
Re-deployed NICER post SPDM LDU, MBSU ESP3 to ELC2 Site Transfers.\nBackground data collection stopped at 24-080-15:17:51z.\nScience resumed at 24-080-15:56:08z. |
2024-03-19 00:00:00 |
2024-079 |
12:00:00 |
ROBO Ops SpX-30 Day 2 Until 080-07:00 |
2024-03-19 00:00:00 |
2024-079 |
11:49:04 |
Stowed NICER for SPDM LDU, MBSU ESP3 to ELC2 Site Transfers. Science stopped at 24-079-11:49:04.\nBackground data collection started at 24-079-12:31:38. |
2024-03-13 00:00:00 |
2024-073 |
14:30:00 |
ROBO arm possibly in NICER FOV until 080-07:00 Ops: Xlate WS4 > WS2, SPDM_Unstow_Spx30_Setup \nParked: Xlate WS4 > WS2, SPDM_Unstow_Spx30_Setup\nMT - WS 2, SSRMS B on MBS 3, holding SPDM (GC)\nSR = -237.0, +75.0, -112.0, -159.0, +57.0, +3.0, +66.0 = WR\nSPDM on SSRMS: BR = -163.0, EOTP = -90\nSR1 = +84.00, +58.00, -90.00, +108.00, +13.00, -10.00, -153.00 = WR1\nSR2 = -55.00, -75.00, +55.00, -100.00, -20.00, -10.00, -25.00 = WR2 |
2024-03-11 00:00:00 |
2024-071 |
18:54:50 |
Updated EOPs and Reset GEONS Clock Bias |
2024-03-11 00:00:00 |
2024-071 |
14:45:00 |
Pointed NICER a little aft of starboard for the Crew-7 undock at the following times:\n2024-071-14:45:00 through 2024-071-15:34:20 |
2024-03-11 00:00:00 |
2024-071 |
14:30:00 |
Crew Dragon Undocking (Crew-7 from N2Z) (M24_071_A_05.UAF) Physical sep at 15:15 |
2024-03-10 00:00:00 |
2024-070 |
18:10:00 |
Crew-7 thruster test occurred today. Thrusting timeline per OC was 18:10z - pulses every three minutes. 3 sets complete by 18:20. However, NICER was looking away only from 2024-070-17:10:00 through 024-070-17:52:59. |
2024-03-07 00:00:00 |
2024-067 |
17:45:14 |
Created and uplinked RTS 152 and 153 for special detector configuration for TargetID 7160 and 5414\nTarget ID 7160 and 5414 The following detectors are disabled for these targets:\n1-8 2-8 4-8 6-8\n1-7 2-6 3-8 4-7 5-8\n4-5\n2-4 5-5\n2-3 4-3 5-4 6-3 7-7\n2-2 3-3 5-3\n2-1 7-2\n1-1 3-1 7-1 |
2024-03-05 00:00:00 |
2024-065 |
14:30:00 |
ROBO arm possibly in NICER FOV until 22:00 Ops: I70_SPDM_LEE_SURVEY |
2024-03-05 00:00:00 |
2024-065 |
05:53:00 |
Dragon Docking (Crew-8 to N2F) (M24_065_B_03.UAF) Soft Capture at 07:28 |
2024-03-05 00:00:00 |
2024-065 |
07:08:00 |
Added commanding to point NICER a little aft of starboard for Crew-8 docking from 24-065-07:08:00 through 2024-065-07:47:20. |
2024-02-28 00:00:00 |
2024-059 |
10:56:44 |
NICER Star tracker Imaging stuck until Star tracker was reset at 24-059-13:50:06 |
2024-02-23 00:00:00 |
2024-054 |
18:24:36 |
NICER Star tracker Imaging stuck until Star tracker was reset at 24-057-14:59:46 |
2024-02-21 00:00:00 |
2024-052 |
17:48:58 |
Performed NICER memory TMR checks. Operation was performed until 24-052-19:37:00. Possible science data gaps can be expected at these times. |
2024-02-16 00:00:00 |
2024-047 |
13:44:00 |
Commanded NICER Flash memory "bad" file deletions - commanding continued until 16:50:07 |
2024-02-15 00:00:00 |
2024-046 |
13:22:24 |
Commanded NICER Flash memory "bad" file deletions - commanding continued until 20:05 |
2024-02-08 00:00:00 |
2024-039 |
19:27:00 |
Updated EOPs and Reset GEONS Clock Bias |
2024-02-07 00:00:00 |
2024-038 |
14:04:00 |
Commanded in real-time NICER look-away from AX-3 departure from N2F port. NICER science plan interrupted from 23-038-24-038-14:04:00 through 24-038-14:35:44. |
2024-02-07 00:00:00 |
2024-038 |
13:30:00 |
Crew Dragon Undocking (Ax-3 from N2F) (M24_038_A_03.UAF) Physical sep at 038/14:05 |
2024-01-31 00:00:00 |
2024-031 |
16:44:08 |
Included in load commanding to point NICER XTI to EL=90, AZ=-45 from NICER science plan interrupted for AX-3 thruster firings from 24-031-16:44:08z to 24-031-17:39:48. |
2024-01-20 00:00:00 |
2024-020 |
10:24:02 |
Added commanding to load to have NICER look -45AZ, 90EL during AX-3 docking at N2F from 2024-020-10:24:02z to 2024-020-11:17:40z. Docking targeted for 10:44-10:57z. |
2024-01-20 00:00:00 |
2024-020 |
09:02:00 |
Crew Dragon Docking (Ax-3 to N2F) (M24_020_A_06.UAF) |
2024-01-11 00:00:00 |
2024-011 |
17:48:00 |
Performed NICER memory TMR checks. Boot2, boot3 and spare were corrupt. Renamed and replaced them. Operation was performed from 24-011-17:48:16 to 24-011-18:31:52 and from 24-011-19:21:28 to 24-011-19:56:26. Possible science data gaps can be expected at these times. |
2024-01-10 00:00:00 |
2024-010 |
22:33:00 |
Modified ATTILA so that TARGETID 5406 (Cen A) now uses the regular night time detector RTSs. |
2024-01-08 00:00:00 |
2024-008 |
20:42:39 |
Updated EOPs and Reset GEONS Clock Bias |
2024-01-08 00:00:00 |
2024-008 |
16:05:49 |
Modified ATTILA to use the normal night detector configuration for TARGETID = 5394 Swift J1727 |
2023-12-21 00:00:00 |
2023-355 |
21:30:00 |
Cargo Dragon Undocking (SpX-29 from N2F) (M23_355_R_06.UAF) Physical sep at 22:05:00 |
2023-12-21 00:00:00 |
2023-355 |
21:50:00 |
Commanded NICER to look starboard, away from SpX-29 undocking from 23-355-21:50 - 22:20. |
2023-12-14 00:00:00 |
2023-348 |
11:00:00 |
CMG Maneuver to Stage TEA (M23_348_A_05.UAF) |
2023-12-09 00:00:00 |
2023-343 |
00:01:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M23_343_A_03.UAF) |
2023-12-06 00:00:00 |
2023-340 |
13:15:56 |
Updated EOPs and Reset GEONS Clock Bias |
2023-12-06 00:00:00 |
2023-340 |
16:27:00 |
Added commanding to the load on DOY 23-340-16:27 to point starboard during the SpX-29 pre-departure thruster fire testing until 17:00:00 |
2023-12-04 00:00:00 |
2023-338 |
16:50:33 |
Turned detector 7-4 back on to take a look at how the annealing was going at 23-338-16:50:33. Turned it back off again for the day at 23-338-17:05:39. |
2023-12-03 00:00:00 |
2023-337 |
09:05:00 |
86P Docking MRM2 34 orbit (M23_337_R_08.UAF) Docking at 11:14:52 |
2023-12-03 00:00:00 |
2023-337 |
11:00:36 |
Added commands to load to point NICER starboard from 23-337-11:00:36 – 11:28:00 for 86P docking at MRM2 |
2023-12-01 00:00:00 |
2023-335 |
19:50:23 |
Turned on TEC and HV for Detector 6-6, to see if it was viable. TEC on at 23-335-19:50:23 and HV on at 23-335-19:52:15.\n6-6 not looking good, so TEC and HV off at 23-335-20:44:43.\nExisting Temp Setpoint = 1024\nExisting HV Output = 3020\nDisabled detector 6-6 at 23-335-20:47:50.\nBegan annealing detector 7-4. Disabled detector at 23-335-20:47:50, TEC and HV off at 23-335-20:45:40.\nExisting Temp Setpoint = 1024\nExisting HV Output = 3020\nRTS 25 updated to change it from a noop to detector disable 6-6 and 7-4. |
2023-11-20 00:00:00 |
2023-324 |
19:00:00 |
NICER FSW - Changed Action Point 48 and 49 max fails to 12000 (20 mins) from 7000 (13 mins). Trying to keep GPS jamming safes from occurring as frequently. |
2023-11-18 00:00:00 |
2023-322 |
18:16:53 |
NICER safe due to low number of GPS signals. Science plan interrupted from 32-322-18:16:53 - 18:35:04. |
2023-11-17 00:00:00 |
2023-321 |
10:36:54 |
Star Tracker Imaging got stuck at 23-321-10:36:54.351z. Reset the star tracker at 23-321-14:39:34z. |
2023-11-16 00:00:00 |
2023-320 |
18:14:57 |
NICER safe due to low number of GPS signals. Science plan interrupted from 32-320-18:14:57 – 18:41:44. |
2023-11-14 00:00:00 |
2023-318 |
09:31:22 |
Star tracker imaging got stuck at 23-318-09:31:22.718z. Reset the star tracker to fix issue at 23-318-14:08:41z. |
2023-11-11 00:00:00 |
2023-315 |
10:10:00 |
Added commands to load to point NICER starboard from 23-315-10:10 – 10:40 for SpX-29 docking at N2F. |
2023-11-11 00:00:00 |
2023-315 |
08:20:00 |
Cargo Dragon Docking (SpX-29 to N2F) (M23_315_A_03.UAF) |
2023-11-10 00:00:00 |
2023-314 |
13:57:00 |
PDAM - Aft Progress - MLM Roll (M23_314_B_04.UAF) |
2023-11-07 00:00:00 |
2023-311 |
20:50:00 |
Updated EOPs and Reset GEONS Clock Bias |
2023-11-03 00:00:00 |
2023-307 |
23:50:53 |
NICER Safe at 23-307-23:50:53z due to WP=32, AP=48 trip (GPS Data Invalid, GPS signals dropped out prior). NICER back collecting science at 23-308-00:07z. |
2023-11-02 00:00:00 |
2023-306 |
03:04:06 |
NICER Safe at 23-306-03:04:06z due to AP=49 trip (GPS Data Invalid, GPS jamming). NICER back collecting science at 23-306-03:50. |
2023-10-28 00:00:00 |
2023-301 |
05:28:33 |
NICER Safe at 23-301-05:28:33z due to AP=49 trip (GPS Data Invalid – GPS jamming). NICER back collecting science at 23-301-06:26:25z. |
2023-10-10 00:00:00 |
2023-283 |
16:07:00 |
ISS MLM-Nauka Russian Module coolant leak from the radiator almost completely stopped. Only residual coolant flaking off from external bubble occasionally.\nRestarted the science plan at 23-283-16:07. |
2023-10-09 00:00:00 |
2023-282 |
18:10:00 |
Updating the safe position for the ongoing MLM coolant leak. Commanded NICER to AZ=45, EL=100 at 23-282-18:10:00. |
2023-10-09 00:00:00 |
2023-282 |
17:34:16 |
Due to MLM coolant leak, Stopped the science plan at 23-282-17:34:16 and commanded NICER to AZ=180, EL=90. |
2023-10-09 00:00:00 |
2023-282 |
16:58:00 |
ISS MLM-Nauka Russian Module started leaking coolant from a radiator at ~ 282-16:58z. NICER team received email at 17:26z informing us of the leak. OC on voice loop said she thought the leak was coming from the AFT side and was moving forward. |
2023-10-08 00:00:00 |
2023-281 |
22:07:28 |
Star tracker imaging stuck at 23-281-11:10:39.318. Reset at 23-281-22:07:28. |
2023-10-08 00:00:00 |
2023-281 |
21:22:49 |
GEONS Diverged 23-281-11:49:59. Reset performed at 23-281-21:22:49. |
2023-10-06 00:00:00 |
2023-279 |
13:48:10 |
NICER GEONS Diverged since at least 23-279-10:45:19. Reloaded EOPS and reset GEONS |
2023-10-03 00:00:00 |
2023-276 |
12:51:03 |
NICER GEONS Diverged since at least 23-276-06:24:10. Reloaded EOPS and reset GEONS |
2023-10-02 00:00:00 |
2023-275 |
15:24:02 |
Uploaded RTS 11 (version 05) to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-09-28 00:00:00 |
2023-271 |
02:40:31 |
Deployed NICER post ROBO/MISSE operations - Day #3. NICER science plan resumed at 23-271-02:40:31. |
2023-09-27 00:00:00 |
2023-270 |
12:51:12 |
Stowed NICER for ROBO/MISSE operations - Day #3. NICER science plan stopped at 23-270-12:51:12. |
2023-09-27 00:00:00 |
2023-270 |
03:48:22 |
Deployed NICER post ROBO/MISSE operations - Day #2. NICER science plan resumed at 23-270-03:48:22. |
2023-09-26 00:00:00 |
2023-269 |
12:34:18 |
Stowed NICER for ROBO/MISSE operations - Day #2. NICER science plan stopped at 23-269-12:34:18. |
2023-09-26 00:00:00 |
2023-269 |
09:17:45 |
Deployed NICER post ROBO/MISSE operations - Day #1. NICER science plan resumed at 23-269-09:17:45. |
2023-09-25 00:00:00 |
2023-268 |
12:13:11 |
Stowed NICER for ROBO/MISSE operations - Day #1. NICER science plan stopped at 23-268-12:13:11. |
2023-09-23 00:00:00 |
2023-266 |
16:12:03 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 6-2, 7-7 |
2023-09-19 00:00:00 |
2023-262 |
13:03:12 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7 |
2023-09-18 00:00:00 |
2023-261 |
09:13:08 |
NICER GEONS Diverged since at least 23-261-08:35:05. Reloaded EOPS and reset GEONS |
2023-09-16 00:00:00 |
2023-259 |
06:29:00 |
RS OPM to pXVV Profile 11 (H23_259_A_03.UAF) |
2023-09-15 00:00:00 |
2023-258 |
05:39:00 |
RS OPM to nXVV Profile 3 (H23_258_B_03.UAF) |
2023-09-13 00:00:00 |
2023-256 |
13:20:05 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7 |
2023-09-03 00:00:00 |
2023-246 |
10:40:00 |
Crew Dragon Undocking (Crew-6 from N2F) (M23_246_A_03.UAF) |
2023-09-03 00:00:00 |
2023-246 |
10:35:57 |
Crew-6 Undock from N2F at 11:05z. NICER looked starboard from 2023-246-10:35:57 to 23-246-11:31:35. |
2023-09-01 00:00:00 |
2023-244 |
17:15:00 |
Modified running ATS to include look starboard away from Crew-6 Dragon Thruster Test. Science plan was interrupted from 2023-244-17:15:00 to 2023-244-17:56:40. |
2023-08-30 00:00:00 |
2023-242 |
16:13:36 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-08-30 00:00:00 |
2023-242 |
19:02:57 |
Fixed the NICER load building process to remove detector enable alls that were happening in day/night transitions accidentally during the RTS11 bright targets. |
2023-08-28 00:00:00 |
2023-240 |
19:49:55 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-08-28 00:00:00 |
2023-240 |
13:51:53 |
Updated EOPs and Reset GEONS Clock Bias |
2023-08-28 00:00:00 |
2023-240 |
00:47:00 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4 |
2023-08-27 00:00:00 |
2023-239 |
12:05:40 |
Commanded NICER to look starboard from 2023-239-12:05:40 to 2023-239-12:59:01 for Dragon Docking (Crew-7 to N2Z) |
2023-08-27 00:00:00 |
2023-239 |
11:34:00 |
Dragon Docking (Crew-7 to N2Z) (M23_239_B_02.UAF) |
2023-08-25 00:00:00 |
2023-237 |
23:25:46 |
Uploaded to NICER RTS 10,11 disable and enable detectors for ID 5394 in the following config\n1-2, 1-3, 2-1, 2-5, 2-6, 3-8, 4-3, 4-4, 5-4, 5-7, 5-8, 6-5, 6-7, 6-8 |
2023-08-24 00:00:00 |
2023-236 |
16:27:00 |
RS OPM to pXVV (M23_236_B_04.UAF) |
2023-08-24 00:00:00 |
2023-236 |
13:56:00 |
PDAM - SM ME - MLM Roll (M23_236_A_02.UAF) |
2023-08-24 00:00:00 |
2023-236 |
08:41:22 |
NICER Safe at 23-236-08:41:22z due to AP=49 trip (GPS Data Invalid - GPS jamming). NICER back collecting science at 23-236-09:10:37z. |
2023-08-12 00:00:00 |
2023-224 |
05:24:00 |
US OPM to pXVV with Timeliner Profile 13 (M23_224_A_05.UAF) |
2023-08-10 00:00:00 |
2023-222 |
23:57:00 |
US OPM to nXVV with Timeliner Profile 5 (M23_222_A_07.UAF) |
2023-08-10 00:00:00 |
2023-222 |
05:23:12 |
Performed GEONS reset after GPS reporting non-convergence |
2023-08-06 00:00:00 |
2023-218 |
00:55:00 |
PDAM - Aft Progress - MLM Roll (M23_217_B_06.UAF) |
2023-08-04 00:00:00 |
2023-216 |
07:50:00 |
Cygnus19 Capture (M23_215_A_03.UAF) |
2023-08-04 00:00:00 |
2023-216 |
11:54:00 |
Cygnus19 Install (M23_216_A_03.UAF) |
2023-08-03 00:00:00 |
2023-215 |
15:49:37 |
NICER entered SAFE mode at 23-215-15:49:37 due to GPS signal jamming. AP 49 tripped after ten minutes of invalid GPS data. Safe occurred during long TDRSS outage. NICER was recovered as soon as TDRSS was available. Science plan was resumed at 23-215-16:47:27. |
2023-08-01 00:00:00 |
2023-213 |
08:19:13 |
Power issues on ISS made POIC turn off our survival heaters at 23-213-08:19:13z. They were turned back on at 23-213-11:21ishz |
2023-07-31 00:00:00 |
2023-212 |
15:46:31 |
Pointed NICER at the MRM-2 FWD/STBD Window for Photo Survey. Science plan interrupted from 23-212-15:46:31 - 2023-212-16:32:19. |
2023-07-25 00:00:00 |
2023-206 |
20:16:00 |
Tried looking at the MRM-2 window twice and taking photos to see if we are pointed at the window.\nScience plan interrupted from 23-206-20:16:07 to 23-206-20:38:41. – Nothing seen on ST images\nScience plan interrupted from 23-207-00:44:05 to 23-207-01:13:47. – ST images a success. |
2023-07-25 00:00:00 |
2023-206 |
15:55:00 |
Star tracker Imaging was stuck. Reset the star tracker. Images not taken from 23-206-12:27:35.056 – 23-206-15:55:09. |
2023-07-24 00:00:00 |
2023-205 |
15:40:00 |
There was an APS-1 Outage on the ISS from about 205/15:40 – 17:40. This caused NICER data not to be routed and also not to be recorded on the ISS. |
2023-07-20 00:00:00 |
2023-201 |
17:09:53 |
Updated EOPs and Reset GEONS Clock Bias |
2023-07-09 00:00:00 |
2023-190 |
19:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude Mom Ramp First Use (M23_190_A_03.UAF) |
2023-07-06 00:00:00 |
2023-187 |
13:16:15 |
Reset the star tracker. Imaging was stuck from 23-186-22:03:51 - 23-187-13:16:15. |
2023-06-29 00:00:00 |
2023-180 |
16:20:00 |
Updated the ATS to look AZ = -45deg, El=88 deg during the SpX-28 Undock to avoid debris/contam.\nScience plan interrupted from 2023-180-16:20:00 to 23-180-16:44:00 |
2023-06-29 00:00:00 |
2023-180 |
15:30:00 |
Cargo Dragon Undocking (SpX-28 from N2Z) (M23_180_A_03.UAF) |
2023-06-27 00:00:00 |
2023-178 |
16:43:41 |
SpX-28 is performing a hot-fire thruster test from 16:55 – 17:55z today. Updated the ATS to look AZ = -45deg, El=88 deg during the 2023-178-16:43:41z to 2023-178-18:04:20z, to avoid the plume. Test ended early so manually commanded back to nominal science. Science plan interrupted from 23-178-16:43:40 to 23-178-17:42:58. |
2023-06-15 00:00:00 |
2023-166 |
09:57:00 |
IROSA 1B Install EVA (M23_166_A_05.UAF) |
2023-06-13 00:00:00 |
2023-164 |
19:49:08 |
Pointed NICER in the direction of ISS EHDC1 and EHDC7 cameras and CRONUS took video and stills.\nScience plan interrupted from 23-164-19:49:08z to 23-164-21:00:12z. |
2023-06-12 00:00:00 |
2023-163 |
20:59:44 |
Updated EOPs and Reset GEONS Clock Bias |
2023-06-09 00:00:00 |
2023-160 |
20:40:19 |
Maneuvered NICER to look at ISS camera for High Def video survey. Science Plan interrupted from 23-160-20:40:19 to 23-160-22:29:45. |
2023-06-09 00:00:00 |
2023-160 |
09:07:00 |
IROSA 1A Install EVA (M23_160_A_07.UAF) |
2023-06-06 00:00:00 |
2023-157 |
09:50:00 |
Cargo Dragon Docking (SpX-28 to N2Z) (M23_157_B_03.UAF) |
2023-06-06 00:00:00 |
2023-157 |
09:14:53 |
Added commands to load to look port side during SpX-28 157-09:50:00 dock. Science plan interrupted from 23-157-09:14:53 to 23-157-10:10:00. |
2023-06-06 00:00:00 |
2023-157 |
19:36:31 |
Loaded NICER FSW RTSs 224 - 227 (version 4) which adjust the nominal MPU threshold settings by +35 from nominal. Ran them at 19:36:31 |
2023-06-02 00:00:00 |
2023-153 |
14:55:54 |
Loaded NICER FSW RTSs 224 - 227 (version 3) which adjust the nominal MPU threshold settings by +30 from nominal. Ran them at 14:55:54 |
2023-06-01 00:00:00 |
2023-152 |
20:34:48 |
Modified the NICER ATS load builder to use the day crossing to call RTS 224-227 to set MPU threshold settings to nominal + 50 and to call RTS 220-223 at night crossing to set thresholds back to nominal values. |
2023-06-01 00:00:00 |
2023-152 |
15:40:37 |
Started NICER FSW RTSs 224-227 which adjust the nominal MPU threshold settings by 50. |
2023-06-01 00:00:00 |
2023-152 |
14:51:03 |
Tested NICER FSW RTSs 220-223 which command the MPU thresholds back to nominal settings. |
2023-06-01 00:00:00 |
2023-152 |
14:00:55 |
Loaded NICER FSW RTSs 224 - 227 (version 2) which adjust the nominal MPU threshold settings by 50. Ran them at 14:06:56. |
2023-06-01 00:00:00 |
2023-152 |
00:29:47 |
Adjusted MPU detector threshold settings by 50 counts from nominal. |
2023-05-31 00:00:00 |
2023-151 |
23:19:10 |
Adjusted MPU detector threshold settings by 100 counts from nominal. |
2023-05-31 00:00:00 |
2023-151 |
22:10:45 |
Adjusted MPU detector threshold settings by 140 counts from nominal. |
2023-05-31 00:00:00 |
2023-151 |
21:19:23 |
Adjusted MPU detector threshold settings by 230 counts from nominal. |
2023-05-30 00:00:00 |
2023-150 |
22:32:00 |
Modified the ATS load builder to re-enable the detectors after transitioning from day to night if target spanned across the boundary. |
2023-05-30 00:00:00 |
2023-150 |
18:57:32 |
Pointed NICER head at an external ISS camera that had been looking at MISSE. Science plan interrupted until 19:12:47 |
2023-05-30 00:00:00 |
2023-150 |
15:03:19 |
Pointed NICER head away from AX-2 undocking. Science plan interrupted until 15:15:56 |
2023-05-30 00:00:00 |
2023-150 |
14:27:00 |
Crew Dragon Undocking (Ax-2 from N2Z) (M23_150_A_03.UAF) |
2023-05-25 00:00:00 |
2023-145 |
15:45:00 |
ROBO Ops: I69 SPDM Stow and reconfigure for TPS Survey\nOps: Xlate from WS 2 to WS4\nIN NICER FOV possibly until 22:15 |
2023-05-25 00:00:00 |
2023-145 |
03:39:00 |
RS OPM to pXVV (M23_145_A_12.UAF) |
2023-05-24 00:00:00 |
2023-144 |
03:08:00 |
RS OPM to nXVV (H23_144_B_07.UAF) |
2023-05-22 00:00:00 |
2023-142 |
12:00:00 |
Dragon Docking (Ax-2 to N2Z) (M23_142_A_08.UAF) |
2023-05-22 00:00:00 |
2023-142 |
13:45:00 |
Start of NICER light leak |
2023-05-12 00:00:00 |
2023-132 |
12:51:11 |
Updated EOP and reset GEONS clock bias |
2023-05-11 00:00:00 |
2023-131 |
22:10:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M23_131_A_03.UAF) |
2023-05-06 00:00:00 |
2023-126 |
10:35:00 |
Dragon Port Relocate (Crew-6 from N2Z to N2F) (M23_126_A_05.UAF) |
2023-04-15 00:00:00 |
2023-105 |
14:27:00 |
Cargo Dragon Undocking (SpX-27 from N2F) (M23_105_A_03.UAF) |
2023-04-13 00:00:00 |
2023-103 |
15:52:00 |
SpX-27 Dedicated Thruster Firing Test (M23_103_A_08.UAF) |
2023-04-10 00:00:00 |
2023-100 |
00:15:28 |
Updated EOP and reset GEONS clock bias |
2023-04-04 00:00:00 |
2023-094 |
05:14:00 |
Deployed NICER post MISSE ROBO Operations Day 5 |
2023-04-04 00:00:00 |
2023-094 |
05:03:53 |
Updated EOP and reset GEONS clock bias |
2023-04-03 00:00:00 |
2023-093 |
11:59:33 |
Stowed NICER for MISSE ROBO Operations Day 5 |
2023-04-03 00:00:00 |
2023-093 |
03:54:40 |
Deployed NICER post MISSE ROBO Operations Day 4 |
2023-04-03 00:00:00 |
2023-093 |
03:41:48 |
Updated EOP and reset GEONS clock bias |
2023-04-02 00:00:00 |
2023-092 |
05:40:23 |
Updated EOP and reset GEONS clock bias |
2023-04-02 00:00:00 |
2023-092 |
11:55:12 |
Stowed NICER for MISSE ROBO Operations Day 4 |
2023-04-02 00:00:00 |
2023-092 |
05:56:42 |
Deployed NICER post MISSE ROBO Operations Day 3 |
2023-04-01 00:00:00 |
2023-091 |
11:59:13 |
Stowed NICER for MISSE ROBO Operations Day 3 |
2023-03-31 00:00:00 |
2023-090 |
19:44:00 |
US OPM to pXVV with Timeliner Profile 14 (M23_090_A_05.UAF) |
2023-03-29 00:00:00 |
2023-088 |
14:13:28 |
Updated EOP and reset GEONS clock bias |
2023-03-29 00:00:00 |
2023-088 |
16:37:00 |
US OPM to nXVV with Timeliner Profile 6 (M23_088_A_03.UAF) |
2023-03-29 00:00:00 |
2023-088 |
14:07:36 |
Deployed NICER post MISSE ROBO Operations Day 2 |
2023-03-28 00:00:00 |
2023-087 |
00:15:00 |
Deployed NICER post MISSE ROBO Operations Day 1 |
2023-03-28 00:00:00 |
2023-087 |
08:54:00 |
Soyuz Undocking on RS Control 68S from MRM1 (H23_087_R_07.UAF) |
2023-03-28 00:00:00 |
2023-087 |
20:48:53 |
Stowed NICER for MISSE ROBO Operations Day 2 |
2023-03-27 00:00:00 |
2023-086 |
23:54:49 |
Updated EOP and reset GEONS clock bias |
2023-03-27 00:00:00 |
2023-086 |
10:54:18 |
Stowed NICER for MISSE ROBO Operations Day 1 |
2023-03-16 00:00:00 |
2023-075 |
10:15:00 |
Dragon Docking (SpX-27 to N2F) (M23_075_A_07.UAF) |
2023-03-14 00:00:00 |
2023-073 |
10:44:00 |
PDAM Aft Progress MLM Roll (M23_073_A_02.UAF) |
2023-03-11 00:00:00 |
2023-070 |
06:41:00 |
Crew Dragon Undocking (Crew-5 from N2F) (M23_070_B_03.UAF) |
2023-03-08 00:00:00 |
2023-067 |
18:33:00 |
Uploaded updated versions of RTS 250 and 251 to disable subset of detectors at <70 degrees |
2023-03-07 00:00:00 |
2023-066 |
13:37:00 |
The target catalog had bad coordinates for the COMET and thus PC rejected the pointing command and NICER stopped until the next target was commanded from the load.\n\nNICER stopped from 23-066-13:37:17.721 to 23-066-14:12:43.621 |
2023-03-06 00:00:00 |
2023-065 |
11:32:00 |
GMT 065 PDAM Aft Progress MLM Roll (M23_065_E_03.UAF) |
2023-03-06 00:00:00 |
2023-065 |
05:15:00 |
During a comet observation we had the wrong coordinates for the target in the catalog.\n\nPC wouldn’t accept the target, so NICER stopped.\nNICER stopped from 05:15:59 to 05:32:03 |
2023-03-03 00:00:00 |
2023-062 |
04:25:00 |
Crew Dragon Docking (Crew-6 to N2Z) (M23_062_B_05.UAF) |
2023-03-01 00:00:00 |
2023-060 |
20:17:00 |
Changed MAX recorder file size for science files (index 1) to 20MB. (Trying to alleviate problem with data storage not disabling) |
2023-02-28 00:00:00 |
2023-059 |
15:54:00 |
Uploaded a modified RTS 243 to include disabling of 7-7, 2-3 and 2-6 at < 53 deg sun angle. |
2023-02-27 00:00:00 |
2023-058 |
17:37:00 |
Updated EOP and reset GEONS clock bias |
2023-02-26 00:00:00 |
2023-057 |
15:02:00 |
RS OPM to pXVV (H23_057_A_05.UAF) |
2023-02-25 00:00:00 |
2023-056 |
00:55:03 |
NICER Safe due to ISS maneuver (ISS maneuver action points were not disabled.)\n\nNICER Science downtime from 23-057-00:55:03 to 23-057-01:54:53. |
2023-02-25 00:00:00 |
2023-056 |
01:51:00 |
RS OPM to nXVV (H23_056_A_03.UAF) |
2023-02-21 00:00:00 |
2023-052 |
15:59:00 |
Added disable of detector 2-4 for sun angled less than 60 degrees. Uploaded RTS241_v09. |
2023-02-21 00:00:00 |
2023-052 |
14:24:00 |
Reset the star tracker due to stuck imaging. Unfortunately, commanded the reset during a BBO. :( Resulted in Safe Mode. Science interrupted from 23-052-14:24 – 23-052-14:26:42 |
2023-02-20 00:00:00 |
2023-051 |
15:38:00 |
Added detector 4-3 to the set of detectors that get disabled at low sun angles (RTS 241). Uplinked and enabled RTS 241 for this change. |
2023-02-18 00:00:00 |
2023-049 |
22:42:00 |
RS OPM to pXVV (H23_050_B_03.UAF) |
2023-02-18 00:00:00 |
2023-049 |
02:19:00 |
Disabled OHMAN TOO response (MAXI was giving overnight multiple triggers in a row which we think were false)\n\nUploaded an ATS in the A buffer that we will switch to from the load running in the B buffer 5 minutes prior to the 82P undock. ATS A will point the head away from the undock in case of contamination AZ=90deg, EL=88 deg. It will then switch back to the science ATS 3 hours later.\n\nWhen the load commanded the head to EL 88 deg it hit the softstop and tripped the EL fault. This had to be cleared before we could go back to science pointing.\n\nSCIENCE INTERRUPTED FROM 2023-049-02:19:00 UNTIL 23-049-03:47:54 |
2023-02-16 00:00:00 |
2023-047 |
14:36:00 |
Uplinked RTS rts242_02.dat so that detectors were disabled at low sun angles. -TURNS OUT THAT 242 was not the correct version on-board and was not turning off all the detectors.\n\nLoaded NICER V2_7_1_6 CCR #040 WP/AP updated for Data Storage Management and modified RTS 70 and RTS 244 to enable AP 111 and 110. |
2023-02-15 00:00:00 |
2023-046 |
15:00:00 |
NICER GSFC SPOCC SEN firewall reverted to previous since GSE packets weren't being received. |
2023-02-15 00:00:00 |
2023-046 |
20:36:00 |
Modified and uplinked RTS rts243_06.dat so that Detector 4-3 was disabled at low sun angles. Was playing around with detector configuration from 20:30 through 20:40. |
2023-02-15 00:00:00 |
2023-046 |
15:30:00 |
CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_046_A_03.UAF) |
2023-02-14 00:00:00 |
2023-045 |
15:00:00 |
NICER GSFC SPOCC firewall upgrade - GSE packets 603 and 611 not being received. |
2023-02-09 00:00:00 |
2023-040 |
04:09:44 |
NICER star tracker imaging stuck. ST reset at 13:56 |
2023-02-03 00:00:00 |
2023-034 |
19:50:00 |
CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_034_B_03.UAF) |
2023-01-31 00:00:00 |
2023-031 |
17:12:00 |
Turned MPU 6-5 back on and then back off again. |
2023-01-31 00:00:00 |
2023-031 |
16:55:00 |
Ran the happy pill for MPU 7-4 |
2023-01-24 00:00:00 |
2023-024 |
18:07:46 |
MPU 6-6 detector annealing started |
2023-01-24 00:00:00 |
2023-024 |
17:20:00 |
Ops: MSS Uplink and Checkouts, SSRMS Motion Requred for Checkouts - ROBO in NIVER FOV until 1/25/2023 16:00 |
2023-01-23 00:00:00 |
2023-023 |
19:15:01 |
Updated EOP and reset GEONS clock bias |
2023-01-09 00:00:00 |
2023-009 |
21:33:00 |
Cargo Dragon Undocking (SpX-26 from N2Z) (M23_009_A_03.UAF) |
2023-01-04 00:00:00 |
2023-004 |
18:02:00 |
SpX-26 Dedicated Thruster Firing Test (M23_004_A_05.UAF) |
2023-01-04 00:00:00 |
2023-004 |
17:44:00 |
After ATS commanded NICER to a target change at 2023-004-17:44:00, the AZ motor failed to move the head again and NICER did not track the target. Operator noticed NICER was not tracking and enabled the sun angle violation APs that were still disabled from the morning safe, so that NICER would safe again, since cause of not being able to track was unknown at the time. Operator tried to move head in AZ direction again without success.\n\nEngineers (Alice and Gary) were called in and team was able to “unstick” the AZ by commanding multiple slower movements of the head in the AZ direction.\n\nScience was resumed at 23-004-22:25:48. |
2023-01-04 00:00:00 |
2023-004 |
10:53:27 |
NICER entered safe mode at FSW AP #66 (AZ Sun angle violation) tripped at 23-004-10:53:27.062. This due to sticky AZ motor not being able to move the head to the commanded target.\nOperator recovered to science collection at 23-004-12:18:40. |
2023-01-03 00:00:00 |
2023-003 |
03:32:00 |
NICER entered safe mode due to Action Point 48 FDC. Too few GPS signals. Alerting system was down, so operators didn’t see until around 13:00 at which time recovery commenced. Total Science downtime was from 23-003-03:32 until 23-003-13:37:38 |
2023-01-03 00:00:00 |
2024-003 |
21:12:17 |
Loaded RTS 150_v00 and 151_v00 and v01 to enable detectors for ID 5406 in the following config:\n1-1, 2-8, 4-1, 5-1, 6-1, 7-7. Spent some time from 20:53 to 21:07 trying different detector configurations for this targetid in real-time. |
2022-12-22 00:00:00 |
2022-356 |
11:08:00 |
US EVA IROSA 4A Install (M22_356_D_03.UAF) |
2022-12-21 00:00:00 |
2022-355 |
12:32:00 |
PDAM AftProgress MLM Roll (M22_355_E_02.UAF) |
2022-12-16 00:00:00 |
2022-350 |
20:15:10 |
Updated EOP and reset GEONS clock bias |
2022-12-15 00:00:00 |
2022-349 |
03:00:55 |
NICER safed due to ST attitude divergence either from debris moving through FOV or the star tracker imaging\nNICER's head was pointed away from the direction of the debris to aviod contamination.\nRussian EVA on 349 was scrubbed due to leak.\nScience target tracking was resumed at 18:03:15 |
2022-12-15 00:00:00 |
2022-349 |
01:00:00 |
At ~01:00UTC HOSC received a warning of low pressure in MRM-1 thermal control loop. Shortly after, a large amount of particulate was seen being released from the FGB Nadir Soyuz. Leaking substance is Isooctance or 2,2,4-Trimethylpentane. Leak was pluming in the forward direction, towards the US segment, and more starboard. |
2022-12-10 00:00:00 |
2022-344 |
14:08:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_344_A_05.UAF) |
2022-12-06 00:00:00 |
2022-340 |
15:00:00 |
HOSC turned on NICER survival heater after IROSA install |
2022-12-03 00:00:00 |
2022-337 |
10:37:00 |
US EVA IROSA 3A Install (M22_337_B_05.UAF) - Panel is on the starboard side of the ISS and near NICER |
2022-12-03 00:00:00 |
2022-337 |
07:00:00 |
HOSC Turned off NICER survival heater for IROSA install. |
2022-11-30 00:00:00 |
2022-334 |
20:30:00 |
ROBO Ops: SSRMS Mnvr, MT Translate WS 4>1, WO MBS 4, IROSA 3A EVA Setup until 335-03:00 |
2022-11-27 00:00:00 |
2022-331 |
10:45:00 |
Cargo Dragon Docking (SpX-26 to N2Z) (M22_331_A_03.UAF) |
2022-11-16 00:00:00 |
2022-320 |
03:17:15 |
OPM to pXVV with Timeliner Profile 14 (M22_320_A_05.UAF) |
2022-11-15 00:00:00 |
2022-319 |
19:30:00 |
ROBO Ops: Mnvr to Spx-26 Setup until 20:00 |
2022-11-14 00:00:00 |
2022-318 |
21:51:16 |
OPM to nXVV with Timeliner Profile 6 (M22_318_A_05.UAF) |
2022-11-08 00:00:00 |
2022-312 |
12:53:58 |
Updated EOP and reset GEONS clock bias - GEONS not converged |
2022-11-08 00:00:00 |
2022-312 |
23:35:17 |
Updated EOP and reset GEONS clock bias - GEONS not converged |
2022-11-07 00:00:00 |
2022-311 |
15:56:02 |
Reset NICER star tracker after noticing that imaging was stuck |
2022-11-02 00:00:00 |
2022-306 |
15:16:47 |
NICER in safe mode due to low sun angle constraint violation while slewing to TargetID=1970. NICER back collecting science at 15:23:51 |
2022-10-30 00:00:00 |
2022-303 |
11:08:38 |
MPU1 powered off due to SEU. Fully recovered at 22-303-14:04:10 |
2022-10-28 00:00:00 |
2022-301 |
14:27:00 |
RS OPM to pXVV (H22_301_B_03.UAF) |
2022-10-27 00:00:00 |
2022-300 |
15:12:00 |
RS OPM to nXVV (H22_300_A_05.UAF) |
2022-10-24 00:00:00 |
2022-297 |
23:15:00 |
PDAM Aft Progress 81P MLM Roll (M22_297_B_03.UAF) |
2022-10-17 00:00:00 |
2022-290 |
18:17:00 |
PDAM Aft Progress MLM Roll (M22_290_B_02.UAF) |
2022-10-14 00:00:00 |
2022-287 |
15:30:00 |
Crew Dragon Undocking (Crew-4 from N2Z) (M22_287_R_03.UAF) |
2022-10-06 00:00:00 |
2022-279 |
19:20:00 |
Crew Dragon Docking (Crew-5 to N2F) (M22_279_A_03.UAF) |
2022-09-26 00:00:00 |
2022-269 |
14:30:00 |
CTC3 Unstow Setup - ROBO possibly in FOV until 270-04:30 |
2022-09-22 00:00:00 |
2022-265 |
05:01:00 |
US OPM to pXVV with MMO3 (M22_265_A_03.UAF) |
2022-09-21 00:00:00 |
2022-264 |
05:32:00 |
RS OPM to nXVV (H22_264_B_04.UAF) |
2022-09-20 00:00:00 |
2022-263 |
15:14:11 |
Updated EOP and reset GEONS clock bias |
2022-09-12 00:00:00 |
2022-255 |
14:30:00 |
CTC3 Unstow Setup - ROBO possibly in FOV until 256-04:30 |
2022-09-08 00:00:00 |
2022-251 |
10:17:15 |
NICER FSW Action Point 126 tripped (IM reporting MPU4 no data received) causing RTS 65 to power off MPU4.\nNICER was not in SAA or either horn. Likely SEU on the PDB MPU 4 fully recovered at 22-251-12:15:54 |
2022-08-19 00:00:00 |
2022-231 |
14:30:00 |
Cargo Dragon Undocking (SpX-25 from N2F) (M22_231_A_03.UAF) |
2022-08-03 00:00:00 |
2022-215 |
00:18:45 |
Deployed NICER Post-MISSE ROBO Ops Day 3 |
2022-08-02 00:00:00 |
2022-214 |
04:22:16 |
Deployed NICER Post-MISSE ROBO Ops Day 2. |
2022-08-02 00:00:00 |
2022-214 |
12:18:32 |
Stowed NICER for MISSE ROBO Operations Day 3 |
2022-08-01 00:00:00 |
2022-213 |
05:08:08 |
Deployed NICER post MISSE ROBO Ops Day 1 |
2022-08-01 00:00:00 |
2022-213 |
12:20:20 |
Stowed NICER for MISSE ROBO Ops Day 2. |
2022-07-31 00:00:00 |
2022-212 |
12:20:28 |
Stowed NICER for MISSE ROBO Ops Day 1 |
2022-07-16 00:00:00 |
2022-197 |
13:25:00 |
Cargo Dragon Docking (SpX-25 to N2F) (M22_197_B_07.UAF) |
2022-07-11 00:00:00 |
2022-192 |
03:30:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_192_A_07.UAF) |
2022-07-07 00:00:00 |
2022-188 |
16:10:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_188_A_05.UAF) |
2022-06-26 00:00:00 |
2022-177 |
07:15:00 |
US OPM to pXVV with Timeliner Profile 11 (M22_177_A_03.UAF) |
2022-06-25 00:00:00 |
2022-176 |
03:23:00 |
US OPM to nXVV with Timeliner Profile 3 (M22_176_B_02.UAF) |
2022-06-21 00:00:00 |
2022-172 |
03:55:00 |
US OPM to pXVV with Timeliner Profile 11 (M22_172_B_05.UAF) |
2022-06-19 00:00:00 |
2022-170 |
15:43:00 |
US OPM to nXVV with Timeliner Profile 3 (M22_170_B_03.UAF) |
2022-06-16 00:00:00 |
2022-167 |
17:53:00 |
81P PDAM (M22_167_B_02.UAF) |
2022-06-10 00:00:00 |
2022-161 |
14:45:55 |
Detector 5-4 looked out of family so we reset it |
2022-05-27 00:00:00 |
2022-147 |
19:10:48 |
Updated EOP and reset GEONS clock bias |
2022-05-25 00:00:00 |
2022-145 |
17:30:00 |
CST-100 Undocking (OFT-2 on N2F) (M22_145_A_05.UAF) |
2022-05-20 00:00:00 |
2022-140 |
20:00:00 |
CST-100 Docking (OFT-2 to N2F) (M22_140_A_05.UAF) |
2022-05-19 00:00:00 |
2022-139 |
13:26:00 |
NICER Flash Image TMR checks and maintenance. |
2022-05-16 00:00:00 |
2022-136 |
23:05:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_136_A_03.UAF) |
2022-05-13 00:00:00 |
2022-133 |
01:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_133_A_08.UAF) |
2022-05-09 00:00:00 |
2022-129 |
04:10:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_129_A_03.UAF) |
2022-05-05 00:00:00 |
2022-125 |
04:37:00 |
Dragon Undocking (Crew-3 from N2F) (M22_125_D_02.UAF) |
2022-04-27 00:00:00 |
2022-117 |
22:25:00 |
Crew Dragon Docking (Crew-4 to N2Z) (M22_118_D_03.UAF) |
2022-04-26 00:00:00 |
2022-116 |
05:05:00 |
ROBO Parked Post Translate in NICER FOV until 22-126-13:20 |
2022-04-25 00:00:00 |
2022-115 |
00:20:00 |
Dragon Undocking (Axiom-1 from N2Z) (M22_115_B_03.UAF) |
2022-04-19 00:00:00 |
2022-109 |
15:56:00 |
Updated EOP and reset GEONS clock bias |
2022-04-09 00:00:00 |
2022-099 |
11:30:00 |
Added commanding to load to look starboard from 99-11:30 to 99-11:55 due to Axiom-1 docking at N2Z. |
2022-04-09 00:00:00 |
2022-099 |
09:55:00 |
Dragon Docking (Axiom-1 to N2Z) (M22_099_B_03.UAF) |
2022-04-05 00:00:00 |
2022-095 |
17:32:00 |
Science downtime between 22-095-17:32 and22-095-17:40 (8 minutes) due timing of the ATS switchover |
2022-03-31 00:00:00 |
2022-090 |
23:40:00 |
ROBO Parked MT Translate Config until 22-103-15:20. Parked in NICER FOV. |
2022-03-26 00:00:00 |
2022-085 |
18:05:00 |
MT Translate WS6 2 |
2022-03-26 00:00:00 |
2022-085 |
19:00:00 |
Ops: MT Translate 6 to 2 - ROBO in FOV until 095-17:45 |
2022-03-19 00:00:00 |
2022-078 |
06:39:00 |
RS OPM to pXVV |
2022-03-18 00:00:00 |
2022-077 |
05:51:00 |
RS OPM to -XVV |
2022-03-11 00:00:00 |
2022-070 |
23:17:58 |
Updated EOP and reset GEONS clock bias |
2022-02-07 00:00:00 |
2022-038 |
14:30:00 |
Ops: Walkoff to MBS3, Mnvr to translate config - ROBO in FOV until 038-18:30 |
2022-02-05 00:00:00 |
2022-036 |
21:58:00 |
MPU7 SEU caused all MPU7 detectors to be offline. Recovered at 036-23:23. |
2022-02-03 00:00:00 |
2022-034 |
15:00:00 |
Ops: MT Translate WS 7 to WS 2 - ROBO in FOV until 034-22:00 |
2022-01-31 00:00:00 |
2022-031 |
13:26:14 |
Updated EOP and reset GEONS clock bias |
2022-01-23 00:00:00 |
2022-023 |
15:05:00 |
Dragon Undocking (SpX-24 from N2Z) (M22_023_A_03.UAF) |
2022-01-20 00:00:00 |
2022-020 |
16:30:47 |
Pointed NICER starboard during SpX-24 Thruster Hot Fire Testing. Science plan was stopped at 22-020-16:30:47z and resumed at 22-020-17:36:48 |
2022-01-14 00:00:00 |
2022-014 |
15:40:00 |
Ops: SPDM Stow, Triple Walkoff, MT translate 3 to 4. Impacts NICER FOV until 22-015-04:00 |
2022-01-11 00:00:00 |
2022-011 |
12:10:00 |
Ops: SPX24 Day 3 STP-H7 Install. Impacts NICER FOV until 22-011-19:40 |
2022-01-11 00:00:00 |
2022-011 |
19:40:00 |
ROBO Parked for SPX24 Day 3 in our FOV. Impacts until 22-014-15:40 |
2022-01-10 00:00:00 |
2022-010 |
16:10:00 |
ROBO Parked for SPX24 Day 2 in our FOV. Impacts until 22-011-12:10 |
2022-01-10 00:00:00 |
2022-010 |
10:25:00 |
Ops: SPX24 Day 2 ASIM Transfer. Impacts NICER FOV until 22-010-16:10 |
2022-01-08 00:00:00 |
2022-008 |
09:00:00 |
ROBO Parked for ASIM Relocate in our FOV. Impacts until 22-010-10:25 |
2022-01-08 00:00:00 |
2022-008 |
08:00:00 |
Ops: ASIM Relocate Setup. Impacts NICER FOV until 09:00 |
2021-12-29 00:00:00 |
2021-363 |
03:49:17 |
Performed FSW Target Manager App update to version 2.0.0 at 21-363-03:49:17z to support future OHMAN ToOs. |
2021-12-28 00:00:00 |
2021-362 |
13:05:00 |
Stowed NICER because of MISSE Ops Day 3. Configured for background measurements. Science resumed at 21-363-04:04:23 |
2021-12-27 00:00:00 |
2021-361 |
12:42:22 |
Stowed NICER because of MISSE Ops Day 2. Configured for background measurements. Science resumed at 21-362-06:26:33 |
2021-12-26 00:00:00 |
2021-360 |
12:45:13 |
Stowed NICER because of MISSE Ops Day 1. Configured for background measurements. Science resumed at 21-361-07:16:50. |
2021-12-24 00:00:00 |
2021-358 |
07:52:00 |
RS OPM to pXVV |
2021-12-22 00:00:00 |
2021-356 |
06:54:00 |
Cargo Dragon Docking (SpX-24 to N2Z) |
2021-12-20 00:00:00 |
2021-354 |
14:03:50 |
Updated EOP and reset GEONS clock bias |
2021-12-11 00:00:00 |
2021-345 |
20:40:00 |
Yaw Bias Maneuver |
2021-12-09 00:00:00 |
2021-343 |
00:57:00 |
RS OPM to pXVV |
2021-12-08 00:00:00 |
2021-342 |
01:24:00 |
RS OPM to nXVV |
2021-12-03 00:00:00 |
2021-337 |
06:48:00 |
79P 180 Degree PDAM |
2021-12-03 00:00:00 |
2021-337 |
15:48:00 |
OPM to pXVV with Timeliner Profile 13 |
2021-12-01 00:00:00 |
2021-335 |
15:58:26 |
Reset the star tracker to clear stuck imaging that started at 21-334-22:38:46 |
2021-11-27 00:00:00 |
2021-331 |
03:02:00 |
RS OPM to pXVV |
2021-11-26 00:00:00 |
2021-330 |
00:56:00 |
US OPM to nXVV with Timeliner Profile 6 |
2021-11-11 00:00:00 |
2021-315 |
22:00:00 |
Crew-3 Dragon Docking to N2F |
2021-11-10 00:00:00 |
2021-314 |
19:05:00 |
PDAM Aft Progress MLM Roll |
2021-11-09 00:00:00 |
2021-313 |
14:02:17 |
Updated EOP and reset GEONS clock bias |
2021-11-08 00:00:00 |
2021-312 |
18:40:00 |
Dragon Undocking - physical sep at 19:05:00 |
2021-11-04 00:00:00 |
2021-308 |
16:35:00 |
Desat Enable |
2021-11-03 00:00:00 |
2021-307 |
16:35:55 |
Stopped NICER science plan and pointed starboard for Crew-2 thruster fire test. Science plan resumed at 17:02:27 |
2021-11-03 00:00:00 |
2021-307 |
15:00:00 |
Crew-2 Thruster Test on US Control - thruster fire at 16:40 |
2021-10-15 00:00:00 |
2021-288 |
09:13:00 |
LoAC Response - High ISS attitude error leading to Loss of CMG Attitude Control and Loss of ISS Attitude Control\nAt 0913 we were in a declared LOAC that reached a max attitude of 58deg negative pitch @ 0924.\nADCO reported stationed returned to its correct attitude @ 0955.\nPOIC resumed normal operations @ 1007 with command enablement’s back in place by 1009.\nPossible SA obstructions until about 22:00 |
2021-10-15 00:00:00 |
2021-288 |
08:45:00 |
SW Thruster Disable for 64S Thruster Test Part 2 - NICER viewed the CRAB during this time. Attitude may be off nominal due to anomaly described in next row. |
2021-10-04 00:00:00 |
2021-277 |
14:12:00 |
Updated EOP and reset GEONS clock bias |
2021-09-30 00:00:00 |
2021-273 |
12:24:00 |
Dragon Undocking (SpX-23 from N2F) |
2021-09-30 00:00:00 |
2021-273 |
17:20:00 |
RMCT2 Stow, Manvr to RELL Setup - ROBO arm may be in and out of NICER FOV until 273-22:20 |
2021-09-29 00:00:00 |
2021-272 |
02:26:00 |
OPM to pXXV with Timeliner Profile 13 |
2021-09-29 00:00:00 |
2021-272 |
04:39:00 |
NICER team suspects ISS structure blockage for a minute around this time. |
2021-09-28 00:00:00 |
2021-271 |
11:20:00 |
64S Relocate with USTO Maneuvers - HOSC turned off power to NICER preheaters during this activity |
2021-09-24 00:00:00 |
2021-267 |
06:13:00 |
OPM to nXVV with Timeliner Profile 6 |
2021-09-23 00:00:00 |
2021-266 |
04:49:28 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-09-22 00:00:00 |
2021-265 |
18:47:03 |
NICER STOW for ROBO/MISSE Ops -background data collection |
2021-09-22 00:00:00 |
2021-265 |
05:23:15 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-09-21 00:00:00 |
2021-264 |
18:43:00 |
NICER STOW for ROBO/MISSE Ops -background data collection |
2021-09-17 00:00:00 |
2021-260 |
19:30:00 |
Thruster Disable MT Translate WS7 to WS2 - ROBO arm may be in and out of NICER FOV until 261-00:00 |
2021-09-16 00:00:00 |
2021-259 |
23:12:00 |
NICER star tracker imaging stuck until ST reset commanded at 21-260-12:04:57 |
2021-09-13 00:00:00 |
2021-256 |
17:49:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-17:49 to 18:09 |
2021-09-13 00:00:00 |
2021-256 |
14:47:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-14:47 to 15:04 |
2021-09-11 00:00:00 |
2021-254 |
16:36:07 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-16:36 to 16:47 |
2021-09-11 00:00:00 |
2021-254 |
17:50:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-17:50 to 18:11 |
2021-09-09 00:00:00 |
2021-252 |
16:18:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-252-16:18 to 16:46 |
2021-08-30 00:00:00 |
2021-242 |
12:55:00 |
Dragon Docking (SpX-23 to N2F) |
2021-08-27 00:00:00 |
2021-239 |
04:32:00 |
NICER star tracker imaging stuck until ST reset commanded at 12:02:07 |
2021-08-23 00:00:00 |
2021-235 |
22:33:46 |
Updated EOP and Reset GEONS Clock Bias |
2021-08-11 00:00:00 |
2021-223 |
16:22:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-16:22:14 to 21-223-21:32. After this 16:22 attempt, NICER was misconfigured (GCE motors at their soft stops), so targetting was not happening until 21:32 when it was corrected. |
2021-08-11 00:00:00 |
2021-223 |
11:42:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-11:43:06 to 11:59:41 |
2021-08-10 00:00:00 |
2021-222 |
12:27:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-12:28:03 to 12:54:16 |
2021-08-10 00:00:00 |
2021-222 |
21:47:27 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-21:47:27 to 22:05:43 |
2021-08-09 00:00:00 |
2021-221 |
13:36:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-221-13:13:10 to 13:38:03. |
2021-08-08 00:00:00 |
2021-220 |
09:46:06 |
MPU 5 powered off after AP#127(No data received) tripped during passage through SAA. MPU 5 recovery complete at 220-10:40:39 |
2021-07-30 00:00:00 |
2021-211 |
03:00:00 |
OPM to pXVV with Timeliner Profile 13 |
2021-07-29 00:00:00 |
2021-210 |
17:28:00 |
ISS back to planned attitude |
2021-07-29 00:00:00 |
2021-210 |
16:49:01 |
"-XVV +ZLV TEA" |
2021-07-29 00:00:00 |
2021-210 |
16:34:00 |
LoAC Contingency Response - High ISS attitude rates due to anomlous MLM thurster firings |
2021-07-22 00:00:00 |
2021-203 |
15:27:51 |
Updated EOP and Reset GEONS Clock Bias |
2021-07-22 00:00:00 |
2021-203 |
15:21:11 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to nominal detector config. |
2021-07-22 00:00:00 |
2021-203 |
07:30:00 |
OPM to nXVV with Timeliner Profile 1 |
2021-07-21 00:00:00 |
2021-202 |
10:10:00 |
Crew-2 Port Relocate N2F to N2Z |
2021-07-19 00:00:00 |
2021-200 |
21:34:44 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,1-5,1-6,1-7,2-1,2-3,2-4,2-5,2-6,2-7,2-8,3-2,3-4,3-5,3-6,3-7,3-8,4-1,4-2,4-3,4-5,4-6,4-7,4-8,5-1,5-2,5-3,5-4,5-5,5-6,5-7,6-1,6-2,6-3,6-4,6-5,6-6,6-7,7-2,7-3,7-4,7-5,7-6,7-7,7-8. |
2021-07-18 00:00:00 |
2021-199 |
22:00:00 |
CMG Mnvr pXVV Yaw Bias |
2021-07-18 00:00:00 |
2021-199 |
16:41:00 |
OPM to pXVV with Timeliner Profile 7 |
2021-07-11 00:00:00 |
2021-192 |
09:00:00 |
CMG Mnvr nXVV Yaw Bias |
2021-07-11 00:00:00 |
2021-192 |
03:01:00 |
OPM to nXVV with Timeliner Profile 2 |
2021-07-09 00:00:00 |
2021-190 |
15:18:00 |
CMG Mnvr pXVV Yaw Bias |
2021-07-08 00:00:00 |
2021-189 |
14:30:00 |
NICER commanded to joint target mode to look away from planned Dragin departure. NICER back on science targeting at 14:56:00 |
2021-07-08 00:00:00 |
2021-189 |
14:00:00 |
Dragon Undocking (SpX-22 from PMA-3) |
2021-07-06 00:00:00 |
2021-187 |
14:09:30 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,2-1,2-3,2-5,2-6,3-2,3-5,3-6,3-7,4-1,4-2,4-3,4-6,5-1,5-2,5-3,5-7,6-1,6-2,6-3,6-4,7-2,7-3,7-6,7-7. |
2021-07-06 00:00:00 |
2021-187 |
14:57:00 |
NICER commanded to joint target mode to look away from planned Dragin departure. Departure delayed until DOY 189. NICER back on science targeting at 15:13:39 |
2021-07-02 00:00:00 |
2021-183 |
11:18:00 |
OPM to pXVV with Timeliner Profile 7 |
2021-07-01 00:00:00 |
2021-182 |
15:10:00 |
OPM to nXVV with Timeliner Profile 1 |
2021-06-25 00:00:00 |
2021-176 |
06:42:18 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6. |
2021-06-25 00:00:00 |
2021-176 |
04:01:58 |
NICER Safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-176-05:55:32 |
2021-06-24 00:00:00 |
2021-174 |
23:16:30 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to enabling all nominal detectors |
2021-06-22 00:00:00 |
2021-173 |
17:15:27 |
Updated EOP and Reset GEONS Clock Bias. |
2021-06-22 00:00:00 |
2021-173 |
14:51:24 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6. |
2021-06-16 00:00:00 |
2021-167 |
14:05:23 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,2-1,2-3,3-2,3-4,4-1,4-2,5-1,5-2,6-1,6-2,7-2,7-3. |
2021-06-14 00:00:00 |
2021-165 |
20:57:20 |
Science plan modified detector config for TARGETID=5220 to 1-3,2-4,3-5,4-2,5-2,6-3,7-3 enabled |
2021-06-14 00:00:00 |
2021-165 |
15:08:58 |
Science plan modified detector config for TARGETID=5220 to that in use with RTS08 |
2021-06-12 00:00:00 |
2021-163 |
22:55:32 |
Science plan modified detector config for TARGETID=5220 to 1-1,1-2,1-3,2-1,2-3,2-4,3-2,3-4,3-5,4-1,4-2,4-3,5-1,5-2,5-3,5-8,6-1,6-2,6-3,6-8,7-2,7-3,7-4,7-8 enabled |
2021-06-12 00:00:00 |
2021-163 |
04:15:00 |
Science plan modified detector config for TARGETID=5220 to that in use with RTS08 |
2021-06-11 00:00:00 |
2021-162 |
22:10:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-162-22:10- 21-163-02:10 |
2021-06-07 00:00:00 |
2021-158 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-158-14:30 - 21-153-21:30 |
2021-06-05 00:00:00 |
2021-156 |
07:24:00 |
Dragon Docking (SpX-22 to PMA-3) |
2021-05-27 00:00:00 |
2021-147 |
13:50:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-147-18:25 - 21-147-23:35 |
2021-05-24 00:00:00 |
2021-144 |
18:45:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-144-18:45 - 21-144-22:00 |
2021-05-23 00:00:00 |
2021-143 |
00:00:00 |
Possible NICER FOV Obstruction due to ROBO activity, times unknown. |
2021-05-19 00:00:00 |
2021-139 |
13:30:00 |
Updated EOP and Reset GEONS Clock Bias. |
2021-05-18 00:00:00 |
2021-138 |
00:20:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_138_A_03.UAF) |
2021-05-17 00:00:00 |
2021-137 |
14:10:00 |
NICER detector TECs commanded to max temp setpoints. Ops team had forgotten to do this after MISSE operations in April. TECs cooled to nominal setpoints from April 25th to today. |
2021-05-17 00:00:00 |
2021-137 |
00:21:00 |
NICER safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-137-13:51:15 |
2021-05-13 00:00:00 |
2021-133 |
21:30:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude |
2021-05-10 00:00:00 |
2021-130 |
23:50:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2021-05-07 00:00:00 |
2021-127 |
13:15:00 |
Reset star tracker after imaging got stuck a while ago |
2021-05-03 00:00:00 |
2021-123 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-123-14:30 - 21-123-21:30 |
2021-05-02 00:00:00 |
2021-122 |
00:00:00 |
Dragon Undocking (Crew-1 from PMA-3) - physical sep at 00:35 |
2021-04-29 00:00:00 |
2021-119 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-119-14:30 - 21-119-20:30 |
2021-04-28 00:00:00 |
2021-118 |
13:23:00 |
Reset star tracker after imaging got stuck a while ago |
2021-04-25 00:00:00 |
2021-115 |
09:03:38 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-24 00:00:00 |
2021-114 |
13:05:34 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-24 00:00:00 |
2021-114 |
07:35:00 |
Dragon Docking (Crew-2 to PMA-2) |
2021-04-24 00:00:00 |
2021-114 |
01:04:22 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-24 00:00:00 |
2021-114 |
21:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-114-21:30 - 21-115-00:30 |
2021-04-23 00:00:00 |
2021-113 |
13:14:11 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-23 00:00:00 |
2021-113 |
01:03:06 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-23 00:00:00 |
2021-113 |
21:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-113-21:30 - 21-114-14:30 |
2021-04-22 00:00:00 |
2021-112 |
13:04:05 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-22 00:00:00 |
2021-112 |
09:10:00 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-21 00:00:00 |
2021-111 |
13:21:58 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-20 00:00:00 |
2021-110 |
10:59:28 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-20 00:00:00 |
2021-110 |
05:15:22 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-20 00:00:00 |
2021-110 |
03:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-110-03:00 - 21-110-05:00 |
2021-04-09 00:00:00 |
2021-099 |
13:53:00 |
Updated EOP and reset GEONS Clock Bias |
2021-04-05 00:00:00 |
2021-095 |
09:55:00 |
Crew-1 Port Relocate N2F to N2Z |
2021-03-23 00:00:00 |
2021-082 |
18:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-082-18:00 - 21-083-00:00 |
2021-03-20 00:00:00 |
2021-079 |
03:46:00 |
RS OPM to pXVV |
2021-03-19 00:00:00 |
2021-078 |
02:52:00 |
RS OPM to nXVV |
2021-03-05 00:00:00 |
2021-064 |
18:18:00 |
HOSC removed power to J3AB which is NICER's survival heater power circuit to support EVA for ISS power upgrades |
2021-03-02 00:00:00 |
2021-061 |
18:18:00 |
Updated EOP and reset GEONS Clock Bias |
2021-02-19 00:00:00 |
2021-050 |
15:06:00 |
Commanded TOO of the Crab for alignment checks |
2021-02-16 00:00:00 |
2021-047 |
16:58:00 |
Commanded all MPU TEC temperature setpoints to max setpoint |
2021-02-12 00:00:00 |
2021-043 |
14:15:00 |
Commanded MPU4 detectors temp setpoints to nominal values |
2021-02-12 00:00:00 |
2021-043 |
11:45:00 |
Commanded MPU1 all detectors to nominal TEC temp setpoint |
2021-02-12 00:00:00 |
2021-043 |
09:06:00 |
Commanded MPU4 and MPU1 all detectors to max TEC temp setpoint |
2021-02-09 00:00:00 |
2021-040 |
09:30:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_040_B_03.UAF) |
2021-02-09 00:00:00 |
2021-040 |
07:30:00 |
HOSC ISS APS anomaly resulting in corrupt NICER data being sent to the SPOCC. Data outage lasts until the end of the DOY. Also, DOY 041 data was very ratty due to same anomaly. Data unrecoverable. |
2021-02-09 00:00:00 |
2021-040 |
04:20:00 |
76P departure maneauver to +ZVV 21-040-04:20:01 - 21-040-04:40:00, Undocking 21-040-05:18 - 21-040-05:22:10, maneuaver to +XVV 21-040-05:28:01 - 21-040-05:58:00 |
2021-02-02 00:00:00 |
2021-033 |
14:20:00 |
MPU 4-5 detector annealing completed |
2021-02-01 00:00:00 |
2021-032 |
16:08:00 |
Updated EOP and reset GEONS Clock Bias |
2021-01-31 00:00:00 |
2021-031 |
08:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-031-08:30 - 21-031-18:30 |
2021-01-29 00:00:00 |
2021-029 |
16:25:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-029-16:25 - 21-030-02:40 |
2021-01-28 00:00:00 |
2021-028 |
14:40:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-028-14:30 - 21-029-02:30 |
2021-01-26 00:00:00 |
2021-026 |
14:22:00 |
MPU 4-5 detector annealing started |
2021-01-12 00:00:00 |
2021-012 |
13:40:00 |
Dragon Undocking (SpX-21 to PMA-3) (M21_012_B_02.UAF) |
2021-01-11 00:00:00 |
2021-011 |
13:55:00 |
Aborted SpaceX-21 Undocking (M21_011_B_02.UAF) |
2021-01-10 00:00:00 |
2021-010 |
14:15:00 |
Dragon Thruster Test on RS control (SpX-21 to PMA-3) (M21_010_A_03.UAF) |
2021-01-08 00:00:00 |
2021-008 |
14:40:00 |
Possible NICER FOV Obstruction due to SpaceX-21 undock setup 21-008-14:30 - 21-008-23:05 |
2021-01-05 00:00:00 |
2021-005 |
18:54:00 |
Observed the crab for calibration purposes. Modified PC parameters table to adjust the star tracker to instrument boresight alignment matrix |
2020-12-28 00:00:00 |
2020-363 |
02:46:55 |
NICER MPU 4 anomalous power off while in SAA |
2020-12-23 00:00:00 |
2020-358 |
18:00:00 |
NICER activated and redeployed. Science resumed at 22:30:19 |
2020-12-19 00:00:00 |
2020-354 |
04:15:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2020-12-18 00:00:00 |
2020-352 |
00:36:47 |
NICER activation after ISS circuit 4B recovery, but immediately powered off when SPARTAN reported issues still with circuit 4B. |
2020-12-13 00:00:00 |
2020-348 |
17:25:00 |
NICER activated, stowed and deactivated via ISS power circuit 4A until circuit 4B anomaly can be figured out |
2020-12-12 00:00:00 |
2020-347 |
09:40:00 |
ISS 4B power circuit failure on the ISS which powered off NICER - Survival heater circuit still powered |
2020-12-11 00:00:00 |
2020-346 |
05:10:00 |
CMG Maneuver to High Beta Yaw Bias Attitude |
2020-12-10 00:00:00 |
2020-345 |
02:35:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2020-12-07 00:00:00 |
2020-342 |
17:43:00 |
Stopped science plan and pointed NICER starboard to avoid any contamination that could come from the docking Dragon thruster plumes. Science plan resumed at 18:45:12 |
2020-12-07 00:00:00 |
2020-342 |
16:55:00 |
Dragon Docking (SpX-21 to PMA-3) |
2020-12-07 00:00:00 |
2020-342 |
19:53:00 |
MPU 2-7 detector annealing started |
2020-12-07 00:00:00 |
2020-342 |
19:49:00 |
MPU 4-5 detector annealing completed |
2020-12-03 00:00:00 |
2020-338 |
17:01:00 |
Updated GPS GEONS EOP and reset |
2020-11-28 00:00:00 |
2020-333 |
02:54:45 |
NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed |
2020-11-27 00:00:00 |
2020-332 |
14:06:48 |
NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed |
2020-11-26 00:00:00 |
2020-331 |
07:12:01 |
NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed |
2020-11-25 00:00:00 |
2020-330 |
00:10:13 |
NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed |
2020-11-23 00:00:00 |
2020-328 |
16:39:00 |
MPU 2-8 detector annealing completed |
2020-11-23 00:00:00 |
2020-328 |
16:42:00 |
MPU 4-5 detector annealing started |
2020-11-21 00:00:00 |
2020-326 |
07:49:34 |
NICER processor reset based on exception in task tXbdServiceat. SEU in SAA. Science resumed at 326-10:28:06 |
2020-11-16 00:00:00 |
2020-321 |
14:24:00 |
MPU 2-8 detector annealing started |
2020-11-16 00:00:00 |
2020-321 |
14:24:00 |
MPU 1-1 detector annealing completed |
2020-11-16 00:00:00 |
2020-321 |
14:17:00 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-11-16 00:00:00 |
2020-321 |
02:25:00 |
Dragon Docking (Crew-1 to PMA-2) |
2020-11-10 00:00:00 |
2020-315 |
16:12:00 |
Updated GPS GEONS EOP and reset |
2020-11-09 00:00:00 |
2020-314 |
16:28:00 |
MPU 1-1 detector annealing started |
2020-11-09 00:00:00 |
2020-314 |
16:24:00 |
MPU 1-2 detector annealing completed |
2020-11-07 00:00:00 |
2020-312 |
03:52:02 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-11-02 00:00:00 |
2020-307 |
13:47:00 |
MPU 1-3 detector annealing completed |
2020-11-02 00:00:00 |
2020-307 |
13:49:00 |
MPU 1-2 detector annealing started |
2020-10-30 00:00:00 |
2020-304 |
12:49:00 |
NICER Safe Mode due to GCE Overcurrent trip, near SAA |
2020-10-26 00:00:00 |
2020-300 |
14:29:00 |
MPU 1-3 detector annealing started |
2020-10-26 00:00:00 |
2020-300 |
14:27:00 |
MPU 1-4 detector annealing completed |
2020-10-19 00:00:00 |
2020-293 |
16:55:00 |
MPU 1-4 detector annealing started |
2020-10-19 00:00:00 |
2020-293 |
16:47:00 |
MPU 1-5 detector annealing completed |
2020-10-15 00:00:00 |
2020-289 |
02:35:00 |
NICER Safe Mode due to GCE Overcurrent trip, near SAA |
2020-10-12 00:00:00 |
2020-286 |
15:45:00 |
MPU 1-6 detector annealing completed |
2020-10-12 00:00:00 |
2020-286 |
15:46:00 |
MPU 1-5 detector annealing started |
2020-10-07 00:00:00 |
2020-281 |
11:02:00 |
OPM to pXVV with Timeliner Profile 7 |
2020-10-06 00:00:00 |
2020-280 |
21:05:00 |
OPM to nXVV with Timeliner Profile 2 |
2020-10-05 00:00:00 |
2020-279 |
16:12:00 |
MPU 1-6 detector annealing started |
2020-10-05 00:00:00 |
2020-279 |
16:08:00 |
MPU 1-7 detector annealing completed |
2020-10-02 00:00:00 |
2020-275 |
14:31:00 |
Updated GPS GEONS EOP and reset |
2020-09-28 00:00:00 |
2020-272 |
13:49:00 |
MPU 1-8 detector annealing completed |
2020-09-28 00:00:00 |
2020-272 |
13:58:00 |
MPU 1-7 detector annealing started |
2020-09-22 00:00:00 |
2020-266 |
21:19:00 |
PDAM Aft Progress Prog Roll |
2020-09-21 00:00:00 |
2020-265 |
16:12:00 |
MPU 1-8 detector annealing started |
2020-09-21 00:00:00 |
2020-265 |
16:03:00 |
MPU 5-5 detector annealing completed |
2020-09-18 00:00:00 |
2020-262 |
13:15:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-262-13:15 - 20-262-20:40 |
2020-09-14 00:00:00 |
2020-258 |
16:38:00 |
MPU 5-5 detector annealing started |
2020-09-14 00:00:00 |
2020-258 |
16:28:00 |
MPU 5-6 detector annealing completed |
2020-09-11 00:00:00 |
2020-255 |
14:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-255-14:00 - 20-255-23:50 |
2020-09-04 00:00:00 |
2020-248 |
20:26:00 |
MPU 5-6 detector annealing started |
2020-09-03 00:00:00 |
2020-247 |
21:49:00 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-09-03 00:00:00 |
2020-247 |
21:36:00 |
NICER Deploy post-SPDM MISSE Ops Day 3 - Science Resumed |
2020-09-02 00:00:00 |
2020-247 |
12:17:00 |
NICER Stow for SPDM MISSE Ops Day 3 - Detectors being annealed |
2020-09-02 00:00:00 |
2020-246 |
23:53:00 |
NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed |
2020-09-02 00:00:00 |
2020-246 |
12:29:00 |
NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed |
2020-09-01 00:00:00 |
2020-245 |
22:43:00 |
NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed |
2020-09-01 00:00:00 |
2020-245 |
22:28:00 |
Updated GPS GEONS EOP and reset |
2020-09-01 00:00:00 |
2020-245 |
12:23:00 |
NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed |
2020-08-28 00:00:00 |
2020-241 |
15:31:00 |
MPU 5-7 detector annealing started |
2020-08-28 00:00:00 |
2020-241 |
15:15:00 |
MPU 5-8 detector annealing completed |
2020-08-21 00:00:00 |
2020-234 |
14:40:00 |
MPU 5-8 detector annealing started |
2020-08-21 00:00:00 |
2020-234 |
14:30:00 |
MPU 5-1 detector annealing completed |
2020-08-14 00:00:00 |
2020-227 |
14:57:00 |
MPU 5-4 detector annealing completed |
2020-08-14 00:00:00 |
2020-227 |
15:02:00 |
MPU 5-1 detector annealing started |
2020-08-07 00:00:00 |
2020-220 |
13:25:00 |
MPU 5-4 detector annealing started |
2020-08-07 00:00:00 |
2020-220 |
12:34:00 |
MPU 5-2 detector annealing completed |
2020-08-06 00:00:00 |
2020-219 |
13:21:00 |
Modified RTS 241 to include disabling detectors 4-5 and 5-4 at low sun angles |
2020-08-04 00:00:00 |
2020-217 |
14:23:00 |
Modified RTS 243 to disable detector 5-4 at low sun angles |
2020-08-01 00:00:00 |
2020-214 |
23:00:00 |
Dragon Undocking |
2020-07-31 00:00:00 |
2020-213 |
19:14:00 |
MPU 5-3 detector annealing complete |
2020-07-31 00:00:00 |
2020-213 |
20:19:00 |
MPU 5-2 detector annealing started |
2020-07-27 00:00:00 |
2020-209 |
16:30:00 |
MPU 5-3 detector annealing started |
2020-07-27 00:00:00 |
2020-209 |
12:57:00 |
MPU 5-4 detector annealing completed |
2020-07-24 00:00:00 |
2020-206 |
05:36:00 |
OPM to +XVV with Timeliner Profile 9 |
2020-07-23 00:00:00 |
2020-205 |
20:29:00 |
MPU 5-4 detector annealing started |
2020-07-23 00:00:00 |
2020-205 |
17:22:00 |
MPU 5-4 detector annealing completed |
2020-07-23 00:00:00 |
2020-205 |
06:22:00 |
OPM to -XVV with Timeliner Profile 5 |
2020-07-22 00:00:00 |
2020-204 |
17:21:00 |
MPU 5-4 detector annealing started |
2020-07-22 00:00:00 |
2020-204 |
14:10:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-204-14:10 - 20-204-17:10 |
2020-07-20 00:00:00 |
2020-202 |
14:37:00 |
MPU 5-4 detector was misbehaving at low SUn anlges. Turned it off a few times. Updated RTS 243 to disable MPU 5-4 at low sun angles |
2020-07-13 00:00:00 |
2020-195 |
04:10:00 |
CMG Manuever to high-Beta Yaw Bias Attitude |
2020-07-12 00:00:00 |
2020-194 |
04:21:00 |
CMG Manuever to mid-Beta Yaw Bias Attitude |
2020-07-12 00:00:00 |
2020-194 |
02:01:00 |
OPM to +XVV with Timeliner Profile 10 |
2020-07-11 00:00:00 |
2020-193 |
08:58:00 |
OPM to -XVV with Timeliner Profile 5 |
2020-07-10 00:00:00 |
2020-192 |
19:00:00 |
CMG Manuever to mid-Beta Yaw Bias Attitude |
2020-07-10 00:00:00 |
2020-192 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-192-14:30 - 20-192-18:00 |
2020-07-06 00:00:00 |
2020-188 |
14:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-188-14:00 - 20-188-17:00 |
2020-07-03 00:00:00 |
2020-185 |
14:35:00 |
PDAM - 75P Aft Progress- Prog Roll |
2020-06-24 00:00:00 |
2020-176 |
15:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-176-15:00 - 20-176-19:30 |
2020-06-08 00:00:00 |
2020-160 |
18:52:00 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-05-31 00:00:00 |
2020-152 |
14:29:56 |
Dragon Docking to PMA2 |
2020-05-18 00:00:00 |
2020-139 |
20:55:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-14 00:00:00 |
2020-135 |
19:14:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-11 00:00:00 |
2020-132 |
21:20:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-06 00:00:00 |
2020-127 |
21:03:32 |
NICER Safe mode due to invalid GPS signals (Science downtime from 20-127-21:03:32 - 21:27:37. |
2020-05-05 00:00:00 |
2020-126 |
22:03:00 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-04-25 00:00:00 |
2020-116 |
16:10:00 |
OPM to +XVV with Timeliner Profile 7 |
2020-04-24 00:00:00 |
2020-115 |
20:00:39 |
OPM to -XVV with Timeliner Profile 2 |
2020-04-19 00:00:00 |
2020-110 |
08:18:00 |
OPM to +XVV with Timeliner Profile 7 |
2020-04-19 00:00:00 |
2020-110 |
04:55:00 |
NICER Safe mode due to invalid GPS signals (Science downtime from 20-110-04:55 - 05:24. |
2020-04-18 00:00:00 |
2020-109 |
18:20:00 |
OPM to -XVV with Timeliner Profile 2 |
2020-04-10 00:00:00 |
2020-101 |
01:00:00 |
US OPM to +XVV with Profile 7 |
2020-04-09 00:00:00 |
2020-100 |
03:18:00 |
US OPM to -XVV with Profile 1 |
2020-04-07 00:00:00 |
2020-098 |
11:23:00 |
SpaceX-20 Release (Release at 13:05:00) |
2020-04-07 00:00:00 |
2020-098 |
09:35:00 |
SpaceX-20 Unberth |
2020-03-25 00:00:00 |
2020-085 |
12:45:28 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-03-20 00:00:00 |
2020-080 |
06:42:36 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #4 |
2020-03-20 00:00:00 |
2020-080 |
06:02:12 |
Background Data Collection ended for re-deploy |
2020-03-19 00:00:00 |
2020-079 |
05:36:28 |
Background Data Collection ended for re-deploy |
2020-03-19 00:00:00 |
2020-079 |
19:34:36 |
Background Data Collection started |
2020-03-19 00:00:00 |
2020-079 |
19:02:25 |
NICER stowed for Day #4 of MISSE ROBO Ops |
2020-03-19 00:00:00 |
2020-079 |
06:14:37 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #3 |
2020-03-18 00:00:00 |
2020-078 |
13:07:35 |
Stowed NICER for MISSE ROBO Ops Day #3 |
2020-03-18 00:00:00 |
2020-078 |
06:36:13 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #2 |
2020-03-18 00:00:00 |
2020-078 |
05:54:50 |
Background Data Collection ended for re-deploy |
2020-03-18 00:00:00 |
2020-078 |
13:36:23 |
Background Data Collection started |
2020-03-17 00:00:00 |
2020-077 |
12:37:40 |
NICER stowed for Day #2 of MISSE ROBO Ops |
2020-03-17 00:00:00 |
2020-077 |
06:51:47 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #1 |
2020-03-17 00:00:00 |
2020-077 |
13:20:57 |
Background Data Collection started |
2020-03-17 00:00:00 |
2020-077 |
06:12:04 |
Background Data Collection ended for re-deploy |
2020-03-16 00:00:00 |
2020-076 |
12:35:01 |
Stowed NICER for MISSE ROBO Ops |
2020-03-16 00:00:00 |
2020-076 |
13:13:03 |
Background Data Collection started |
2020-03-09 00:00:00 |
2020-069 |
11:00:00 |
SpaceX-20 Capture and Install |
2020-03-06 00:00:00 |
2020-066 |
06:50:57 |
NICER safe mode due to invalid GPS signals. Science was resumed at 2020-066-07:28:40. |
2020-03-04 00:00:00 |
2020-064 |
06:46:16 |
NICER safe mode due to invalid GPS signals. Science was resumed at 2020-064-12:56:54. |
2020-02-18 00:00:00 |
2020-049 |
17:00:00 |
Noticed on ISS camera feed that there is some peeling of the silver teflon on the Star tracker baffle. Looking through archival off ISS photos it looks like this began sometime between Feb and May 2019. |
2020-02-13 00:00:00 |
2020-044 |
14:31:55 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-02-03 00:00:00 |
2020-034 |
16:25:00 |
NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings. 16:25:25 - 16:57:35 and 17:59:17 - 18:16:11 and 19:30:21 - 19:50:25 and 21:06:01 - 21:23:20 |
2020-01-31 00:00:00 |
2020-031 |
18:48:06 |
NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings. 18:48:06 - 19:05:13 and 20:19:16 - 20:34:49. |
2020-01-26 00:00:00 |
2020-026 |
05:18:51 |
MPU 4 powered off due to Limit Check Action Point 126 trip (IM reported data from MPU4 not received for 8 seconds) |
2020-01-25 00:00:00 |
2020-025 |
19:23:19 |
NICER Re-deploy after AMS EVA #4. Background collection stopped at 18:48:45 |
2020-01-25 00:00:00 |
2020-025 |
10:05:32 |
NICER Stow for AMS EVA #4 - background data collection begins at 10:44:18 |
2020-01-15 00:00:00 |
2020-015 |
16:38:00 |
Pointed NICER in the direction of the astronaut EVA until 16:55. |
2020-01-14 00:00:00 |
2020-014 |
14:45:00 |
NICER in Safemode after manual reset of the star tracker. The ST attitude was invalid due to an incorrect AGS7 load earlier at 14:31 which didn't account for ISS structure obstruction so some observations (namely PSR_J0437-4715_opt1) were obstructed until the load was replaced at 21:40. NICER left safe mode at 15:30. |
2020-01-13 00:00:00 |
2020-013 |
19:38:14 |
Attempted to track NGC_4151 rising through Earth's limb. Science plan resumed at 19:51:56. |
2020-01-10 00:00:00 |
2020-010 |
18:39:00 |
Interrupted science timeline to view NGC 4151 as it rose behind the Earth. Also, attempted to track Crab Pulsar as it set, but it was slightly out of Azimuth range. Science plan resumed at 19:25:01. |
2020-01-07 00:00:00 |
2020-007 |
04:35:00 |
SpaceX-19 Unberth |
2020-01-07 00:00:00 |
2020-007 |
06:36:00 |
SpaceX-19 Release |
2020-01-06 00:00:00 |
2020-006 |
20:14:00 |
Reset the star tracker to clear up issue with storing images |
2020-01-03 00:00:00 |
2020-003 |
18:13:24 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-12-31 00:00:00 |
2019-365 |
10:28:00 |
RS OPM DTO to +XVV |
2019-12-30 00:00:00 |
2019-364 |
08:25:00 |
RS OPM DTO to -XVV |
2019-12-23 00:00:00 |
2019-357 |
17:24:55 |
Interrupted science timeline to view Herc_X1 as it rose behind the Earth, but ISS arrays were obstructing the view. Science plan resumed at 17:39:35 |
2019-12-17 00:00:00 |
2019-351 |
23:35:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-17 00:00:00 |
2019-351 |
05:15:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-13 00:00:00 |
2019-347 |
08:16:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-08 00:00:00 |
2019-342 |
10:30:00 |
SpaceX-19 Capture |
2019-12-02 00:00:00 |
2019-336 |
19:01:27 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #3. Background data collection halted. |
2019-12-02 00:00:00 |
2019-336 |
10:10:56 |
Stowed NICER for AMS EVA #3. Background data collection begins. |
2019-11-26 00:00:00 |
2019-330 |
14:11:59 |
Earth Limb Crab Observations attempted throughout the day |
2019-11-22 00:00:00 |
2019-326 |
18:38:31 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #2. Background data collection halted. |
2019-11-22 00:00:00 |
2019-326 |
10:26:45 |
Stowed NICER for AMS EVA #2. Background data collection begins. |
2019-11-20 00:00:00 |
2019-324 |
18:38:22 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-11-18 00:00:00 |
2019-322 |
16:48:01 |
Switched to GEONS for GPS. It had been using SPS since after the EVA. |
2019-11-15 00:00:00 |
2019-319 |
19:24:21 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #1. Background data collection halted. |
2019-11-15 00:00:00 |
2019-319 |
10:41:02 |
Stowed NICER for AMS EVA #1. Background data collection begins. |
2019-11-12 00:00:00 |
2019-316 |
02:30:01 |
NICER Limit checker action point 48 (DI:ST|GPS reports data invalid) failed putting NICER is safe mode (AZ=0, EL=-90). Further analysis showed GPS SPS was invalid for more than 5 minutes. +Z antenna had 4 GPS signals but -Z antenna had none. This was most likely due to blockage due to ROBO Dextre arm being parked close to NICER after MISSE MSC extract/install operations. |
2019-11-12 00:00:00 |
2019-316 |
00:23:18 |
Redeploy and science plan resumed after ROBO Ops Day 4 for MISSE conclude for the day. Background data collection halted. |
2019-11-11 00:00:00 |
2019-315 |
12:09:38 |
Stow for MISSE MSC Transfer Operations by ROBO Day 4 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-10 00:00:00 |
2019-314 |
22:15:01 |
Redeploy and science plan resumed after ROBO Ops Day 3 for MISSE conclude for the day. Background data collection halted. |
2019-11-10 00:00:00 |
2019-314 |
12:17:48 |
Stow for MISSE MSC Transfer Operations by ROBO Day 3 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-10 00:00:00 |
2019-314 |
06:40:24 |
Redeploy and science plan resumed after ROBO Ops Day 2 for MISSE conclude for the day. Background data collection halted. |
2019-11-09 00:00:00 |
2019-313 |
12:17:01 |
Stow for MISSE MSC Transfer Operations by ROBO Day 2 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-09 00:00:00 |
2019-313 |
07:58:14 |
Redeploy and science plan resumed after ROBO Ops for MISSE conclude for the day. Background data collection halted. |
2019-11-08 00:00:00 |
2019-312 |
12:47:59 |
Stow for MISSE MSC Transfer Operations by ROBO - Note: ROBO was in their MSC Transfer Park Position since 311/22:40 which obscured many NICER observations. Background data collection begins. |
2019-10-19 00:00:00 |
2019-292 |
17:13:00 |
Reactivation and Redeploy. Back on Science Plan |
2019-10-18 00:00:00 |
2019-291 |
NaN |
Battery Charge/Discharge Unit EVA |
2019-10-13 00:00:00 |
2019-286 |
11:19:00 |
Stopped Science Plan for Stow and Deactivation for RPCM R&R and Battery EVA - Survival heaters were still powered. |
2019-10-13 00:00:00 |
2019-286 |
03:15:00 |
Turned on NICER Pre-heaters in prep for extended power off |
2019-10-09 00:00:00 |
2019-282 |
12:26:00 |
Returned to Target Pointing |
2019-10-09 00:00:00 |
2019-282 |
11:45:00 |
Went to Joint Angle Mode to point away from Freon Venting |
2019-09-26 00:00:00 |
2019-269 |
08:06:00 |
OPM to +XVV with Profile 7 |
2019-09-25 00:00:00 |
2019-268 |
08:53:00 |
OPM to -XVV with Profile 2 |
2019-09-24 00:00:00 |
2019-267 |
00:51:00 |
ISS POR took out power to ELC-2 and ELC-4 and MISSE. NICER was completely powered off - Science downtime from 2019-267-00:51:45 - 2019-267-04:38:51 |
2019-09-20 00:00:00 |
2019-263 |
10:54:00 |
NICER MEB Processor Reset (during SAA passage) Induced Safe Mode - Science downtime 2019-263-10:54:55 to 2019-263-15:06:10 |
2019-09-09 00:00:00 |
2019-252 |
17:36:00 |
Reset the Star Tracker because imaging was stuck |
2019-08-29 00:00:00 |
2019-241 |
04:07:55 |
NICER background data collection ended and NICER re-deployed after ROBO MBSU IFM Ops. Since Plan resumed at 241-05:00:47 |
2019-08-28 00:00:00 |
2019-240 |
09:08:25 |
NICER science plan stopped, background data collection started and NICER STOW operations performed for ROBO Ops for MBSU IFM. |
2019-08-27 00:00:00 |
2019-239 |
14:42:00 |
Dragon-18 Release |
2019-08-27 00:00:00 |
2019-239 |
11:25:00 |
Dragon-18 Unberth |
2019-08-23 00:00:00 |
2019-235 |
05:01:00 |
OPM to -XVV with Profile 1 - Soyuz 60S docking at 2019-236-05:30 was aborted due to (presumed) issue with the KURS docking system amplifier onboard ISS in the RS segment.\n\nSoyuz placed at a safe trajectory from the ISS until further attempt is made to dock again. ISS currently flying in -XVV TEA orientation and no additional maneuvering is expected until re planning has happened.\n\nNICER plan was updated since the ISS maneuver after the docking was not performed to account for the non-change in attitude of the ISS. Also, AP 66 and 67 (solar exclusion) were disabled until maneuvering is completed in coming days. |
2019-08-15 00:00:00 |
2019-227 |
16:34:01 |
NICER performed several Crab Pulsar observations during Night to Day transitions |
2019-08-15 00:00:00 |
2019-227 |
15:25:48 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-08-01 00:00:00 |
2019-213 |
03:25:01 |
OPM to +XVV with Profile 6 |
2019-07-31 00:00:00 |
2019-212 |
05:46:01 |
OPM to -XVV with Profile 2 |
2019-07-27 00:00:00 |
2019-208 |
15:21:00 |
SpaceX-18 Install Thruster Disable |
2019-07-27 00:00:00 |
2019-208 |
14:00:00 |
Dragon-18 Capture |
2019-07-23 00:00:00 |
2019-204 |
21:11:27 |
Power cycled MPU-2 to clear an timestamping issue seen in science data |
2019-07-22 00:00:00 |
2019-203 |
00:27:01 |
OPM to +XVV |
2019-07-22 00:00:00 |
2019-203 |
04:00:00 |
CMG Maneuver to +XVV Yaw Bias Attitude |
2019-07-22 00:00:00 |
2019-203 |
01:12:17 |
NICER enters Pointing Control Safe Mode (AZ=0, EL=90). Due to ISS manuever from -XVV to +XVV, GPS SPS went invalid for greater than 5 minutes, triggering AP 48 calling RTS 30 to safe NICER. |
2019-07-14 00:00:00 |
2019-195 |
01:45:00 |
OPM to -XVV with Profile 1 |
2019-07-14 00:00:00 |
2019-195 |
06:20:00 |
CMG Maneuver to -XVV Yaw Bias Attitude |
2019-07-13 00:00:00 |
2019-194 |
19:30:00 |
CMG Maneuver to +XVV TEA |
2019-07-12 00:00:00 |
2019-193 |
18:10:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-07-08 00:00:00 |
2019-189 |
14:18:00 |
MPU-2 time-stamping corrupt due to stuck bit. |
2019-06-19 00:00:00 |
2019-170 |
05:58:24 |
Background Data Collection Ends and NICER Re-deploy started |
2019-06-18 00:00:00 |
2019-169 |
12:36:23 |
Background Science Data Collection Begins |
2019-06-18 00:00:00 |
2019-169 |
11:47:49 |
NICER Science Plan stopped and Stow begins for ROBO Ops and MISSE troubleshooting. About 20% of targets were obscured prior to stopping the plan due to ROBO parked in our way over night 168-169. |
2019-06-13 00:00:00 |
2019-164 |
18:44:00 |
NICER science data collection begins |
2019-06-13 00:00:00 |
2019-164 |
17:53:57 |
NICER background data collection stopped and Unstow Begun |
2019-06-13 00:00:00 |
2019-164 |
11:52:10 |
NICER STOW Complete and Background Data Collection begun |
2019-06-13 00:00:00 |
2019-164 |
11:00:05 |
NICER STOW for ROBO Ops Started |
2019-06-03 00:00:00 |
2019-154 |
16:00:00 |
SpX-17 Release |
2019-05-24 00:00:00 |
2019-144 |
06:20:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-23 00:00:00 |
2019-143 |
18:50:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-23 00:00:00 |
2019-143 |
11:45:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-21 00:00:00 |
2019-141 |
15:30:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-20 00:00:00 |
2019-140 |
21:00:00 |
ISS Beta Gimbal Assembly on Solar Array 2B on the Port SARJ is stuck and will likely be parked overnight |
2019-05-17 00:00:00 |
2019-137 |
05:30:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-16 00:00:00 |
2019-136 |
17:55:21 |
NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 18:03:28. |
2019-05-16 00:00:00 |
2019-136 |
03:40:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-14 00:00:00 |
2019-134 |
16:28:35 |
NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 16:37:40. |
2019-05-06 00:00:00 |
2019-126 |
11:00:00 |
SpaceX-17 Capture |
2019-05-02 00:00:00 |
2019-122 |
12:59:53 |
NICER survival heater service is powered back on by HOSC |
2019-04-29 00:00:00 |
2019-119 |
22:13:00 |
NICER pre-heaters turned off |
2019-04-29 00:00:00 |
2019-119 |
20:51:00 |
NICER pre-heaters turned on |
2019-04-29 00:00:00 |
2019-119 |
17:35:00 |
NICER pre-heaters turned off |
2019-04-29 00:00:00 |
2019-119 |
15:13:00 |
NICER pre-heaters turned on |
2019-04-29 00:00:00 |
2019-119 |
12:00:00 |
ISS testing caused NICER survival heater service power off |
2019-04-26 00:00:00 |
2019-116 |
23:59:26 |
NICER science targetting resumed |
2019-04-26 00:00:00 |
2019-116 |
20:00:11 |
NICER powered on |
2019-04-24 00:00:00 |
2019-114 |
14:52:00 |
NICER powered off |
2019-04-24 00:00:00 |
2019-114 |
13:26:44 |
NICER Science targetting stopped for stowage for ROBO MISSE Ops. |
2019-04-11 00:00:00 |
2019-101 |
12:42:46 |
RRM3 at ELC-1 had a burst disk rupture venting gas and ice. Solar arrays were locked in a position to minimize impact. Venting induced an ISS roll of 1.3 degrees which was corrected at 12:44. Ice buildup on the exterior of the payload continued to break away at 14:03. |
2019-04-08 00:00:00 |
2019-098 |
20:30:00 |
NICER Science targetting resumed |
2019-04-08 00:00:00 |
2019-098 |
17:55:00 |
NICER MEB Powered on |
2019-04-08 00:00:00 |
2019-098 |
09:47:00 |
NICER Science targetting stopped for stowage |
2019-04-08 00:00:00 |
2019-098 |
11:10:00 |
NICER Stowed and powered off |
2019-04-05 00:00:00 |
2019-095 |
02:15:00 |
RS OPM to +XVV (Yaw back to +356) |
2019-04-05 00:00:00 |
2019-095 |
17:23:00 |
SPDM NiH R&R Operations |
2019-04-04 00:00:00 |
2019-094 |
04:41:00 |
OPM (Pitch to +359.7) |
2019-04-04 00:00:00 |
2019-094 |
03:04:00 |
OPM to -XVV (Yaw to +177, Pitch to +0.1) |
2019-03-15 00:00:00 |
2019-074 |
11:22:01 |
OPM to +XVV (back to +356 Yaw) |
2019-03-15 00:00:00 |
2019-074 |
01:10:00 |
ISS Maneuver to Post Docking (Pitch +359) |
2019-03-14 00:00:00 |
2019-073 |
16:53:01 |
ISS Maneuver to TEA +.4 Pitch) |
2019-03-14 00:00:00 |
2019-073 |
15:51:01 |
OPM to -XVV (Yaw +356to +177 for Soyuz Docking) |
2019-03-08 00:00:00 |
2019-067 |
07:31:04 |
SpaceX Demo-1 Dragon Undocking |
2019-03-03 00:00:00 |
2019-062 |
11:00:00 |
SpaceX Demo-1 Dragon docking to PMA2 |
2019-02-22 00:00:00 |
2019-053 |
10:50:00 |
NICER back on Science plan. |
2019-02-22 00:00:00 |
2019-053 |
06:57:00 |
NICER powered back on after MISSE Ops complete |
2019-02-21 00:00:00 |
2019-052 |
16:28:00 |
NICER stowed and powered off for ROBO ops |
2019-02-21 00:00:00 |
2019-052 |
15:09:33 |
NICER Targeting stopped for ROBO Ops to troubleshoot MISSE |
2019-02-15 00:00:00 |
2019-046 |
15:25:00 |
Reset GEONS as part of clock bias reset (NICER was using SPS during 15:27 to 15:32) |
2019-02-06 00:00:00 |
2019-037 |
18:25:00 |
FSW Flash Images 5, 6 and 7 TMR checks |
2019-02-06 00:00:00 |
2019-037 |
19:04:32 |
Updated GEONS EOP per Day 036. |
2019-02-04 00:00:00 |
2019-035 |
14:15:01 |
Reset the Star Tracker because imaging was stuck |
2019-01-28 00:00:00 |
2019-028 |
?? |
PRO performed a cold reset of the ELC coldfire processor for mISSE troubleshooting which resulted in a brief interruption of 1553 traffic for NICER |
2019-01-13 00:00:00 |
2019-013 |
23:30:00 |
SpaceX 16 Release |
2019-01-13 00:00:00 |
2019-013 |
18:50:00 |
SpaceX 16 Unberth |
2019-01-04 00:00:00 |
2019-004 |
09:59:00 |
NICER back on Science plan. |
2019-01-04 00:00:00 |
2019-004 |
06:38:00 |
NICER Powered back on after ROBO Ops complete |
2019-01-03 00:00:00 |
2019-003 |
01:56:00 |
NICER Powered off for ROBO Ops. |
2019-01-03 00:00:00 |
2019-003 |
00:56:00 |
NICER background data collection stopped. |
2019-01-02 00:00:00 |
2019-002 |
23:45:00 |
NICER stowed and collecting background data |
2019-01-02 00:00:00 |
2019-002 |
22:30:00 |
NICER Targeting stopped for ROBO Ops to install MSCs to MISSE. |
2018-12-21 00:00:00 |
2018-355 |
20:39:00 |
XNAV App configuration update |
2018-12-19 00:00:00 |
2018-353 |
20:20:00 |
ISS Maneuver to TEA |
2018-12-19 00:00:00 |
2018-353 |
22:01:00 |
XNAV App configuration update and restart |
2018-12-18 00:00:00 |
2018-352 |
15:56:00 |
GEONS EOP Updated |
2018-12-18 00:00:00 |
2018-352 |
10:30:00 |
ISS Manuever to Yaw Bias Attitude |
2018-12-17 00:00:00 |
2018-351 |
16:16:00 |
XNAV App configuration update and restart |
2018-12-13 00:00:00 |
2018-347 |
16:59:00 |
XNAV App configuration update |
2018-12-11 00:00:00 |
2018-345 |
18:15:00 |
Russian EVA 45A on Soyuz Module (they hacked the thing to pieces, debris everywhere!) Messed up our tracking. NICER off targetting plan from 345-18:57 - 23:58. |
2018-12-08 00:00:00 |
2018-342 |
08:25:00 |
ISS Manuever to Dragon Capture Attitude |
2018-12-08 00:00:00 |
2018-342 |
12:21:00 |
SpaceX-16 Dragon Capture |
2018-12-07 00:00:00 |
2018-341 |
21:25:00 |
XNAV App configuration update and restart |
2018-12-04 00:00:00 |
2018-338 |
04:07:00 |
ISS Manuever to +XVV using OPM |
2018-12-04 00:00:00 |
2018-338 |
02:45:00 |
ISS Maneuver to -XVV OPM Starting Attitude |
2018-12-04 00:00:00 |
2018-338 |
18:19:00 |
XNAV App configuration update and restart |
2018-12-03 00:00:00 |
2018-337 |
17:42:00 |
ISS Maneuver to Post-Docking LVLH TEA |
2018-12-03 00:00:00 |
2018-337 |
06:30:00 |
ISS Maneuver to -XVV using OPM for Soyuz docking |
2018-12-03 00:00:00 |
2018-337 |
15:40:00 |
ISS Maneuver to 57S Docking Attitude |
2018-12-03 00:00:00 |
2018-337 |
19:01:00 |
XNAV App configuration update and restart |
2018-11-29 00:00:00 |
2018-333 |
21:42:00 |
XNAV App configuration update and restart |
2018-11-26 00:00:00 |
2018-330 |
17:12:00 |
XNAV App configuration update and restart |
2018-11-19 00:00:00 |
2018-323 |
14:49:00 |
NICER payload rebooted by HOSC in error (Science outage of 3 hours and 26 minutes) recovery complete at 323-18:11:58 |
2018-11-19 00:00:00 |
2018-323 |
10:57:00 |
ISS Manuever to Cygnus Berthed TEA |
2018-11-19 00:00:00 |
2018-323 |
08:20:00 |
ISS Maneuver to Cygnus Capture Attitude |
2018-11-15 00:00:00 |
2018-319 |
21:35:00 |
XNAV App configuration update and restart in Calibration Mode |
2018-11-13 00:00:00 |
2018-317 |
17:54:00 |
XNAV App restart |
2018-11-09 00:00:00 |
2018-313 |
22:01:00 |
XNAV App configuration update and restart |
2018-11-07 00:00:00 |
2018-311 |
14:20:00 |
XNAV App restart |
2018-11-05 00:00:00 |
2018-309 |
15:29:00 |
XNAV App configuration update and restart |
2018-11-03 00:00:00 |
2018-307 |
12:24:00 |
MEB Processor Reset Induced Safe Mode Downtime 12:24:55 to 17:22:02z |
2018-11-01 00:00:00 |
2018-305 |
20:07:00 |
XNAV App configuration update |
2018-10-26 00:00:00 |
2018-299 |
14:53:00 |
XNAV App configuration update |
2018-10-22 00:00:00 |
2018-295 |
16:48:00 |
XNAV App restart |
2018-10-22 00:00:00 |
2018-295 |
16:01:00 |
Suspended nominal science targeting and maneuvered NICER for high-def photo opportunities with CRONUS NICER also took pictures of ELC-3 area using star tracker. |
2018-10-22 00:00:00 |
2018-295 |
15:49:00 |
XNAV App configuration update |
2018-10-22 00:00:00 |
2018-295 |
17:59:00 |
XNAV App restart |
2018-10-22 00:00:00 |
2018-295 |
17:35:00 |
Resumed nominal science targeting and photo shoot concludes |
2018-10-18 00:00:00 |
2018-291 |
18:10:00 |
Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters |
2018-10-18 00:00:00 |
2018-291 |
18:01:00 |
XNAV App restart |
2018-10-16 00:00:00 |
2018-289 |
19:53:00 |
XNAV App configuration update and restart |
2018-10-15 00:00:00 |
2018-288 |
17:16:00 |
XNAV App configuration update and restart |
2018-10-12 00:00:00 |
2018-285 |
23:02:00 |
ISS maneuvers to +XVV using OPM |
2018-10-12 00:00:00 |
2018-285 |
14:38:00 |
XNAV App configuration update |
2018-10-11 00:00:00 |
2018-284 |
02:13:00 |
ISS maneuvers to -XVV |
2018-10-05 00:00:00 |
2018-278 |
19:25:00 |
XNAV App configuration update |
2018-10-02 00:00:00 |
2018-275 |
17:22:00 |
XNAV App configuration update and restart |
2018-10-01 00:00:00 |
2018-274 |
15:58:00 |
XNAV App restart |
2018-09-25 00:00:00 |
2018-268 |
17:49:00 |
XNAV App restart |
2018-09-24 00:00:00 |
2018-267 |
14:52:00 |
XNAV App configuration update and restart |
2018-09-15 00:00:00 |
2018-260 |
19:21:00 |
XNAV App restart |
2018-09-14 00:00:00 |
2018-257 |
21:50:00 |
XNAV App configuration update and restart |
2018-09-11 00:00:00 |
2018-254 |
17:39:00 |
XNAV App configuration update and restart |
2018-09-06 00:00:00 |
2018-249 |
14:54:00 |
XNAV App configuration update and restart |
2018-09-05 00:00:00 |
2018-248 |
17:13:00 |
XNAV App restart |
2018-09-04 00:00:00 |
2018-247 |
21:18:00 |
XNAV App configuration update and restart |
2018-09-04 00:00:00 |
2018-247 |
14:45:00 |
Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters |
2018-08-30 00:00:00 |
2018-242 |
15:02:00 |
XNAV App configuration update and restart |
2018-08-30 00:00:00 |
2018-242 |
09:45:00 |
Leak in Soyuz 55 module "fixed" |
2018-08-29 00:00:00 |
2018-241 |
09:45:00 |
Leak in Soyuz 55 module. Attitude (pitch) divergences. |
2018-08-24 00:00:00 |
2018-236 |
19:44:00 |
XNAV App configuration update and restart |
2018-08-21 00:00:00 |
2018-233 |
14:36:00 |
Performed Flash Memory TMR checks. |
2018-08-21 00:00:00 |
2018-233 |
14:19:00 |
XNAV App restart |
2018-08-21 00:00:00 |
2018-233 |
14:17:00 |
XNAV App configuration update |
2018-08-21 00:00:00 |
2018-233 |
13:56:00 |
Updated Earth Orientation Parameters |
2018-08-17 00:00:00 |
2018-229 |
19:17:00 |
XNAV App configuration update and restart |
2018-08-09 00:00:00 |
2018-221 |
18:50:00 |
XNAV App configuration update and restart |
2018-08-03 00:00:00 |
2018-215 |
16:37:00 |
Space-X CRC-15 Dragon released from ISS |
2018-08-01 00:00:00 |
2018-213 |
20:13:00 |
XNAV App configuration update |
2018-07-30 00:00:00 |
2018-211 |
13:38:00 |
Performed maintenance on flash memory partition |
2018-07-27 00:00:00 |
2018-208 |
21:19:00 |
XNAV App restart, now running in CAL mode |
2018-07-27 00:00:00 |
2018-208 |
21:17:00 |
XNAV App configuration update |
2018-07-27 00:00:00 |
2018-208 |
21:20:00 |
Performed Flash Memory TMR checks. Boot6.bin had TMR errors as did several of the spares. |
2018-07-26 00:00:00 |
2018-207 |
17:38:00 |
XNAV App configuration update and restart |
2018-07-26 00:00:00 |
2018-207 |
16:10:00 |
69P at SM Aft reboost |
2018-07-24 00:00:00 |
2018-205 |
20:21:00 |
Reset GEONS and GEONS Clock bias and updated EOP. GEONS had diverged at 18:14 |
2018-07-23 00:00:00 |
2018-204 |
01:45:00 |
Yaw Bias Manuever |
2018-07-21 00:00:00 |
2018-202 |
NaN |
ISS DCSU 3A Power on Reset, disrupting power service to J3AB (NICER survival heater and Op heater power service). POIC powered NICER pre-heaters in response. J3AB down for 8+ hours, minimal impact to NICER) |
2018-07-20 00:00:00 |
2018-201 |
20:40:00 |
XNAV App restart, now running in CAL mode |
2018-07-20 00:00:00 |
2018-201 |
20:38:00 |
XNAV App configuration update |
2018-07-18 00:00:00 |
2018-199 |
13:00:00 |
Maneuver to TEA |
2018-07-17 00:00:00 |
2018-198 |
22:04:00 |
XNAV App restart |
2018-07-17 00:00:00 |
2018-198 |
19:35:00 |
XNAV App configuration update |
2018-07-15 00:00:00 |
2018-196 |
12:35:00 |
Cygnus-9 Unberth and Release |
2018-07-15 00:00:00 |
2018-196 |
17:00:00 |
Yaw Bias Manuever |
2018-07-13 00:00:00 |
2018-194 |
18:56:00 |
XNAV App configuration update and restart |
2018-07-11 00:00:00 |
2018-192 |
02:09:00 |
OPM to +XVV |
2018-07-10 00:00:00 |
2018-191 |
19:25:00 |
Cygnus Reboost Maneuver |
2018-07-10 00:00:00 |
2018-191 |
20:45:00 |
Cygnus Reboost Maneuver to -XVV TEA |
2018-07-10 00:00:00 |
2018-191 |
02:04:00 |
ISS Maneuver to Post-Docking LVLH TEA |
2018-07-10 00:00:00 |
2018-191 |
01:39:00 |
70P Progress 2-Orbit Docking to DC-1 Nadir |
2018-07-09 00:00:00 |
2018-190 |
04:05:00 |
ISS Pitch Maneuver (+359 to +0.5) |
2018-07-09 00:00:00 |
2018-190 |
02:16:00 |
OPM to -XVV (Yaw +354 to +175 for Progress Docking) |
2018-07-09 00:00:00 |
2018-190 |
17:21:00 |
XNAV App configuration update |
2018-07-09 00:00:00 |
2018-190 |
23:29:00 |
ISS Yaw and Pitch Maneuver (+180 Yaw and +90 Pitch) |
2018-07-03 00:00:00 |
2018-184 |
22:01:00 |
XNAV App configuration update |
2018-07-02 00:00:00 |
2018-183 |
15:02:00 |
XNAV App restart |
2018-07-02 00:00:00 |
2018-183 |
10:57:00 |
SpaceX-15 Capture |
2018-06-29 00:00:00 |
2018-180 |
20:54:00 |
XNAV App restart |
2018-06-29 00:00:00 |
2018-180 |
19:32:00 |
XNAV App configuration update |
2018-06-29 00:00:00 |
2018-180 |
13:55:00 |
Performed TMR checks on Flash image 6 and 7 - no errors found |
2018-06-29 00:00:00 |
2018-180 |
13:42:00 |
Reset GEONS and GEONS Clock bias and updated EOP |
2018-06-26 00:00:00 |
2018-177 |
16:00:00 |
XNAV App restart |
2018-06-26 00:00:00 |
2018-177 |
15:54:00 |
XNAV App configuration update |
2018-06-25 00:00:00 |
2018-176 |
14:35:00 |
NICER back in Science Mode |
2018-06-25 00:00:00 |
2018-176 |
14:31:00 |
NICER PC commanded back to Ops Mode |
2018-06-25 00:00:00 |
2018-176 |
13:45:00 |
NICER PC Safe due to FDC |
2018-06-23 00:00:00 |
2018-174 |
08:15:00 |
69P Reboost |
2018-06-21 00:00:00 |
2018-172 |
14:56:00 |
XNAV App configuration update and restart |
2018-06-15 00:00:00 |
2018-166 |
18:50:00 |
XNAV App configuration update |
2018-06-15 00:00:00 |
2018-166 |
17:30:00 |
XNAV App restart |
2018-06-14 00:00:00 |
2018-165 |
09:32:00 |
N2 EWC EVA |
2018-06-12 00:00:00 |
2018-163 |
17:13:00 |
XNAV App configuration update and restart |
2018-06-08 00:00:00 |
2018-159 |
15:30:00 |
XNAV App configuration update and restart |
2018-06-08 00:00:00 |
2018-159 |
13:07:00 |
55S Soyuz Docking on MRM-1 |
2018-06-06 00:00:00 |
2018-157 |
15:18:00 |
XNAV App restart |
2018-06-04 00:00:00 |
2018-155 |
17:34:00 |
XNAV App configuration update and restart |
2018-06-03 00:00:00 |
2018-154 |
09:29:00 |
Manevuer to post-53S undocking attitude |
2018-06-03 00:00:00 |
2018-154 |
09:16:00 |
53S Soyuz undocking |
2018-06-01 00:00:00 |
2018-152 |
20:56:00 |
XNAV App restart |
2018-05-30 00:00:00 |
2018-150 |
17:04:00 |
XNAV App configuration update and restart |
2018-05-24 00:00:00 |
2018-144 |
18:45:00 |
XNAV App configuration update and restart |
2018-05-24 00:00:00 |
2018-144 |
09:20:00 |
OA9 Cygnus Capture (attitude man at 07:20) |
2018-05-22 00:00:00 |
2018-142 |
15:52:00 |
XNAV App restart |
2018-05-21 00:00:00 |
2018-141 |
14:32:00 |
XNAV App configuration update and restart |
2018-05-17 00:00:00 |
2018-137 |
14:15:00 |
XNAV App configuration update and restart |
2018-05-16 00:00:00 |
2018-136 |
17:30:00 |
PFCS EVA complete |
2018-05-16 00:00:00 |
2018-136 |
09:02:00 |
NICER targeting stopped |
2018-05-16 00:00:00 |
2018-136/137 |
NaN |
PFCS EVA |
2018-05-16 00:00:00 |
2018-136 |
10:15:00 |
NICER Stow complete |
2018-05-16 00:00:00 |
2018-136 |
14:21:00 |
NICER Powered off |
2018-05-16 00:00:00 |
2018-136 |
22:57:00 |
XNAV App Restarted |
2018-05-16 00:00:00 |
2018-136 |
18:40:00 |
NICER Powered on |
2018-05-16 00:00:00 |
2018-136 |
22:56:00 |
NICER resumes targeting |
2018-05-16 00:00:00 |
2018-136 |
21:50:00 |
NICER Deloyed |
2018-05-14 00:00:00 |
2018-134 |
15:27:00 |
XNAV App configuration update and restart |
2018-05-12 00:00:00 |
2018-132 |
22:07:00 |
69P Reboost |
2018-05-09 00:00:00 |
2018-128 |
17:20:00 |
XNAV App configuration update and restart |
2018-05-08 00:00:00 |
2018-128 |
20:47:00 |
FSW Flash Images 6 and 7 TMR checks (none found) |
2018-05-07 00:00:00 |
2018-127 |
17:51:00 |
Updated GPS EOP |
2018-05-05 00:00:00 |
2018-125 |
13:24:00 |
SpaceX 14 Release |
2018-05-04 00:00:00 |
2018-124 |
20:17:00 |
Updated XNAV app config and restarted |
2018-05-04 00:00:00 |
2018-124 |
23:17:00 |
SpaceX 14 Unberth Maneuver |
2018-05-01 00:00:00 |
2018-121 |
15:26:00 |
Updated XNAV app config and restarted |
2018-04-27 00:00:00 |
2018-117 |
NaN |
MISSE Robotics Day 7 |
2018-04-26 00:00:00 |
2018-116 |
18:56:00 |
XNAV App configuration update and restart |
2018-04-26 00:00:00 |
2018-116 |
18:42:00 |
XNAV App configuration update |
2018-04-26 00:00:00 |
2018-116 |
NaN |
MISSE Robotics Day 6 |
2018-04-24 00:00:00 |
2018-114 |
17:36:00 |
XNAV App configuration update |
2018-04-24 00:00:00 |
2018-114 |
14:52:00 |
Employing new RTSs to allow modified detector configuration for SCO-X1 observations starting at 15:14. |
2018-04-23 00:00:00 |
2018-113 |
21:46:00 |
Reset XNAV app |
2018-04-23 00:00:00 |
2018-113 |
14:12:00 |
Reset XNAV app |
2018-04-20 00:00:00 |
2018-110 |
18:26:00 |
Updated XNAV app config and restarted |
2018-04-19 00:00:00 |
2018-110 |
03:20:00 |
XNAV App reconfigured and running. Reset performed at 04:02. |
2018-04-19 00:00:00 |
2018-109 |
23:06:00 |
NICER Reactivated and Redeployed after MISSE MSC installation. MEB on at 109-23:20. Began NICER observations at 110-02:00. |
2018-04-19 00:00:00 |
2018-109 |
NaN |
MISSE Robotics Day 5 |
2018-04-18 00:00:00 |
2018-108 |
06:12:00 |
NICER powered on after MISSE activities complete to collect background data. NICER still stowed. - MEB back on at 06:23. MPUs back on at 07:14. |
2018-04-18 00:00:00 |
2018-108 |
10:50:00 |
69P Reboost |
2018-04-18 00:00:00 |
2018-108 |
16:50:00 |
NICER powered off for MISSE MSC activities. MPUs off at 16:58. MEB off at 17:02. |
2018-04-18 00:00:00 |
2018-108 |
NaN |
MISSE Robotics Day 4 |
2018-04-17 00:00:00 |
2018-107 |
NaN |
MISSE Robotics Day 3 |
2018-04-17 00:00:00 |
2018-107 |
13:40:00 |
Science observations suspended. Begin to stow for MISSE MSC installation activities. ROBO arm blocking NICER FOV hours before this. |
2018-04-17 00:00:00 |
2018-107 |
17:09:00 |
NICER powered off for MISSE MSC installation activities - MPUs off at 17:14, MEB off at 17:25 |
2018-04-16 00:00:00 |
2018-106 |
NaN |
MISSE Robotics Day 2 |
2018-04-15 00:00:00 |
2018-105 |
NaN |
MISSE Robotics Day 1 |
2018-04-13 00:00:00 |
2018-103 |
20:00:00 |
Reset XNAV app |
2018-04-13 00:00:00 |
2018-103 |
21:28:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-04-12 00:00:00 |
2018-102 |
15:37:00 |
Reset XNAV app |
2018-04-10 00:00:00 |
2018-100 |
18:35:00 |
Updated XNAV app config and restarted |
2018-04-09 00:00:00 |
2018-099 |
08:33:00 |
XNAV App started |
2018-04-09 00:00:00 |
2018-099 |
07:40:00 |
NICER began science observations after MISSE-FF installation |
2018-04-09 00:00:00 |
2018-099 |
04:47:00 |
NICER powered on |
2018-04-08 00:00:00 |
2018-098 |
18:11:00 |
NICER powered off |
2018-04-08 00:00:00 |
2018-098 |
15:50:00 |
Terminated NICER science observations and began stow and deactivation for MISSE-FF installation |
2018-04-04 00:00:00 |
2018-094 |
14:47:00 |
SpaceX-14 Berth |
2018-04-04 00:00:00 |
2018-094 |
11:00:00 |
SpaceX-14 Capture |
2018-04-03 00:00:00 |
2018-093 |
16:18:00 |
Updated XNAV app config and restarted |
2018-03-30 00:00:00 |
2018-089 |
17:56:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-03-29 00:00:00 |
2018-088 |
11:10:00 |
N3 EWC EVA |
2018-03-28 00:00:00 |
2018-087 |
15:33:00 |
Updated GPS GEONS EOP |
2018-03-28 00:00:00 |
2018-087 |
13:50:30 |
Progress Vehicle (68P) undocking from DC-1 |
2018-03-27 00:00:00 |
2018-086 |
NaN |
Began SEXTANT-driven operations for NICER |
2018-03-26 00:00:00 |
2018-085 |
16:03:00 |
Unexpected ISS Ku-Comm unit reset causing a permanent NICER data loss from 16:17 - 16:42. |
2018-03-26 00:00:00 |
2018-085 |
14:21:00 |
Updated XNAV app config and restarted |
2018-03-26 00:00:00 |
2018-085 |
17:19:00 |
Reset XNAV app |
2018-03-25 00:00:00 |
2018-084 |
13:15:00 |
Manuever to SARJ Parked TEA for 68P Prop Purge |
2018-03-24 00:00:00 |
2018-083 |
06:10:00 |
Manuever OPM to +XVV |
2018-03-23 00:00:00 |
2018-082 |
19:32 to 19:43 |
Series of commanded NICER ST resets which left PC in safe mode. Safe mode exited at 19:43. |
2018-03-23 00:00:00 |
2018-082 |
19:40:00 |
54S Docking |
2018-03-23 00:00:00 |
2018-082 |
07:10:00 |
Maneuver OPM to -XXV for 54S Docking |
2018-03-22 00:00:00 |
2018-081 |
18:59:00 |
Updated XNAV app config and restarted |
2018-03-19 00:00:00 |
2018-078 |
18:20:00 |
Updated XNAV app config and restarted |
2018-03-14 00:00:00 |
2018-073 |
14:44:00 |
Reset XNAV app |
2018-03-13 00:00:00 |
2018-072 |
21:27:00 |
Updated XNAV app config and restarted |
2018-03-13 00:00:00 |
2018-072 |
20:45:00 |
69P Reboost |
2018-03-12 00:00:00 |
2018-071 |
20:43:00 |
Reset XNAV app |
2018-03-09 00:00:00 |
2018-068 |
21:09:00 |
Updated XNAV app config and restarted |
2018-03-06 00:00:00 |
2018-065 |
NaN |
XNAV App ran in opportunistic mode observing PSR_B1937+21 |
2018-03-05 00:00:00 |
2018-064 |
19:59:00 |
MPU-5 Powered off due to overcurrent trip on PDB board. MPU recovery complete at ~ 22:30. |
2018-02-27 00:00:00 |
2018-058 |
23:08:00 |
52S Undocking from MRM2 |
2018-02-22 00:00:00 |
2018-053 |
08:52:00 |
52S Thruster Test on MM |
2018-02-22 00:00:00 |
2018-053 |
19:14:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-02-16 00:00:00 |
2018-047 |
NaN |
POA LEE Swap US EVA |
2018-02-16 00:00:00 |
2018-047 |
19:11:00 |
Restarted XNAV app after halting it in December 2017 |
2018-02-15 00:00:00 |
2018-046 |
10:43:00 |
69P Docking to SM-Aft |
2018-02-13 00:00:00 |
2018-044 |
17:56:00 |
Reset GEONS and clock bias |
2018-02-02 00:00:00 |
2018-033 |
NaN |
RS EVA 44 |
2018-01-30 00:00:00 |
2018-030 |
14:40:00 |
SM Reboost |
2018-01-30 00:00:00 |
2018-030 |
17:11:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-01-23 00:00:00 |
2018-023 |
NaN |
LEE B R&R US EVA |
2018-01-18 00:00:00 |
2018-018 |
15:19:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-01-17 00:00:00 |
2018-017 |
20:15:00 |
SM Main Engine Reboost |
2018-01-13 00:00:00 |
2018-013 |
10:00:00 |
SpX-13 Unberth from N2-Nadir |
2018-01-09 00:00:00 |
2018-009 |
17:35:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-01-02 00:00:00 |
2018-002 |
17:05:00 |
TSIS at ELC-3 vented 1.5L of Argon from 17:05:38 to 17:10:00. |
2017-12-28 00:00:00 |
2017-362 |
01:03:00 |
67P Undocking from SM-Aft |
2017-12-27 00:00:00 |
2017-361 |
21:04:00 |
GEONS diverged (likely due to manuever on DOY 360 for Progress docking) Recovered GEONS at 361-21:37. |
2017-12-19 00:00:00 |
2017-353 |
08:43:00 |
53S Docking to MRM1 |
2017-12-17 00:00:00 |
2017-351 |
11:00:00 |
SpaceX-13 Capture N2-Nadir |
2017-12-15 00:00:00 |
2017-349 |
21:58:00 |
GEONS diverged (likely due to DOY 349 for Soyuz undocking) Recovered GEONS at 349-22:23 |
2017-12-14 00:00:00 |
2017-348 |
05:14:00 |
51S Undocking from MRM1 |
2017-12-12 00:00:00 |
2017-346 |
05:20:00 |
67P Prop Purge |
2017-12-08 00:00:00 |
2017-342 |
10:17:00 |
51S Thruster Test |
2017-12-06 00:00:00 |
2017-340 |
17:17:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2017-12-06 00:00:00 |
2017-340 |
13:12:00 |
OA8 Release from N1-Nadir |
2017-12-01 00:00:00 |
2017-335 |
21:12:00 |
Halted XNAV App |
2017-11-29 00:00:00 |
2017-333 |
15:50:00 |
67P Reboost |
2017-11-28 00:00:00 |
2017-332 |
18:29:00 |
XNAV App configuration update |
2017-11-28 00:00:00 |
2017-332 |
18:31:00 |
XNAV App Restart |
2017-11-22 00:00:00 |
2017-326 |
17:51:00 |
51S Thruster Test |
2017-11-22 00:00:00 |
2017-326 |
17:15:00 |
XNAV App configuration update |
2017-11-20 00:00:00 |
2017-324 |
20:29:00 |
XNAV App configuration update |
2017-11-20 00:00:00 |
2017-324 |
20:31:00 |
XNAV App Restart |
2017-11-20 00:00:00 |
2017-324 |
17:52:00 |
51S Thruster Test |
2017-11-20 00:00:00 |
2017-324 |
20:49:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2017-11-20 00:00:00 |
2017-324 |
19:16:00 |
Reset GEONS and GEONS Clock bias and updated EOP |
2017-11-16 00:00:00 |
2017-320 |
18:11:00 |
51S Thruster Test |
2017-11-14 00:00:00 |
2017-318 |
10:04:00 |
OA8 Capture at N1-Nadir |
2017-11-10 00:00:00 |
2017-314 |
20:10:00 |
51S Thruster Test |
2017-11-05 00:00:00 |
2017-309 |
01:59:00 |
NICER leaves PC Safe and returns to nominal operations. |
2017-11-04 00:00:00 |
2017-308 |
13:56:00 |
NICER Star Tracker Reset (likely due to SEU) causes NICER PC Safe |
2017-11-02 00:00:00 |
2017-306 |
18:37:00 |
MPU Detector thresholds for the Day 306 through 310 LMC-X1 targets were adjusted to be Nominal + 190 as follows:\n2017-306-18:37:20 | /FSW_SC_STARTRTS RTSID=228\n2017-306-23:19:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-02:24:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-07:04:00 | /FSW_SC_STARTRTS RTSID=228\n2017-307-10:10:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-11:43:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-17:56:40 | /FSW_SC_STARTRTS RTSID=228\n2017-308-00:10:47 | /FSW_SC_STARTRTS RTSID=228\n2017-308-01:40:38 | /FSW_SC_STARTRTS RTSID=228\n2017-308-03:13:22 | /FSW_SC_STARTRTS RTSID=228\n2017-308-04:46:02 | /FSW_SC_STARTRTS RTSID=228\n2017-308-09:32:54 | /FSW_SC_STARTRTS RTSID=228\n2017-308-12:33:49 | /FSW_SC_STARTRTS RTSID=228\n2017-308-21:54:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-00:59:54 | /FSW_SC_STARTRTS RTSID=228\n2017-309-02:28:41 | /FSW_SC_STARTRTS RTSID=228\n2017-309-04:02:18 | /FSW_SC_STARTRTS RTSID=228\n2017-309-07:10:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-08:43:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-13:21:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-14:53:37 | /FSW_SC_STARTRTS RTSID=228\n2017-310-00:09:54 | /FSW_SC_STARTRTS RTSID=228\n2017-310-01:42:34 | /FSW_SC_STARTRTS RTSID=228\n2017-310-03:16:35 | /FSW_SC_STARTRTS RTSID=228\n2017-310-07:53:14 | /FSW_SC_STARTRTS RTSID=228\n2017-310-11:01:55 | /FSW_SC_STARTRTS RTSID=228 |
2017-11-02 00:00:00 |
2017-306 |
03:15:00 |
67P Reboost |
2017-10-20 00:00:00 |
2017-293 |
NaN |
EVA 46 |
2017-10-16 00:00:00 |
2017-289 |
11:04:00 |
68P Docking to DC-1 Nadir |
2017-10-10 00:00:00 |
2017-283 |
NaN |
EVA CP9 R&R LEE Lube |
2017-10-05 00:00:00 |
2017-278 |
NaN |
EVA LEE A R&R |
2017-09-27 00:00:00 |
2017-270 |
16:50:00 |
67P Reboost |
2017-09-17 00:00:00 |
2017-260 |
08:40:00 |
SpaceX-12 Dragon Unberth |
2017-09-13 00:00:00 |
2017-256 |
02:55:00 |
Soyuz (52S) Docking to MRM2 |
2017-09-13 00:00:00 |
2017-256 |
14:46:00 |
Yaw Maneuver to +XVV (~90 minutes) for 52S |
2017-09-12 00:00:00 |
2017-255 |
17:08:00 |
Yaw Maneuver to -XVV (~90 minutes) for 52S |
2017-09-07 00:00:00 |
2017-250 |
14:20:00 |
Switched PPS source to GEONS |
2017-09-06 00:00:00 |
2017-249 |
18:46:00 |
Switched PPS source to SPS (due to Earth Orientation Parameters update) |
2017-09-02 00:00:00 |
2017-245 |
21:58:00 |
Soyuz (50S) Undocking from MRM2 |
2017-07-31 00:00:00 |
2017-226 |
14:46:00 |
SpaceX-12 Dragon Berth |
2017-07-31 00:00:00 |
2017-212 |
17:25:00 |
Rebooted the Star Tracker (MIRU quaternion was corrupted due to geons reset) |
2017-07-31 00:00:00 |
2017-212 |
17:21:00 |
Switched PPS source to GEONS |
2017-07-31 00:00:00 |
2017-212 |
16:51:00 |
Switched PPS source to SPS |
2017-07-31 00:00:00 |
2017-212 |
15:40:00 |
GEONS Reset (to reset GEONS clock bias) - had to repeat several times |
2017-07-29 00:00:00 |
2017-210 |
09:44:00 |
Yaw Maneuver to +XVV (~90 minutes) for 51S |
2017-07-28 00:00:00 |
2017-209 |
21:54:00 |
Soyuz (51S) Docking to MRM1 |
2017-07-28 00:00:00 |
2017-209 |
13:39:00 |
Yaw Maneuver to -XVV (~90 minutes) for 51S |
2017-07-21 00:00:00 |
2017-202 |
13:49:00 |
Switched PPS source to GEONS |
2017-07-20 00:00:00 |
2017-201 |
19:59:00 |
Switched PPS source to SPS |
2017-07-20 00:00:00 |
2017-201 |
17:46:00 |
Progress Vehicle (66P) Undocking from DC1-Nadir |
2017-07-18 00:00:00 |
2017-199 |
21:01:00 |
MPU-3 back in science mode |
2017-07-18 00:00:00 |
2017-199 |
20:40:00 |
MPU-3 was powered off due to likely SEU |
2017-07-02 00:00:00 |
2017-183 |
15:46:00 |
SpaceX-11 Dragon Unberth |
2017-07-01 00:00:00 |
2017-182 |
13:26:00 |
Switched to Science Mode 7 (photons and resets) all the time |
2017-06-28 00:00:00 |
2017-179 |
16:54:00 |
Switched PPS source to GEONS |
2017-06-28 00:00:00 |
2017-179 |
16:25:00 |
Switched PPS source to SPS |
2017-06-24 00:00:00 |
2017-175 |
23:09:00 |
Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. |
2017-06-23 00:00:00 |
2017-174 |
21:52:00 |
Switched PPS source to GEONS |
2017-06-22 00:00:00 |
2017-173 |
18:37:00 |
Switched to Science Mode 1 (only photons) for Orbit Day and Mode 7 (photons and resets) for Orbit Night |
2017-06-21 00:00:00 |
2017-172 |
17:44:00 |
Tightened deadbands to 0.5 degrees on heaters for detector and concentrator plates (maintain at +5 deg C) |
2017-06-19 00:00:00 |
2019-170 |
06:45:12 |
NICER Re-deploy complete and Science Data Collection Begins (ROBO is parked in the NICER FOV until later today which will affect 20% of the targets) |
2017-06-18 00:00:00 |
2017-169 |
08:25:00 |
First intentional X-rays received from Scorpious-X1 |
2017-06-18 00:00:00 |
2017-169 |
23:09:00 |
Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. Actually started making adjustments at 11:52z. |
2017-06-17 00:00:00 |
2017-168 |
12:34:00 |
Updated on-board sequence to keep the 4 known bad detectors disabled. |
2017-06-17 00:00:00 |
2017-167 |
11:50:00 |
Set the MPUs to Science Mode 1 (photons only) |
2017-06-16 00:00:00 |
2017-167 |
07:32:00 |
End of Dual threshold scan |
2017-06-16 00:00:00 |
2017-167 |
10:01:00 |
Start of Dual threshold scan, run #2 - stowed |
2017-06-16 00:00:00 |
2017-167 |
14:30:00 |
First significant Deployment motion |
2017-06-16 00:00:00 |
2017-167 |
00:06:00 |
Start of Dual threshold scan - stowed |
2017-06-16 00:00:00 |
2017-167 |
00:02:00 |
Power-on ST |
2017-06-16 00:00:00 |
2017-167 |
13:15:00 |
Power-on GCE, prep for deployment |
2017-06-16 00:00:00 |
2017-167 |
11:42:00 |
Progress Vehicle (67P) Docking at SM-Aft |
2017-06-16 00:00:00 |
2017-167 |
16:01:00 |
Range of Motion Started |
2017-06-16 00:00:00 |
2017-167 |
14:05:00 |
End of Dual threshold scan, run #2 |
2017-06-16 00:00:00 |
2017-167 |
14:10:00 |
Start of Deployment sequence |
2017-06-16 00:00:00 |
2017-167 |
14:50:00 |
Deployment to heads down complete |
2017-06-16 00:00:00 |
2017-167 |
15:47:00 |
Deployment to heads up complete |
2017-06-16 00:00:00 |
2017-167 |
20:07:00 |
Range of Motion Completed |
2017-06-15 00:00:00 |
2017-166 |
22:29:00 |
Power-on GPS |
2017-06-15 00:00:00 |
2017-166 |
20:19:00 |
Frangibolt 4 released |
2017-06-15 00:00:00 |
2017-166 |
21:37:00 |
Set Conc temp settings and Det temp setting to nominal (5 deg C), cooling down to operational temp |
2017-06-15 00:00:00 |
2017-166 |
04:12:00 |
Frangibolt 3 released |
2017-06-15 00:00:00 |
2017-166 |
22:33:00 |
Power-on MPUs |
2017-06-15 00:00:00 |
2017-166 |
23:45:00 |
Enable Science (mode 7 - photons and resets) - stowed |
2017-06-15 00:00:00 |
2017-166 |
05:32:00 |
Frangibolt 2 released |
2017-06-14 00:00:00 |
2017-165 |
08:19:00 |
Latch |
2017-06-14 00:00:00 |
2017-165 |
08:06:00 |
NICER Activation/Enable science (mode 7 - phtons and resets) - Stowed |
2017-06-14 00:00:00 |
2017-165 |
08:26:00 |
Power-off GCE |
2017-06-14 00:00:00 |
2017-165 |
08:13:00 |
NICER Activation/Power-on GCE |
2017-06-14 00:00:00 |
2017-165 |
14:16:00 |
Start Frangibolt release process |
2017-06-14 00:00:00 |
2017-165 |
06:38:00 |
NICER Activation/Power-on all MPUs |
2017-06-14 00:00:00 |
2017-165 |
06:32:00 |
NICER Activation/Power-on Star Tracker |
2017-06-14 00:00:00 |
2017-165 |
06:20:00 |
NICER Activation/Power-on GPS |
2017-06-14 00:00:00 |
2017-165 |
13:02:00 |
Power-off MPUs, prep for deployment |
2017-06-14 00:00:00 |
2017-165 |
04:28:00 |
NICER Activation/Power-on MEB |
2017-06-14 00:00:00 |
2017-165 |
16:00:00 |
Power-on GCE to check for frangibolt release |
2017-06-14 00:00:00 |
2017-165 |
16:07:00 |
Frangibolt 1 released |
2017-06-14 00:00:00 |
2017-165 |
22:00:00 |
Discretes 1 and 2 disabled to turn on pre-heaters |
2017-06-14 00:00:00 |
2017-165 |
22:42:00 |
Set Conc temp settings to 30 and Det temp setting to 20, warming up to actuate frangibolts again |
2017-06-14 00:00:00 |
2017-165 |
22:51:00 |
Power-off GCE |
2017-06-14 00:00:00 |
2017-165 |
22:52:00 |
Power-off ST |
2017-06-14 00:00:00 |
2017-165 |
22:53:00 |
Power-off GPS |
2017-06-14 00:00:00 |
2017-165 |
21:34:00 |
Discretes 1 and 2 enabled to turn off pre-heaters |
2017-06-13 00:00:00 |
2017-165 |
03:53:00 |
NICER Installation |
2017-06-11 00:00:00 |
2017-162 |
22:36:00 |
NICER Extraction |
2017-06-05 00:00:00 |
2017-156 |
17:46:00 |
SpaceX-11 Berth |
2017-06-03 00:00:00 |
2017-154 |
21:07:00 |
SpaceX-11 Launch |
2/29/2025 |
2025-060 |
22:40:01 |
Load contains commanding to look away from Progress 91 dock at SM-AFT.NICER looking away from 2025-060-22:40:01 to 2025-060-23:37:09. Docking occurred at 23:03ish. |
NaN |
2018-183,186-189 |
NaN |
Space-X Robotics |
NaN |
NaN |
NaN |
NaN |
NaN |
NaN |
NaN |
NaN |
NaN |
2025-072 |
16:00:00 |
ROBO in NICER FOV - Ops: I72_UNSTOW_SPDM, Xlate 3 to 6, Unstow RMCT 1 until 073-01:30 |